I want to set up a small-scale barrel-filled pure water plant, what equipment do I need? How much money do I need?

Depending on the quality of your raw water and the quality of the water you need to produce. The process of the equipment needs to be based on your water quality requirements and water production requirements, as well as the output *** with the decision.

The body needs to determine your production output and the degree of automation. The infrastructure, the financial readiness, the purchase of equipment, the normal operating conditions of the water plant.

You first need to understand the water plant, the required documents.

The following give you a little equipment advice:

Production equipment process introduction:

Raw water tank - booster pump - quartz sand filter - activated carbon filter - security filters - reverse osmosis membranes - ultraviolet sterilizers - ozone sterilizers

The above process is only a reference, the specific process needs to be adjusted according to the report on the quality of the raw water.

The above process is for reference only.

Barrel water production process introduction:

Full-automatic cap puller - full-automatic barrel brushing machine - full-automatic bottle loading machine - full-automatic filling machine - full-automatic light inspection film collecting machine ---- full-automatic barrel bagging machine

The capacity and degree of automation of the above filling system can be configured as an option.

The two integrated, you can produce barrels of water, but this is only the production of equipment, does not include the water plant internal aseptic workshop construction equipment and water plant laboratory equipment. If you want to run into a certain scale of pure water plant must start from the following procedures: "health license", "production license", "environmental protection license", "practitioners health inspection", "industrial and commercial registration", "tax registration.

Pure water production enterprise procedures and reporting materials

One, to the Industrial and Commercial Bureau of the name pre-approval

Two, health supervision for food hygiene license

Reporting materials:

Application form;

2. Employee health certificates copies (1 person, 1 certificate, not handled in the inspection section in a timely manner);

3. Notice of approval of the enterprise name;

4. A copy of ID card (of the enterprise legal person, the person in charge).

5. Notice of commitment to health license;

6. Production and business premises and the surrounding environment plan (indicating the functional distribution, sanitation and production equipment set up layout plan);

7. Process, formula (production and processing industry);

8. Health inspection report;

9. There are the appropriate sanitation system, on the wall.

Three, the Industrial and Commercial Bureau for business license

1. Individual industrial and commercial households in the business location of the industrial and commercial office;

2. Limited liability companies in the Administrative Service Center, Bureau of Industry and Commerce window

Declaration materials

1, the company chairman of the application for the establishment of a registration signed by a copy of the application form;

2, all the shareholders to designate **** * or *** with the proxy certificate;

3, a copy of the original articles of association;

4, a copy of the original certificate of capital verification issued by a legally qualified capital verification institution;

5, a copy of the shareholders' certificate of legal personality or a copy of the identity of a natural person; (a copy of the company's business license)

6, a copy of documents setting forth the company's directors, supervisors, Approval documents that must be submitted for approval.

4, engraved official seal

5, the Quality Supervision Bureau for the organization code

1, the original business license and a copy of each;

2, a copy of the legal person or person in charge of the ID card;

3, the code certificate declaration form (with the seal) a copy.

6, tax registration

1, the original business license and a copy of each;

2, a legal person or the person in charge of a copy of the ID card;

3, tax registration application form (stamped with the official seal) a copy.

4, Organization Code Certificate

seven, the Water Authority for water permits

Declaration materials: 1. "Application for Water Permit" a copy of;

2, the feasibility of the construction project or water resources demonstration report a copy of;

3, a third party has an interest in a copy of the supporting materials.

Eighth, the Quality Supervision Bureau for food production license

Procedure: the county preliminary examination - the city review and inspection - reported to the state for approval

Declaration materials:

1. Application for food production license in one form Three;

2, a copy of the business license of industrial and commercial enterprises in triplicate;

3, a copy of the food hygiene license in triplicate;

4, a copy of the enterprise code certificate in triplicate;

5, the person in charge of the enterprise (legal ***** person) ID card in triplicate;

6, two copies of the layout of the production site of the enterprise;

7, two copies of the enterprise production art flow chart;

8, a copy of the enterprise quality management documents;

9, a copy of the text of the enterprise standards;

10, H ***** system certification, export food hygiene registration (registration) certificate copy of the construction of aseptic workshop, a primary washing tank, a secondary washing tank, locker rooms, foot pools, air showers and other Construction of purification equipment and laboratory. For the construction of the height of the plant, you need to refer to the height of the equipment; the internal partition wall of the plant to pay attention to the size of the equipment and the placement of the orientation; the floor needs to be floor tiles, filling workshop needs to be pasted wall tiles.

As for the specific design drawings, the need for equipment production plant design, we do customers are first by the customer to provide a detailed floor plan of the plant, and then according to the floor plan and equipment size design corresponding to the plant diagram.