Baicheng city urban stormwater drainage management measures

Chapter I General Provisions Article 1 In order to consolidate and develop the results of sponge city construction, strengthen ecological environmental protection, make full use of rainwater resources, according to the State Council, "urban drainage and sewage treatment regulations" and other relevant laws and regulations, combined with the city's actuality, the development of these measures. Article 2 These measures apply to the central city of white city within the scope of stormwater drainage and its management activities. Article 3 The rainwater drainage, refers to the use of rainwater drainage engineering facilities, through the rainwater absorption, storage and slow release, control of rainwater runoff and use of activities.

The rainwater drainage engineering facilities, including storm drains, permeable paving, rainwater storage and pumping stations and other facilities.

Stormwater drainage engineering facilities are divided into public **** engineering facilities and self-built engineering facilities. Public *** engineering facilities refers to government investment or participation in the construction of investment for the public *** service stormwater drainage engineering facilities; self-built engineering facilities refers to the property owner's own funds for their own service stormwater drainage engineering facilities. Article 4 The municipal housing and urban-rural construction administrative department is responsible for the guidance, management and supervision of stormwater drainage. The municipal drainage management unit is responsible for the daily work of stormwater drainage. Article 5 municipal drainage management unit in the stormwater drainage work to perform the following duties:

(a) in accordance with the relevant technical standards and norms of the stormwater drainage engineering facilities for daily inspection, regular overhaul, maintenance, to ensure that the engineering facilities are intact and normal operation;

(b) regular desilting, to keep the rainwater pipe network smooth;

(c) stormwater drainage engineering facilities Occurrence of pipe water, pipe rupture, pumping station failure, as well as well cover broken, lost, should be promptly repaired;

(4) in accordance with the law or in accordance with the agreement shall perform other duties. Article 6 The Municipal Development and Reform Commission, natural resources, ecological environment, finance, water conservancy and other departments shall, in accordance with their respective responsibilities, with the rainwater drainage and management work. Article 7 The work of rainwater drainage adhere to the principles of ecology-based, planning-led, supporting construction, unified management, comprehensive utilization. Article 8 The government encourages and supports rainwater runoff control and utilization of scientific research, as well as the introduction and promotion of new technologies, new materials, new equipment to improve rainwater runoff control and utilization. Chapter II Planning and Construction Management Article 9 The municipal housing and urban-rural construction administrative department shall, in conjunction with the municipal natural resources department, prepare the "Special Plan for Stormwater Drainage in Urban Areas of Baicheng City" based on the overall planning of territorial space and the "Special Plan for Sponge City of Baicheng City", and take the control rate of the total annual runoff as a rigid control index, and specify the layout and construction schedule of permeable paving, rainwater pipelines, and rainwater storing facilities. Content, reported to the municipal people's government for approval and then organize and implement.

"BaiCheng city urban storm water drainage special planning" once approved and published, should be strictly enforced; economic and social development due to the need for modification, should be submitted for approval in accordance with the original approval procedures. Article 10 for more than 20,000 square meters of new construction, alteration, expansion of buildings or residential projects, should be through the use of green space topography, permeable paving, rainwater storage facilities, such as rainwater consumption, and to achieve the "BaiCheng city urban rainwater drainage special planning" rainwater runoff control standards. Article XI in the city center of Baicheng city within the scope of the construction of rainwater drainage engineering facilities and residential community of self-built rainwater drainage engineering facilities should be in line with the "Baicheng City, urban areas of rainwater drainage special planning" requirements. Article XII of rainwater runoff control facilities should be the main project with the construction of the project design, construction, use at the same time, its construction costs should be included in the project construction investment. Article XIII implementation of rainwater and sewage diversion and discharge system. New construction, alteration, expansion of drainage facilities should be in accordance with the "white city urban storm water drainage special planning" set up rainwater, sewage diversion and discharge facilities.

Already practiced rainwater and sewage diversion area, prohibit the rainwater network and sewage network mixed with each other, mixed discharge.

has not yet achieved rainwater and sewage diversion discharge area, the municipal housing and urban-rural construction administrative department shall organize the preparation of engineering facilities diversion renovation plan, the property rights unit shall be strictly in accordance with the renovation plan for the time specified in the renovation, and gradually realize the rainwater and sewage diversion. Article 14 The construction of rainwater drainage engineering facilities shall accept the quality supervision of construction engineering quality supervision organization. Rainwater drainage engineering facilities after completion, the construction unit shall organize acceptance according to law. Completion inspection and acceptance, before being delivered for use, and from the date of completion and acceptance within 15 days, the completion and acceptance report and related information will be reported to the municipal housing and urban-rural construction administrative department for the record; acceptance fails, should be rectified or take remedial measures. Chapter III Facility Maintenance and Management Article 15 of the public **** storm water drainage engineering facilities by the municipal drainage management unit is responsible for the maintenance and operation.

Public **** storm water drainage engineering facilities can be through franchising, government purchase of services, etc., to determine the professional units to implement the maintenance and operation.

Self-constructed stormwater drainage engineering facilities by the property owner or his client, the user is responsible for the maintenance and operation. Article XVI of rainwater drainage engineering facilities maintenance and operation of responsible units should strengthen the rainwater pumping stations, rainwater pipes and their inlets, inspection wells, ventilation wells and other engineering facilities of daily inspection, repair and maintenance to ensure the safe operation of facilities. Article XVII of rainwater drainage engineering facilities maintenance and operation unit shall arrange for specialized personnel, engaged in rainwater pipe network maintenance, wells and limited space operations on-site safety management, set up conspicuous warning signs, take effective measures to avoid personnel fall, vehicle entrapment, and timely recovery of manhole covers.

Related special operators, should be in accordance with the relevant provisions of the state to obtain the appropriate qualification certificate.