Project implementation plan and implementation plan

Project implementation plan and implementation plan template

Project implementation plan and implementation plan template. In the workplace, before we implement a project, we must first come up with a feasible project implementation plan and implementation plan, so as to convince others. Next, I will take you through the project implementation plan and implementation plan template.

Project implementation plan and implementation plan 1 In order to strengthen the management of engineering construction projects in primary and secondary schools, clarify the target responsibilities and ensure the smooth implementation of engineering construction projects. According to the requirements of the Notice of the Ministry of Education, the State Planning Commission and the Ministry of Finance on the Measures for the Implementation and Management of the Reconstruction Project of Dangerous Buildings in Primary and Secondary Schools in China, combined with the actual situation in our district, the implementation opinions on the management of school construction projects are formulated, which are expected to be implemented.

I. Organizational structure

The establishment of xx District Education Bureau Engineering Construction Project Leading Group.

Team leader: xx

Deputy leader: xx

Member: xxxxxxxxxxx

Each project school should set up a corresponding leading group for engineering construction projects.

Second, the project construction implementation procedures

Engineering construction project procedures must be carried out in accordance with the requirements of existing laws and regulations.

1, the project is established. The school wrote an application to the District Education Bureau-the District Education Bureau sent a letter to the National Development and Reform Commission-and the National Development and Reform Commission issued a reply to the project.

2. planning. The school provides the overall planning scheme, the preliminary design scheme of the proposed building (building plan, elevation and profile) and the effect diagram to the District Planning Bureau for approval. Those who pass the examination shall apply for a planning permit (copy) and issue a red line map.

3. Report the construction situation. After handling the planning permit, apply to the construction management unit of the Construction Bureau, provide relevant materials for the construction application, and fill in the application form.

4. Survey and design. If the degree of earthquake damage is relatively light, the original design unit shall issue reinforcement measures; If the earthquake damage is serious, the design unit can issue the construction drawing only after the appraisal conclusion is issued by the unit with appraisal qualification; For new projects, the school entrusts the survey unit to issue a geological survey report, and the design unit issues a construction drawing; After the construction drawing is completed, it is necessary to go to the district fire brigade for fire control audit; Entrust the construction drawing review company to conduct the construction drawing review and issue the construction drawing review report, and then go to the construction management unit of the District Construction Bureau to conduct the construction drawing review and put it on record.

5. Bidding procedure: Determine the agency: go to the National Development and Reform Commission to compare and select the bidding agency online, register the agency online, invite relevant personnel (from the Supervision Bureau, the Development and Reform Commission, the Tendering Office of the Construction Bureau, the supervision unit of the Education Bureau, and the financial unit) to participate in the random selection meeting of the agency, randomly determine two agencies, negotiate with them on operating procedures and fees, and determine the agency, and report to the Tendering Office of the Development and Reform Commission and the Construction Bureau for the record.

Bidding process: the intermediary agency or qualified cost organization will calculate the engineering quantity, and the financial evaluation will determine the control price and bill of quantities (the school will write an evaluation application to the Education Bureau, and the Education Bureau will send a letter to the Evaluation Center of the Finance Bureau, which will accept it within 25 working days. Control price and bidding list must be based on financial evaluation conclusion), making bidding (comparison) announcement, filing bidding documents (NDRC and Construction Bureau), publishing bidding announcement or comparison announcement online, registering and issuing bidding documents, inviting relevant departments (Disciplinary Committee, NDRC, Bidding Office of Construction Bureau, supervision of Education Bureau, relevant personnel of financial planning unit) to participate in bid opening, bid evaluation supervision, announcement of bid evaluation results, issuance of bid-winning notice, and issuance or issuance by the construction unit.

6. Construction stage: make sure that the supervision unit signs the supervision contract, go to the Tendering Office of the Construction Bureau to bid for the record, go to the construction management unit of the Construction Bureau to handle the construction permit (provide the materials list as required and pay the relevant fees), go through the quality and safety supervision procedures (pay the supervision fee of 3.5% of the bid price), pay off the work of the Planning Bureau, start construction, coordinate the construction quality, progress, safety supervision and various relationships, and conduct the initial inspection and final acceptance.

Third, the project fund management

The project implements the county-level reimbursement system and pays the project amount according to the engineering quantity. The use of special funds for the project includes all expenses such as planning fees, design fees, geological prospecting fees, supervision fees, various fees, project funds, increase or decrease of engineering quantities and liquidity, and shall not exceed the upper limit. Unauthorized expansion of construction scale and improvement of construction standards shall be handled in accordance with relevant state regulations.

Strict contract management. A project subject to tender must conclude a written contract in accordance with the tender documents and the bid documents of the winning bidder, and no other agreement that deviates from the substantive contents of the tender documents and the bid documents of the winning bidder shall be concluded separately. The contract shall be sent to the District Development and Reform Commission and the Bidding Office of the District Construction Bureau for the record. Need to sign other agreements, before signing, led by the project construction leading group, in conjunction with the district supervision, development and Reform Commission, bidding office, finance, auditing and other departments to discuss and agree to form a meeting minutes, as the basis for signing other agreements. Without the same decision of the above-mentioned units, and the adjusted unit price violates the bidding result, other agreements concluded are invalid.

Fourth, the project quality and safety management

The project quality is the key to the success or failure of the project construction, and the quality directly affects the application after the project is completed. The quality of engineering construction affects the reputation and benefits of construction and construction units. Controlling the quality of engineering construction is the focus of attention and the responsibility of all construction parties. As a construction unit, we should take quality control as the center, always take project quality as the focus of project construction management, consciously accept the supervision and inspection of quality supervision institutions, coordinate the relationship between design, supervision and construction units, and achieve the goal of controlling project quality through controlling all links such as project planning, design quality, bidding, examination and approval of major technical schemes, quality control in construction stage and information feedback. Supervise and manage the construction quality and safety of the construction unit in strict accordance with laws and regulations and relevant technical standards, design pieces and construction project contracts, and urge the construction unit to carry out the construction according to the drawings. The supervision unit should earnestly perform its duties and resolutely put an end to unsafe construction behaviors. Refuses to correct, be punished in accordance with the contract and the relevant provisions, and report to the relevant departments.

During the implementation of the project, the Education Bureau will send inspection teams to conduct inspections from time to time and report the inspection results.

In the following stages, the project construction leading group will participate in: foundation trench inspection, initial inspection and completion acceptance.

Verb (abbreviation of verb) engineering change management

The following provisions are made for the change procedures in the implementation process.

1. When the construction unit proposes a design change to the project, it shall propose a change plan together with the supervision engineer and submit it to the design unit for review; After examination and approval by the design unit, it must be approved by the competent education department, and the supervision engineer will issue a notice of change to the construction unit, which will organize the construction according to the changed drawings.

2. The design changes proposed by the construction unit shall be approved by the supervision engineer, reviewed by the design unit and approved by the construction unit before implementation. If the construction period is increased or decreased, both parties shall reach a written agreement in advance. However, due to the need to organize the construction, the construction unit will bear the increased costs.

3. During the construction, if the design drawings are wrong or the geological conditions change and need to be changed, the design unit will put forward a change plan. With the consent of the construction unit's visa, the construction unit will organize the construction according to the instructions of the supervision engineer after obtaining the revised drawings, and the increased expenses will be borne by the construction unit, and the delayed construction period will be postponed.

After the above procedures are perfected, all changes shall be approved by the project construction leading group and put on record.

Strengthen accountability. If there is fraud or irresponsible work in the engineering change and concealed engineering visa, which leads to the loss of engineering construction funds, the relevant personnel shall be investigated for responsibility. The information that should be preserved is not properly preserved or the supervision, design, intermediary institutions and other units resort to deceit, and shall be punished in accordance with the relevant provisions of the state.

Six, project settlement management

The total engineering quantity includes the following parts: ① Fixed part: all the contents of the bill of quantities in the tender; (2) Increase or decrease: it has changed according to the owner and design requirements, which has affected the increase or decrease of engineering quantity; (3) Subsidiary and supporting works. When both parties verify the engineering quantity, it must be signed by the construction, the construction and the owner and reported to the project construction leading group for signature, which can be used as the basis for calculating the project cost.

After all the quantities are determined, the settlement book of the construction project cost recognized by both parties shall be compiled, and all the relevant information of the project cost shall be sorted out. The school will submit the project construction leading group for audit, and the audit results will be submitted to the district audit bureau for audit. The final project payment is paid by the audited project cost, and the financial department executes it according to the audited total project cost.

Seven, engineering data management

Complete engineering technical archives and construction management data are important basis and information resources for engineering construction and management, and are also necessary conditions for the completion acceptance and smooth delivery of construction projects. See the file list of the District Construction Bureau for details of the project construction file filing.

Eight, engineering disciplines

Supervise and urge all units involved in the project construction to standardize the construction behavior, strengthen the integrity and self-discipline of employees, put an end to violations of discipline and law, make specific commitments to ensure the integrity and efficiency of the project construction, and widely accept the supervision of the masses and all parties. Strictly implement the bidding procedures, realize open, fair and just "sunshine operation" and put an end to unfair competition. Make it an economic project, a safety project, a practical project and a clean government project.

During the implementation of the project, it will be subject to special inspections by supervision, development and reform commission, finance, auditing, education and other departments. If violations of law and discipline are found, they will be dealt with in accordance with relevant regulations; If the circumstances are serious, it will be handed over to judicial organs for handling.

Nine, this opinion from the date of promulgation.

Attachment1:station data after the completion of the construction project of the quality and safety supervision station of the construction project in XX District (data prepared by the construction unit)

Attachment 2: Work Instruction for Construction Project Archives

Attachment 3: filing order of urban construction archives in XX District, XX City

Project implementation plan and implementation plan 2. Master plan:

1, planning scope and purpose:

This plan includes xx village and port area of xx village, with emphasis on planning the tourist area of xx village. The role of the economic demonstration industrial chain of two tourist spots, xx Village and xx Village, drives and guides the economic development of relevant counties and cities including the port area.

2. Planning principles:

According to the idea of building a new socialist countryside and developing rural economy put forward by the state, according to the principle of adapting measures to local conditions and sustainable development strategy, we should seize the favorable opportunity of the state's strong support for the construction of new countryside under the current market economy conditions in China, combine the construction of new countryside with the construction of tourist attractions, and realize a good cycle of promoting tourism development and tourism development to promote the construction of new countryside.

3. Overall conclusion of the plan:

Relying on the strong support of the state and the government, and with the help of the enthusiasm of the local people for construction, we will seize the opportunity, make overall plans, make rational layout, adjust measures to local conditions, and highlight characteristics, and strive to build the image of xx village as a new countryside and an international tourism region within 5- 10 years.

Second, the current situation analysis

1, tourism resources evaluation:

Xx Village is a seaside village in Guangpo Town, port area, located in the east of Guangpo Town, surrounded by the sea on three sides, with an area of 1. 4 square kilometers, 80 households with 387 people in the village. Xx village is a fishing village surrounded by the sea on three sides, with a village area of 1. 4 square kilometers, with 2000 acres of shallow beach. Tourism resources include banyan forest, sea water, islands, beaches, shrimp farms, ancient tile blue brick residential areas and so on. The following is the evaluation.

According to the evaluation, the region is rich in tourism resources, and the development of tourism has the dual advantages of resources and tourists. Generally speaking, the tourism development in this area belongs to the mode of high resource value, superior location conditions and good regional economic background, and tourism development has the dual advantages of resources and tourists.

2, tourism development environment evaluation (omitted):

(1), socio-economic environment

(2) Social environment

Third, the tourism market analysis and market development planning

1, tourist status:

The main tourists come from their neighboring villages and towns. There are also from Nanning, Liuzhou, Yulin and other places, but not many. Most tourists come by car to enjoy seafood products, and rarely stay overnight for the same day's round trip. As far as the current traffic situation is concerned, the primary tourism market includes surrounding villages and towns, the secondary tourism market includes surrounding counties and cities, and the tertiary tourism market includes neighboring provinces and surrounding areas such as Vietnam.

2. Market analysis and positioning:

As far as the whole port area is concerned, there are few tourist attractions, but there are no tourists with the theme of new rural construction, which has broad development prospects. For example: (Jia Sanniang Bend) In short, the market positioning should be based on the new look of rural new countryside, and the first-class market of xx village tourist area, which integrates sightseeing, vacation, leisure and entertainment, farmhouse music and other tourism modes, including the whole Guangpo town. The per capita income in this area is 4000 -5000 yuan/person, which has great potential, and the life characteristics of local people are ebb and flow. As far as the most marginal area of the primary market is concerned, the round trip can be realized within two hours. Therefore, the primary market should be the main target market in the primary development stage. With the existing influence of xx village and some publicity, the market target of the primary market should be completed in a short time. However, it should be noted that the primary target market includes villagers and neighboring towns, so it is not a "feature" for local characteristics, that is, it is familiar with local customs. Therefore, efforts should be made to develop products that attract such markets, such as beach volleyball, surfing and leisure boxes.

In short, the primary market is the main target market in the primary stage, and most of these tourists are day trips. The means to stimulate the primary market is to innovate tourism products in the form of prosperity, leisure and sightseeing.

The secondary market includes the whole Fangchenggang city. The primary stage of the secondary market will take a wait-and-see attitude, because it is far from the scenic spot and there are many destinations to choose from. Therefore, the means to seize this target market is characteristics and benefits. It is necessary to highlight the characteristics of coastal, border and coastal tourist areas, focus on the unique customs and cultural atmosphere of contemporary new countryside, make tourists feel interesting, meaningful and unforgettable, improve the rate of returning, expand the number of tourists in the secondary market and attract the number of tourists in the tertiary market through intangible publicity in the secondary market.

In short, the secondary market is the secondary market, and attracting one more customer means increasing income and expanding publicity.

The tertiary market includes Nanning, Liuzhou, Yulin and ASEAN countries such as Vietnam, Laos and Myanmar. The tertiary market should take international tourists, especially ASEAN tourists, as the main source market. Such tourists may be businessmen or group tourists. The means to attract this kind of tourists is probably similar to the secondary market, but it may be necessary to add a comfortable environment and luxurious equipment. Therefore, the positioning of the tertiary market should be business vacation.