The first station in the production of wire harnesses is the open wire process. The accuracy of the wire opening process is directly related to the entire production schedule, once the error is particularly short open wire size, will lead to all the workstation rework, time-consuming and laborious impact on production efficiency.
The second station after the open wire is the crimping process, according to the drawing requirements of the terminal type to determine the crimping parameters, the production of crimping instructions, for special requirements need to be specified in the process documentation and training of operators.