When the sewage in the middle pool reaches the starting height of the level controller, the sewage secondary pressurizing pump starts, injecting the sewage into the quartz sand filter and activated carbon filter in turn, and adjusting the flow rate by the flowmeter during the lifting process; the filtered sewage flows into the clean pool, and then overflows to be discharged.