Sanitation outsourcing contract model (general 5)
With the continuous improvement of laws and regulations, people pay more and more attention to the contract, at any time, anywhere, all kinds of scenes are likely to use the contract, it is also the realization of the professionalization of the cooperation of the bond. So what problems do we need to pay attention to when we draw up the contract? The following is my carefully organized health outsourcing contract model (general 5), I hope it can help you.
Hygiene outsourcing contract 1
Party A:
Party B:
Party B provides cleaning services for Party A's _______ project to open up the land, the negotiations are as follows:
I. Scope of services and construction price of the contract:
II. Construction period:
III. > Party A's responsibility:
1, according to the contract to pay Party B for services.
2, free of charge for Party B to provide cleaning services water, electricity.
3, the quality of Party B's services in a timely manner to monitor and inspect, such as the discovery of problems require Party B to rework in a timely manner until the quality standards.
4, the education of Party B personnel to comply with the project site system.
5, Party A should be three days in advance in writing or by phone to notify Party B into the construction
Fourth, Party B's responsibility:
1, Party B received written notice of Party A into the site or phone call, we must actively prepare for the site on time.
2, Party B in Party A to set up operations. The operation center is under the dual leadership of Party B and Party A. The operation personnel shall be professionally trained. Party B's operating personnel shall be professionally trained and specialized knowledge personnel.
3, Party B is responsible for providing a variety of machinery, equipment, tools, materials, chemicals and other cleaning needs. Seriously complete the operation projects and standards set by Party A, and ensure the construction quality tasks on time.
4, Party B construction personnel in the construction process to comply with Party A's internal rules and regulations.
5, Party B's employees in the work period occurred in the workplace accidents all the costs borne by Party B.
6, Party B in the construction should ensure that the quality of cleaning services to avoid rework.
7, Party B education staff to care for the site finished products and a variety of indoor facilities, do a good job of the protective measures, in the work caused by Party A facilities, materials and customer goods loss, Party B shall bear the corresponding compensation responsibility.
8, Party B's work should comply with the time requirements specified by Party A, if there is any change in the two sides to solve the problem.
9, Party B to ensure the quality of construction, according to different materials, the use of appropriate cleaning materials and operating methods. Party B construction is completed to Party A to provide "completion report", the quality of service by Party A through the Party in the "completion report" signed by the Party.
V. Payment
Both sides signed the contract came into effect, Party A notified Party B to enter the scene after the advance payment of 20% of the project. Party B construction is completed, acceptance passes, the unpaid amount of the project within a week to pay off.
Six, the contract changes and termination
1, the contract changes and early termination must be in writing.
2. The contract will be automatically terminated upon expiration of the period of performance specified in the contract.
3, in the process of contract fulfillment, in the event of irresistible factors, the two sides negotiated to solve the supplementary contract.
Party A (signature and seal)
Party B (signature and seal)
Date of signing the contract:
Sanitation Outsourcing Contract 2Article 1 The subject of the contract
Party A: _________
Party B: _________
strong> Article II Purpose and Principle of the Contract
This contract has been negotiated by both parties in a friendly manner and in the spirit of equality and mutual benefit and the principle of equal pay for equal value, with respect to the provision of daily cleaning services by Party B to Party A, the negotiations are as follows:
Article III Overview of the Project
_________.
Article 4 Term of Performance of the Contract
1. This contract shall commence on _________ from _________ to _________.
2. In case of force majeure which prevents the fulfillment of the contract within the stipulated period, the period can be shortened or extended accordingly after confirmation by both parties.
3. The first three months of the validity of this contract is the probationary period, during the probationary period, such as Party B's cleaning quality fails to meet Party A's standards, Party A has the right to unilaterally terminate this contract at any time.
Article V Responsibilities of the Contracting Parties
Party A's responsibilities:
1. Pay the cleaning service fee to Party B according to the contract.
2. Provide Party B with water and electricity for cleaning without compensation.
3. The quality of Party B's cleaning should be timely supervision and inspection, found that the quality of the problem in a timely manner require Party B to rework until it reaches the quality standard.
4. Educate the relevant personnel to comply with the _________ property cleaning system, *** with the maintenance of the _________ industry environment, caring for the park facilities.
5. Provide Party B with the necessary materials warehouse, office space and office telephone (Note: the monthly telephone bill paid by Party B).
6. Responsible for coordinating the relationship between Party B and the customers in the _________ property.
7. Responsible for Party B to deliver to the _________ property customers have cleaning requirements of paid special service information.
8. Actively adopt the rationalization of Party B's cleaning in the _________ property, and assist Party B in dealing with complaints.
9. Party A shall notify Party B in writing three days in advance to enter the site.
10. Party A has the responsibility to issue invoices and receipts on behalf of Party B to the customer for paid special services. (Note: invoices and receipts are provided by Party B).
11. Party A assigns a person weekly to Party B's weekly cleaning work acceptance. Acceptance criteria: the two sides recognized "clean area confirmation table" shall prevail, "clean area confirmation table" is not written in the part, to the Party's cleaning requirements shall prevail.
Party B's responsibility:
1. After Party B receives Party A's written notice to enter the site, it should actively prepare and enter the site on time. Provide copies of relevant insurance procedures documents, employee ID cards and operating certificates, and the required costs borne by Party B.
2. Party B set up an operation center in Party A. The operation center is subject to Party B and Party A in terms of business. The operation center is under the dual leadership of Party B and Party A.
3.
3. Seriously complete the "_________ Property Cleaning Standards and Regular Operation Guidelines" stipulated in the operation items and standards, to ensure the quality of health, to achieve customer satisfaction.
4. Party B in the _________ property services total staff of not less than _________ people, _________ property in the non-public **** area of the daily cleaning work (such as: paid special services) by Party B from the company headquarters to complete another personnel, and to ensure the quality of the work.
5. Party B personnel should be uniformly dressed, clean clothes and hats, wearing their company nameplate, access to the work site on the card issued by Party A, to comply with the internal rules and regulations of Party A, Party B shall not be in the service area of Party A without the consent of Party A to unauthorized contracting business.
6. Party B employees shall not leave their jobs at will during the work period, if the person in charge of Party B is not in charge of the work site, the temporary person in charge of Party B shall accept the supervision and guidance of the person in charge of Party A's cleaning, and check the standard of cleaning work according to Party A.
7.
7. Party B sends a person in charge of daily cleaning work quality inspection and cleaning work emergency handling, and monthly _________ before the month of cleaning work summary and cleaning work plan for the next month to report to Party A in writing.
8. Party B's employees in the work period in the event of industrial accidents all costs borne by Party B, Party B should sign a labor agreement, and for a variety of employment procedures, such as improper employment, causing losses to Party B by Party B.
9. Party B in the contracted cleaning work within the scope of Party A, such as cleaning work does not meet the quality standards of cleaning, by the relevant social functions (sanitation, urban management, etc.) penalties, the fine borne by Party B.
10. Party B fails to meet the quality standard of cleaning in the cleaning work (in fact, it can meet the quality standard of cleaning after rectification within a period of time), and after two verbal warnings and notices from Party A, it still fails to meet the standard, it will notify Party B in writing, and for each written notice, Party A will deduct _________%-95% of the cleaning service fee of Party B for that month. _________%.
11. Party B educates employees to take care of the buildings and indoor facilities in the _________ property, and pays attention to water and electricity saving.
12. Party B shall bear the responsibility of compensation for the damage caused to Party A's facilities, materials and Party A's customers' belongings due to Party B's inadvertence in the daily cleaning work.
13. Party B's operating personnel shall be professionally trained and specialized knowledge personnel.
14. Party B's work should comply with the time requirements set by Party A. If there is any change, the two sides will negotiate and solve the problem.
15. Party B in the operation should be strictly required to staff, do a good job of the protective measures, shall not be unauthorized misappropriation of Party A's goods. To strengthen management, safe production.
16. Party B to ensure the quality of construction, according to different materials, the use of appropriate cleaning materials and operating methods.
17. Party B is responsible for providing a variety of machinery, equipment, tools, materials, chemicals and supplies needed for cleaning. (Such as: large and small garbage bags, toilet paper, incense ball, brightener, cleaner, etc.).
Article 6 Total Contract Price
The total monthly amount of this contract is RMB _________, and the items listed in this fee are listed in the "_________ Property Cleaning Standards and Regular Operation Guidelines".
Article 7 Payment
After the contract comes into effect, if no cleaning quality problems are found, Party A shall pay Party B the full amount of the daily cleaning service fee of RMB _________ for that month by transferring the cheque on the _________ day of each month (if there is a rest day or holiday, the date of payment shall be postponed). If cleaning quality problems are found, Party A will deduct 10% of the monthly cleaning fee first, and then both parties will negotiate to solve the problem.
Article 8 Security Deposit
1. One month's cleaning contract fee of RMB _________ (¥ _________) delayed by Party A to Party B shall be taken as the security deposit and retained by Party A. The security deposit shall be paid to Party B in accordance with the terms of the contract.
2. Party B agrees that Party A has the right to use the deposit directly for one of the following cases:
(1) Due to the fault of Party B's staff, resulting in damage to Party A's doors, windows, glass, lamps and lanterns, air-conditioning, computers, vehicles, plumbing, electrical wiring, and other office facilities and machinery and equipment damage, loss and other losses;
(2) Due to Party B's staff's fault, resulting in damage to the vehicles of outsiders, goods, loss, leading to Party A to pay, compensation, compensation, and loss. (3) The medical expenses paid, compensated or advanced by Party A due to the work injury of Party B's staff, or Party B's staff's bodily injury to Party A's staff or outsiders, for which Party B is not responsible;
(4) Punished, prosecuted, or in legal dispute with third party due to the violation of laws, regulations and discipline of Party B or its staff. All expenses paid, compensated or advanced by Party A;
(5) All expenses incurred due to Party B's non-performance of the obligations under this contract, or performance of the obligations under this contract is not in accordance with the agreement, resulting in Party A commissioning a third party to perform the cleaning work.
3. If the deposit is insufficient for Party A to pay, compensate or advance the expenses for Party B, Party B shall pay, compensate or advance the insufficient part of the expenses by itself.
Article 9: Change and Termination of Contract
1. The change and early termination of the contract must be in writing.
2. The contract will be automatically terminated upon expiration of the period of performance specified in the contract.
3. In the process of contract fulfillment, in the event of irresistible factors, the two sides agreed to supplement the contract to solve the way.
4. The contract content changes, early termination must be one month in advance written notice to the other party, or 25% of the monthly service fee is liable for compensation.
Article 10: Termination of the contract
1. Party A does not pay the fees to Party B in accordance with the provisions of the contract, and Party B still does not pay the fees after reminding Party B, Party B can terminate the contract and demand compensation according to the liability for breach of contract.
2. Party B's serious negligence caused by Party A's property management of significant losses, Party A can terminate the contract, and demand compensation according to the liability for breach of contract.
3. After Party B's serious breach of contract, Party A may terminate the contract if Party B fails to take remedial measures and actions within one month after receiving Party A's written notice.
Article 11 Liability for breach of contract
1. If Party A does not pay Party B within the period specified in the contract, and Party B fails to pay after reminding Party B, Party A shall pay a late fee at the rate of 3‰ of the delivered amount for each day of overdue payment.
2. If Party B does not follow the contract requirements for quality cleaning services (according to the contract standard) to Party A caused by the bad impact and loss, Party A has the right to charge Party B the remaining contract amount of 3 ‰ liquidated damages. And require Party B to refund the service fee for the month.
Article 12 Declaration and Warranty
Party A:
1. Party A is a legally established and legally surviving enterprise, which has the right to sign and has the ability to fulfill this contract.
2. All formalities necessary for Party A to sign and fulfill this contract have been completed and are legally valid.
3. At the time of signing this Contract, no judgment, ruling, decision or specific administrative act has been made by any court, arbitration institution, administrative organ or regulatory body which is sufficient to materially and adversely affect the performance of this Contract by us.
4. The internal authorization procedures required by Party A for signing this contract have been completed, and the signatory of this contract is Party A's legal representative or authorized representative. This contract shall be legally binding on both parties after its entry into force.
Party B:
1. Party B is a legally established and legally surviving enterprise, which has the right to sign and has the ability to fulfill this contract.
2. All formalities necessary for Party B to sign and fulfill this contract have been completed and are legally valid.
3. At the time of signing this Contract, no judgment, ruling, decision or specific administrative act has been made by any court, arbitration body, administrative organ or regulatory body which is sufficient to materially and adversely affect the performance of this Contract by you.
4. The internal authorization procedures required by Party B for signing this Contract have been completed, and this Contract is signed by Party B's legal representative or authorized representative. This contract shall be legally binding on both parties to the contract upon its entry into force.
Article 13 Confidentiality
The two parties guarantee that the commercial secrets (technical information, business information and other commercial secrets) obtained from the other party and cannot be obtained through public channels will be kept confidential. Without the consent of the original provider of the trade secrets, a party shall not disclose all or part of the trade secrets to any third party. However, unless otherwise provided by laws and regulations or agreed by both parties. The confidentiality period is _________ years.
If a party violates the above confidentiality obligations, it shall bear the corresponding liability for breach of contract and compensate for the resulting losses.
Article 14 Force Majeure
Force Majeure as referred to in this contract refers to the unforeseen, insurmountable, unavoidable and objective events that have a significant impact on one of the parties, including but not limited to natural disasters such as floods, earthquakes, fires and storms, as well as social events such as wars, turmoils and governmental actions.
If the contract cannot be performed due to the occurrence of force majeure events, the party in case of force majeure shall immediately notify the other party in writing of the accident and shall, within _________ days, provide details of the accident and the written information that the contract cannot be performed or needs to be postponed, and the two parties shall agree to negotiate the termination of the contract or temporary delay in the performance of the contract.
Article 15 Notices
1. All notices required to be given under this contract, as well as document exchanges between the two parties and notices and requests related to this contract, etc., must be in writing and can be delivered by _________ (by letter, fax, telegram, face-to-face delivery, etc.). If the above ways can not be served, then only take the announcement of service.
2. The correspondence addresses of the parties are as follows: _________.
3. If a party changes its notice or mailing address, it shall notify the other party in writing within _________ days from the date of the change; otherwise, the non-notified party shall bear the corresponding responsibility arising therefrom.
Article 16 Dispute Settlement
1. This contract shall be governed by and interpreted in accordance with the laws of _________.
2. Disputes arising in the course of the fulfillment of this contract shall be resolved through consultation between the two parties, or mediation by the relevant departments; if the consultation or mediation fails, the disputes shall be resolved in the following _________ ways:
(1) Submission to arbitration by the Arbitration Commission of the State of _________;
(2) Prosecution to the People's Court in accordance with the law.
Article 17 Interpretation
The understanding and interpretation of this contract shall be based on the purpose of the contract and the original meaning of the text, and the title of this contract is only for the convenience of reading and shall not affect the interpretation of this contract.
Article 18 Supplements and Annexes
Matters not covered in this contract shall be carried out in accordance with the relevant laws and regulations, and where such laws and regulations are silent on the matter, A and B may enter into a written supplementary agreement. Annexes and supplementary agreements to this contract are an integral part of this contract, and this contract has the same legal effect.
Article 19 Effect of Contract
This contract shall take effect from the date when it is signed and sealed by both parties or their legal representatives or their authorized representatives. The validity period is _________ years, from _________ month _________ to _________ day _________ of _________.
The original of this contract in one _________ copy, each party to _________ have the same legal effect; copies of the contract _________ to _________ retain a copy.
Party A (seal): _________ Party B (seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ day _________ year ____ month ____ Day
Place of signing: _________ Place of signing: _________
Hygiene Outsourcing Contract 3Party A:
Party B:
Party B is a domestic service entity approved by the Labor Bureau of the City of ______. Now, upon Party A's application, Party B promises to provide cleaning services for Party A. In order to clarify the rights and obligations of both parties, the following contract is hereby entered into for both parties to **** with compliance.
I. Matters agreed by both parties:
1. Service items: _________________________________________________________________
2. Service location: __________________________________________________________________
3. Service time: from ___________ month ___________ of ___________ to ___________ Year ____________ month ___________ end.
4. Service fee: ___________ per square meter.
5. Payment method: Pay the remaining part of _____________________________________________ after the completion of the delivery.
Second, Party B should comply with matters
1. Party A believes that Party B sent the housekeeper is not applicable, and there are good reasons, Party B to give the replacement.
2. ____________________________________________ .
Third, Party A should comply with matters:
1. Party A must truthfully fill in the "_______ Domestic Customer Service Application Registration Form", and truthfully state the cleaning area and project.
2. Party A shall not arbitrarily increase the work beyond the contractual agreement. If you need to increase, you should get the consent of the person in charge of Party B's housekeeping staff and increase the remuneration appropriately.
Party A: Party B:
Representative: Representative:
____ Year ____ Month ____ Day
Sanitation Outsourcing Contract 4Party A:
Party B:
In order to improve the internal and external sanitation of the ________ International Shopping Center and to create a clean and beautiful environment, by the representatives of Party A and Party B **** the same study, Consultation, Party A agreed by Party B contracted the relevant cleaning work, the conclusion of this contract, the two sides to comply with the implementation.
First, the contracting method:
The use of labor, materials, equipment package.
Second, the scope of cleaning:
Yantai City, ________ International Shopping Center in the public **** area and the Party proposed a reasonable range.
Third, the contract price:
________ International Shopping Center is normally put into use, Party B puts cleaning staff ***, Party A pays Party B monthly cleaning service fee *** counted RMB ____ yuan / month (¥ ____ yuan / month). The cost of opening up: ______ (¥ ___ yuan / time)
Fourth, Party B promises:
Diligent and responsible cleaning services, to create a clean, beautiful, comfortable living environment; to maintain the good image of the management office of the ________ International Shopping Center.
V. Party A's responsibility:
1, Party A is responsible for Party B inspection and supervision, if Party B cleaning work does not meet the requirements of the contract, Party A has the right to impose penalties.
2, Party A is responsible for Party B free of charge to provide cleaning, water, electricity, and placing cleaning tools, supplies, a warehouse.
3, Party A and its employees should respect Party B staff and the fruits of their labor, shall not despise or ridicule the cleaning staff, and educate our employees to consciously maintain the cleanliness and hygiene of ________ International Shopping Center.
4. Party A shall set up appropriate amount of garbage cans in the public *** place of ________ International Shopping Center.
Six, Party B's responsibility:
1, Party B must ensure that the implementation of the contract is effective, to provide Party A with skilled cleaners, and comply with the rules and regulations of Party A, Party B's company, to maintain a good environment for Party A, caring for the Party's property, pay attention to words and deeds in order to maintain Party A's good image.
2, Party B stationed in Party A ________ International Shopping Center work of employees, including a supervisor, specific arrangements and comprehensive supervision of the daily cleaning of integrated services; inspections of the site cleanliness; instantly deal with Party A complaints, and do a good job with the person in charge of Party A contact work.
3, in a month if the owner complains more than two times (especially the quality of service) and Party B did not solve the problem, Party A has the right to issue a warning until the month in the cleaning service fee deducted 5% -10% of the cleaning service fee, if Party B contracted for the cleaning work is not up to the standard of Party A's requirements, and was the relevant departments If Party B's contracted cleaning work fails to meet the standards required by Party A, and is fined by the relevant departments, the fine is Party B's responsibility.
4, Party B will inform Party A of the regular cleaning operation plan, and often the implementation of the cleaning operation plan in writing.
5, Party B is responsible for the purchase of employee insurance and payment of wages, labor insurance benefits, housing and other entitlements, maintenance of all public **** facilities, damage to things at the price of compensation, and will not be allowed to have misappropriation or theft.
6, all the cleaning employees working in ________ International Shopping Center, Party B provides uniform uniform uniforms and wear Party B's corporate brand.
7, such as Party A requires Party B to remove and replace unsuitable cleaners, Party B accepts unconditionally.
8, according to the health inspection standards monthly inspection, did not reach 85 points deducted 5% of the month's cleaning service fee, due to the health impact of excellence, Party B according to the annual total cleaning service fee of 50% of the compensation to Party A (attached to the cleaning inspection points deduction standard).
VII, payment:
Party A must be in the monthly ____ before the form of a bank check transfer to pay off the Party B last month of the comprehensive cleaning service fee, Party B account bank and account number to the contract shall prevail (Note.). Party B account bank:, bank account number:. If there is any change, Party B shall notify Party A in writing 15 days in advance. If the account number and account bank provided by Party B is incorrect, resulting in service fees can not be accounted for, the responsibility is borne by Party B).
VIII, the duration of the contract and renewal:
1, the contract from ________ ____ ____ day effective until ________ ____ ____ day, the contract expires months before the two sides can be based on the actual situation of separate negotiations on the renewal or the signing of a new contract.
2. Party A shall notify Party B in writing at least one month prior to the expiration of the contract whether to continue the contract, and Party B shall notify Party A in writing at least two months prior to the expiration of the contract whether to continue the contract.
IX, signed
1, the contract by the two units of the official seal, the legal representative of the signature is valid.
2, the contract in duplicate, Party A, Party B, one each.
Party A:
Party B:
Date: ________ year ____ month ____ day
Sanitation Outsourcing Contract 5Party A (principal): _______________
Legal representative: ___________________
Party B ( Trustee): _______________
Legal representative: ___________________
Party A and Party B on _________ area daily cleaning matters, after friendly consultation, in the spirit of equality and mutual benefit, the principle of mutual voluntariness to sign this contract in order to *** with compliance.
Article I service items
Name: ______________________
Location: _____ ________________
Operating area: ______________________< /p>
Article 2 Service Period
Party B will carry out cleaning services for Party A's office area (or home) located in _________ city _________ from ____ month ____ of ______ to ____ day of ____ month ____ of ______.
The service period I*** is _________ days.
If the extension is caused by the overall project extension, cross construction and other irresistible reasons, the final date negotiated by Party A and Party B shall prevail.
Article 3 Cleaning Costs
1._______________, its cost is: _________ yuan;
2. ..._______________, whose cost is: _________ yuan;
The cost of this janitorial service*** is RMB: _________ yuan, (capitalized): ______________________.
Article 4 Payment Methods
1. After the contract comes into effect, if no cleaning quality problems are found, Party A shall pay Party B the full amount of the daily cleaning service fee of the current month by transferring the cheque by the day before _______ of each month (if there is a rest day or holiday, the date of payment will be postponed) RMB _________ in full. If cleaning quality problems are found, Party A will deduct 10% of the monthly cleaning fee first, and then both parties will negotiate.
2. Party A pays Party B _________% of the fees collected on behalf of Party B for the paid special services of customers on _________ every month (in case of rest days or holidays, the payment date will be postponed); the deducted _________% will be the management fee receivable by Party A.
3.
3. Upon completion of the contract, Party B has the right to be paid for the services within the agreed period of time. Party B is responsible for issuing invoices and receipts to Party A for the paid special services. (Note: invoices and receipts are provided by Party B).
Article 5 specific cleaning projects
1. Daily cleaning: office building section hygiene, building hygiene, upstairs and downstairs toilets, washbasin and the surrounding sewers, office building areas, doors and windows glass, _________ and so on.
2. Regular cleaning: toilets daily flushing, disinfection, deodorization, restrooms daily sweeping, wiping, disinfection, _______________.
Article 6 Party A's assistance
Party A has the obligation to facilitate Party B's services to ensure the smooth progress of Party B's work:
1. Party A assigns a special person to be responsible for the whole process of on-site supervision as far as possible, and tries to avoid cross-construction.
2. When Party B enters the site, Party A should assist Party B in checking the status of all the items in the project area, with special emphasis on the items without damage, and whether the valuables have been kept in good condition and other factors.
3. Party B into the field, Party A needs to provide water, safe electricity, lighting, to ensure normal construction; to provide Party B employees to change clothes, dining, equipment storage room; to provide the necessary materials warehouse, office space and office telephone a telephone bill to be paid by Party B.
4. Assist Party B to solve special problems encountered in the work site.
Article VII Summary and Plan
Party B sends a competent person in charge of the daily cleaning work quality inspection and cleaning work emergency handling, and monthly _________ before the month of cleaning work summary and cleaning work plan for the next month to report to Party A in writing.
Article 8 Quality Commitment
1. Party B guarantees to carefully complete the operation items and standards stipulated in the Cleaning Standards and Regular Operation Guidelines to ensure the quality of hygiene and achieve customer satisfaction.
2. Party B in the cleaning work does not meet the quality standards of cleaning (in fact, after a period of rectification can meet the quality standards of cleaning), by Party A two verbal warning notification, still do not meet the standards, will be notified in writing to Party B, each issued a written notice, Party A will be deducted from Party B cleaning service fee for the month of 0.5% -1%.
3. Party B in the contracted cleaning work within the scope of Party A, such as cleaning work does not meet the quality standards of cleaning, by the relevant social functions (sanitation, urban management, etc.) to be penalized, the fine borne by Party B.
Party A will notify Party B in writing that it will deduct 0.5%-1% of the monthly cleaning service fee.
Party A:
Party B:
Date: ________ year ____ month ____ day
;