Clean laboratory decoration design and installation site drawing lines → installation structure → installation of wall panels → installation of air conditioners → installation of sloped ceilings → installation of infill walls → installation of ceilings → installation of electrical control equipment → interior of GMP clean laboratory Decoration → Installation of automatic door ceiling air conditioning ducts, gas ducts, wire troughs, wire ducts and other GMP clean laboratory decoration concealed engineering installation → Ceiling installation → Wall decoration → Ground and floor material paving → Door and window installation → Equipment straps and sockets Installation of equipment or accessories → Cleaning → Various tests → Inspection by authoritative departments → Hand over the wall location and lay out → Installation and inspection of pipes in the wall → Wall construction → Install keels along the ground and along the top → Install vertical keels → Fix various openings and Door → Install wall panels → GMP clean laboratory decoration for plumbing, equipment, etc., reserve holes and pipelines and fill them with sound insulation materials (sound insulation, partition walls) → Accept each group of pipelines in the wall → Connect and fix electrical → Wall decoration → Installation Baseboards.
GMP clean laboratory construction procedures: Everything is constructed according to the GMP clean laboratory decoration design drawings to standardize and manage the construction quality. During the entire construction process, we not only adhere to advanced production technology, but also handle the technical requirements of every link, so that the overall construction is hierarchical. During the on-site construction, the first process of GMP clean laboratory decoration is used as the benchmark. The first process is responsible for the second process. Similarly, the second process also inspects and supervises the first process, so as to alternate construction.