Seven fire self-inspection reports

Zhangyi Fire Self-Inspection Report

My unit received a notice on July 8. On the morning of July 9, our project department held an emergency meeting to deploy fire safety self-inspection and self-correction. At work, the project manager, Manager Chen, presided over the meeting. Safety Director Yang Bin, relevant leaders of the project department, members of the safety department and the fire leadership group participated. When the manager arranged the fire safety self-inspection and self-correction work, he emphasized that fire safety hazards must be strictly investigated , established a long-term mechanism for fire safety and emergency response, and conducted a two-day fire safety self-examination and self-correction from July 9th to 10th based on the actual situation at the construction site. The self-inspection and self-correction situation is summarized as follows:

1. Conduct fire safety self-inspection and promptly rectify any problems found

Each subcontracting team quickly carried out fire safety self-inspection. The self-examination focuses on the electricity usage at construction sites, office spaces, staff canteens, dormitories, etc., the provision of fire extinguishers, material warehouses, and the use and storage of oxygen and acetylene. The storage conditions of flammable items and whether fire escapes are clear. Whether the fire-fighting facilities are intact and effective, whether the staff in key positions have received fire-fighting and safety training, and whether there are any fire hazards in the daily use of fire and electricity. The content of internal industry information mainly focuses on whether fire protection and safety systems and regulations are sound.

Self-examination and self-correction will begin on July 9th and end on July 10th. The following problems were discovered during the inspection: 1. The material list of the newly installed prefabricated houses in the second phase of the project was not reported. 2. Three of the five newly installed prefabricated houses in the second phase do not have fire extinguishers on site. 3. No fire prevention measures were taken near the second-stage employee boiler. 4. Some fire extinguishers in the prefabricated houses in the first-phase living area failed. 5. There are no fire extinguishers in the Phase II staff canteen. 6. Someone was found using hot water to boil water in the wooden house in the second phase living area. 7. The water and electricity team's oxygen and acetylene storage did not meet the requirements. There was no dedicated warehouse for separate storage and no fire-fighting equipment. 8. Mop the floor with cables on the east side of the Phase II office.

Rectification status: For the 8 problems discovered during the inspection, the project department has sent dedicated personnel to determine the measures and time to rectify them. After a review on the 14th, all rectifications have been completed and meet the requirements.

2. Attach great importance to ensure that safety hazards are eliminated before they occur

All departments and subcontracting teams of the project department attach great importance to the principle that "construction safety is more important than Mount Tai, people's lives and property Above all else" sense of responsibility, and pay close attention to the implementation of safety work. The project manager personally led the team to carry out inspections, effectively detailed safety responsibilities, decomposed responsibilities at every level, and clarified standards and specifications, so as to truly implement the supervision of fire safety responsibilities to every position, every work link, and every responsible person, and eliminate safety hazards. Solve and eliminate problems before they occur to ensure construction safety is foolproof.

3. Establish a supervision mechanism to implement safety

All departments and subcontracting teams of the project department have strengthened management and increased supervision. The Safety Department strictly implements the safety responsibility management system, determines the leaders, specific persons in charge, specialized work agencies and personnel for fire safety supervision, implements the fire safety supervision team, and implements the responsibilities and tasks of fire safety production supervision. A variety of methods will be used to conduct inspections and spot checks, and departments that have not implemented their work will be notified, and relevant responsible persons will be held accountable.

Part 2 Fire Self-Inspection Report

XXXXX Hospital conscientiously implements the spirit of the safety work meeting of the District Health Bureau, includes production safety and fire safety work on the agenda of daily work, and formulates and Various management systems and publicity and education systems have been implemented. Adhere to the principle of giving priority to prevention, combining prevention and treatment, assigning responsibilities to people and implementing them in place. The specific self-examination results are reported as follows:

1. Safety production responsibility

1. No major medical safety accidents occurred in 20xx.

2. Basically improve various medical management systems, strictly implement various operating procedures, and no medical errors or medical accidents have occurred; no occupational exposure incidents have occurred.

3. The focus of medical errors is prevention. A quality and safety control management committee has been established in the hospital, and a quality control team has been established in the department to identify the person primarily responsible for medical safety and form a "one post, two responsibilities" mechanism. Everyone signs Safety responsibility letter and regular medical quality and safety control meetings are held to ensure that medical errors and accidents do not occur.

4. Regularly carry out quality control self-examination work, and conduct rectifications of hidden dangers of medical accidents within a time limit; regularly conduct medical technical knowledge training to improve the professional capabilities of all medical staff and effectively prevent the occurrence of medical errors and accidents.

5. Strictly implement the medical personnel access system, and only those who have obtained the health technology qualification certificate can start working.

2. Fire safety responsibility work

1. Establish a sound organization and clarify work responsibilities

Fire safety is an important part of our hospital’s work and is related to employees The safety of patients’ lives and the safety of hospital property are top priorities. In response, in 20xx, our hospital established a fire safety working group with the executive dean as the team leader, the safety officer as the first person in charge, and the directors of each department as the direct responsible person, to be fully responsible for daily fire safety work.

2. Strengthen publicity and education and enhance fire safety awareness

Our hospital attaches great importance to fire safety work, continuously strengthens fire safety knowledge training for all employees, and communicates through centralized learning and decentralized learning. In a combined way, we actively learn fire safety related knowledge, effectively improve the fire safety awareness of all employees, establish the concept of "everyone is a firefighter, and everyone is responsible for fire protection", and ensure that every employee can use it skillfully. Fire-fighting equipment and common sense of first-time fire fighting and escape and self-rescue are required to effectively implement fire safety work into daily management.

3. Carry out fire safety self-examinations carefully to identify and eliminate fire hazards

The hospital system stipulates that the logistics department will inspect fire hydrants, fire extinguishers, and safety passage signs in the corridors of the entire hospital every week. A comprehensive self-inspection of electrical and gas facilities such as power lines, liquefied gas tanks, water dispensers, computers, printers, sockets and hubs was conducted. Over the past year, no signs of aging, exposure, burnt, flammable and explosive items, or consumption of power lines were found. Electrical equipment is overloaded.

In short, for hospitals, medical safety and fire safety are top priorities. We will implement the policy of "safety first, prevention first, comprehensive management", strengthen supervision and inspection and strengthen daily Management work, improve the safety responsibility awareness of all employees, effectively prevent problems before they occur, and create a safe and harmonious working and medical environment for hospital employees, children and parents.

Chapter 3 Fire Self-Inspection Report

According to the Heilongjiang Provincial Public Security Department, Heilongjiang Provincial Grain Bureau China Grain Reserves Management Corporation, and Heilongjiang Branch's announcement on the fire safety of grain storage places in the province In accordance with the notice of the special governance work plan, our company organized a comprehensive self-examination and now reports the self-examination as follows:

1. Establish a sound organization and clarify work responsibilities

In order to strengthen the company's fire protection For safety production work, a special emergency plan for fire accidents was formulated and a safety production work responsibility letter was signed with each employee. At the same time, a fire safety production work leading group was established:

Team leader: Xu Zhenzhong

Deputy team leader: Ding Chun Xu Chao

Fire safety officers: Zhang Guofeng, Wang Fengping

Team members: all company employees

2. Strengthen publicity and education, Enhance fire safety awareness

The company attaches great importance to organizing all employees to actively learn fire safety related knowledge, effectively improving the fire safety awareness of all employees, and establishing the "Everyone is a firefighter, and everyone is involved in firefighting work." "Responsible" concept, and always keep in mind the importance of fire safety work.

3. Carry out fire safety self-examination conscientiously to eliminate fire hazards

A comprehensive self-examination of power lines, computers, printers, sockets and hubs was conducted, and no aging of the power lines was found. , * exposure, burning, presence of flammable and explosive items, overload operation of power-consuming equipment, etc.

There are no open flames or combustibles around the warehouse. The drying tower and drying workshop have been fully inspected and are operating normally.

1. Fire-fighting equipment: fire-proof shovels, fire-proof axes, fire-proof hooks, fire-proof buckets and other fire-proof equipment are complete and in normal use.

2. There are 32 fire extinguishers, including 22 (8 kg) and 10 (4 kg). They are in normal use. The fire truck is functioning normally.

3. The appearance of the safe passage sign is intact and the instructions are correct.

4. The appearance of the fire emergency lighting is intact, the function is normal, and it can start automatically after a power failure.

5. Ensure that operators of special types of work are certified to work.

6. Hidden dangers

(1) When operators at various positions encounter emergencies and abnormal situations in production equipment, they do not have adequate handling skills and need to be strengthened in training.

(2) Some construction waste was not cleaned up in time during the construction of the warehouse.

7. Rectification of hidden dangers

Timely address the hidden dangers discovered during the inspection. Organize all employees to conduct on-the-job training and implement them according to operating procedures. Dispose of construction waste in a timely manner to keep the site clean and prevent hidden dangers.

IV. Construction of the fire brigade

The company has established a part-time fire brigade, captain: Zhang Guofeng, deputy captain: Ren Hongtao, team members: all employees, and are on duty 24 hours a day, inspecting and protecting regularly. Carry out fire-fighting business training and plan drills. Fire truck, complete equipment, complete and easy to use.

5. Strengthen safety inspections and eliminate potential safety hazards

The fire safety leading group conducts regular inspections to check for omissions and fill gaps, identify problems, and resolve them in a timely manner. Organize and carry out fire drills. While improving employees' fire awareness and mastering fire protection knowledge, they have effectively enhanced employees' fire awareness and self-prevention and self-rescue capabilities through fire emergency evacuation, self-rescue and escape drills. The company will continue to strengthen fire safety knowledge training for all employees to ensure that each employee can skillfully use fire protection equipment and have common sense about first-time fire fighting and escape and self-rescue, and effectively implement fire safety work into daily management.

In short, fire safety work is a long-term and important task, related to the life safety of our company and employees. Implement the policy of “prevention first, combining prevention and firefighting”, strengthen daily firefighting work management, improve firefighting awareness of all employees, and effectively prevent problems before they occur.

Part 4 Fire Self-Inspection Report

According to the spirit of "XX" of the XX Fire Department, strictly prevent the occurrence of various safety accidents, especially fires, and effectively protect the safety of people's lives and property, In order to create a safe and peaceful social environment for the "Two Sessions". Our unit has strengthened fire safety self-examination and now reports on the progress of the work as follows:

1. Leaders pay attention to and implement responsibilities.

In response to the requirements of Check work. At the same time, the recent XX fire situation was notified at the weekly meeting, and each XXX was required to learn lessons, draw inferences from one example, and be more vigilant to resolutely prevent similar incidents from happening.

2. Carefully conduct self-examination and eliminate hidden dangers.

Judging from the inspection results, the overall fire safety situation of our XXX is good, and all fire passages are smooth and without blockage. Various fire prevention signs and evacuation signs are obvious, fire-fighting equipment is fully equipped, and video surveillance equipment is running well.

3. Further increase publicity efforts and effectively improve the vigilance of all employees.

⑴ Comprehensively strengthen fire safety publicity work and improve the public security and fire safety awareness of all XXX employees. Through publicity activities in the form of posters, information electronic screens and other forms, fire safety knowledge will be made known to everyone, and a good atmosphere for the whole hospital to participate in fire protection work will be effectively created.

⑵ Increase the intensity of fire protection training to enable all XXX employees to master the fire notification process and the operation of fire extinguishing equipment.

First, they can put out initial fires, be able to promptly and accurately report the location, location and contact information of the fire, know how to use fire extinguishers, and know how to deal with initial fires; second, they can save themselves and escape, and can keep track of the evacuation routes and safe exits in their environment at any time. Understand the dangers of poor evacuation channels and safety exits, protect your own rights and interests in fire safety, and know how to save yourself and assist XXXXX in evacuation when a fire occurs.

⑶ Strengthen fire safety hazard rectification actions to ensure that the "one smooth" problem is effectively resolved. That is to ensure that fire safety evacuation passages and safety exits are clear, and that evacuation signs and emergency lighting fixtures are complete and effective.

Through publicity, training, and inspections, all employees have improved their fire safety awareness and improved their ability to deal with fires in the event of a fire, ensuring that nothing goes wrong during the "Two Sessions" and laying a solid foundation for fire protection.

Chapter 5 Fire Self-Inspection Report

According to the "Notice of XXXX Co., Ltd. on Strengthening Fire Safety Management at Construction Sites (Workshops, Bases) to Prevent Fire Accidents" (XXXX232) According to the requirements, our department formed a fire safety inspection team with the manager of the XX Project Management Department as the team leader, the deputy manager as the deputy team leader, and the heads of each department of the management department as team members, and inspected the four project departments under the Bridge Project Management Department. , the inspection status is now reported as follows:

1. Strictly implement the fire safety responsibility system and strictly prevent fire safety accidents

1. Each project department has established a fire safety responsibility system and clearly stated The first person responsible for fire safety shall form a fire safety leading group, establish a fire safety system at the construction site, and formulate corresponding management systems and operating procedures for the management of fire, electricity and flammable and explosive materials at the construction site. Each project department has A usage ledger and usage plan for production safety expenses were established as required, and no misappropriation of production safety expenses was found.

2. The office areas and living areas of each project department were inspected for potential safety hazards. Some project departments were insufficiently equipped with fire-fighting equipment, which have been rectified and reported to the project management department.

2. Strengthen the management of certificates for special operators

1. The certificates of special operators at the construction sites of each project department are in good condition. For workers with fire hazards such as electric welding and gas welding, A key inspection was conducted on the status of certificates, and no workers without certificates were found. The electrical equipment at the construction site was not repaired in a timely manner, and rectifications were ordered within a time limit.

2. The fire approval procedures at the construction site have been completed. The mixing station, beam making yard, oil depot, explosive depot, migrant workers’ dormitory, canteen, and on-site office at the construction site have been inspected. The mixing station has not been installed. Lightning protection facilities must be installed within a time limit, and fire-fighting equipment in oil depots and explosives depots must be replenished if they are insufficient.

3. During the inspection of the fire-fighting equipment in the migrant workers’ dormitories, it was found that some fire extinguishers had expired and had to be replaced within a time limit. In particular, a key inspection was conducted on the fire-fighting signs across highways and railways. During the inspection process, no fire extinguishers were found. Fire-fighting equipment that meets the requirements is not allowed to be used.

3. Strictly implement fire safety regulations and eliminate accident hazards in a timely manner

Each project department has formulated fire safety emergency rescue plans and emergency rescue teams and emergency rescue personnel in accordance with the requirements, and is equipped with Corresponding emergency rescue equipment, fire drills were organized, and fire safety knowledge publicity and training were carried out as required, especially to popularize fire prevention knowledge such as safe use of fire, electricity, gas, and oil as well as escape and self-rescue among migrant workers.

After inspection, the fire safety of each project department has no major accident hazards and is under control. However, our management department will increase supervision and inspection to ensure that no major safety accidents occur.

Chapter 6 Fire Self-Inspection Report

On the morning of April 16, our project department held an emergency meeting to deploy fire safety self-correction and self-inspection work. Project manager Guo Manhong presided over the meeting, which was attended by Chief Engineer Lin Fuchun, Deputy Manager Song Lijun, Director of Safety Department Liu Guiping, as well as leaders and key personnel of the Engineering Department, Quality Inspection Department, Materials and Machinery Department and other departments. When arranging fire safety self-correction and self-inspection work, Manager Guo emphasized the need to establish a long-term mechanism for fire safety and emergency response.

1. Pay high attention and eliminate safety hazards before they occur.

All departments and work areas must pay high attention and strengthen organizational leadership. We must adhere to the sense of responsibility that "construction safety is more important than Mount Tai, and people's lives and property are above all else" and pay close attention to the implementation of safety work. The project manager personally led the team to conduct inspections, effectively detailed safety responsibilities, decomposed responsibilities layer by layer, and clarified standards and specifications, so as to truly supervise the implementation of fire safety responsibilities to every position, every work link, and every responsible person, and eliminate safety hazards. Solve and eliminate problems before they occur to ensure construction safety is foolproof.

2. Supervision is in place and safety is implemented

All departments and work areas must strengthen management and increase supervision. The safety department must effectively strengthen safety supervision, strictly implement the safety responsibility management system, determine the leaders, specific persons in charge, specialized work agencies and personnel for fire safety supervision, implement the fire safety supervision team, and assign the responsibilities and tasks of fire safety production supervision to Reality. A variety of methods will be used to conduct inspections and spot checks. Departments that have not implemented their work must be notified, and relevant responsible persons shall be held accountable.

3. Safety inspection and on-the-spot rectification of problems found

Each work area quickly carried out fire safety self-inspection. The focus of the self-inspection is on the construction site, mixing stations, flammable and explosive items and equipment and facilities, oil depots and other key locations, as well as all office spaces, staff canteens and dormitories. Nip problems in the bud.

The content of self-examination and self-correction mainly focuses on whether the fire protection and safety systems and specifications are sound, whether safety management and inspection records are complete, whether fire passages are unobstructed, whether fire protection facilities are intact and effective, and whether daily fire and electricity are used properly. There are fire hazards. Whether staff in key positions have received fire protection and safety training, various safety weak links are found, and deficiencies are rectified from April 16 to April 18. Problems discovered during the inspection will be rectified immediately until they meet the requirements; if the problem cannot be solved in a short time, we will strictly monitor it; if there are major hidden dangers, we will stop immediately.

IV. Focus on investment and strengthen the allocation of dedicated personnel for supervision at major sites

Increase investment in safety prevention at construction sites in each work area and key fire-fighting locations such as oil depots and mixing stations, and strengthen rescue teams, Enhance emergency rescue equipment, specify designated personnel to take responsibility, and establish a long-term working mechanism for fire safety and emergency response.

V. Others

The construction section (K109 300~K118 000) undertaken by our project department does not involve tunnels and stone explosions, so it does not involve the safety self-correction of civil explosives. Check the situation.

Chapter 7 Fire Self-Inspection Report

On December 23, 20xx, after a large fire accident occurred in the *** District Logistics Park, the Management Committee attached great importance to it and immediately held a special meeting Study and deploy the fire safety work in the commercial functional area. At the same time, in accordance with the main instructions of Secretary Yue and the requirements of the District Safety Committee and District Fire Safety Committee, in order to prevent the occurrence of similar accidents in the park, ensure that during the "New Year's Day, Spring Festival" and "Two Sessions" and this winter tomorrow Spring safety and fire-fighting work are carried out steadily, the safety work of the park is further strengthened, and further inspections and targeted fire-fighting drills are organized. The relevant situation is reported as follows.

1. Formulate measures to prevent problems before they occur

(1) Strengthen organizational guarantees. The "Opinions on the Arrangement of Fire Protection Work in the Park in 20xx" was drafted and issued to further clarify the fire protection work tasks of each project and solidly implement the safety responsibility body system. It established a team headed by the Party Secretary and Executive Deputy Director, the person in charge of each project construction unit and the North Management Team. The winter firefighting leadership group composed of department members further clarified work responsibilities and strengthened the organizational guarantee for firefighting supervision.

(2) Refine the division of responsibilities. Several meetings were held to carefully arrange the implementation of fire safety and production safety work, further refine and clarify the division of responsibilities, implement the main leader's personal responsibility, the leader in charge of the responsibility, and the organizers to take the specific responsibility. It was determined that the deputy director Li Huachun would be responsible for this major inspection. Deputy Director Luo Yongjun is responsible for the inspection of municipal infrastructure during project construction and inspection of rivers and ditches.

(3) Strengthen work arrangements.

Immediately issue the "Notice on Strengthening Fire Management and Eliminating Hidden Hazards" and improve fire safety and production safety emergency measures, and formulate the "Notice on In-depth Carrying out the "100-Day Safety Production Activities to Effectively Do a Good Job in Safety Production This Winter and Next Spring", and "On "Notice on Strengthening Fire Fighting Work" requires each project to quickly conduct self-examination and self-correction on the actual situation of fire protection facilities and equipment, office areas, construction sites, power consumption in residential buildings of migrant workers, construction machinery and high-altitude operations, and requires that the Submit the situation to our committee in the form of pictures and texts

2. Clarify the key points and eliminate hidden dangers

(1) Clarify the scope of the inspection

First, the commercial market. Whether the fire-fighting facilities and equipment are in place as required, whether the electricity consumption meets the requirements, whether employees are aware of the fire-fighting equipment and whether they have established and improved fire-fighting mechanisms and personnel; secondly, whether the dormitories for migrant workers at the construction site are operating as required, and whether the mechanical and electrical operations are standardized. , Whether precautions for high-altitude operations are in place

(2) Extended inspection is in place

First, on-site inspection (including whether the fire protection design and fire acceptance report are in place, whether fire protection facilities and equipment are in place, etc.) ; The second is to review whether the agency system is in place (eight items are in place); the third is to randomly check whether the employees of the trading market can use the fire-fighting equipment correctly; the fourth is to check whether the fire-fighting equipment, especially the fire-fighting equipment, is properly maintained.

( 3) Solid inspection work

In accordance with the requirements and division of labor of the Administrative Committee’s meeting on the morning of the 24th, the inspection team carried out work separately on the afternoon of the 24th and the morning of the 25th. At the same time, they also actively invited the district fire brigade and the district safety supervision team. On January 9, the Party Secretary and Executive Deputy Director of the Management Committee also led the District Safety Supervision Bureau, District Fire Brigade, and other personnel to carry out on-site inspections. Firefighters from the Banzhuyuan Police Station and the District Industrial and Commercial Bureau conducted another fire inspection on the Haining Leather City, Shenrong Hongli Automobile Trade Zone, the main halls A, B, and C of the Internet Port that will be opened, and the Western Home Appliances Market. The overall situation of the project units in the park is good, especially Haining Leather City, which can provide fire protection acceptance certificates, establish special fire protection organizations, form fire assault teams, and formulate a relatively comprehensive agency work responsibility system. However, some projects have also been found. There are still deficiencies. For projects with hidden dangers, the management committee immediately issued a rectification notice, requiring them to make rectifications within a time limit.

(4) Organize drills and improve skills

In order to do a good job. For fire-fighting and self-rescue work in the park, the Management Committee organized fire-fighting drills for personnel from Haining Leather City and Shenrong Hongli Automobile Trade Zone on January 4 and 6 respectively to further improve the skills of the commandos and their ability to respond to fires.

In the near future, the management committee will continue to carry out fire hazard inspections and supervise each project unit, especially the inspection and inspection of small links (such as whether there is water in the pipe and whether the equipment can be used normally). , whether the personnel engaged in fire protection monitoring are organized and trained to work with certificates, and whether the maintenance of materials is carried out) to ensure the steady development of fire safety in functional areas.