Wastewater plant employee training summary essay
Since the X year X month to join the work to now has been almost a year. In this past year I am very grateful to the leadership and colleagues of my care and help, so that I quickly adapted to their jobs, completed from a student to a company employee transition process. In the work of conscientious, down-to-earth work, very good job duties within the provisions of the various work indicators. A year of learning, work, time is not too long, but I get is too much, a year my biggest feeling is to be a learning person.
When I first arrived at XXX, because the factory was in the preparatory stage, the conditions were extremely difficult. Factory leaders often talk to us and actively solve the difficulties of life for us. The old staff also actively and patiently pass, help, teach, their professional knowledge unreservedly imparted to us. Colleagues unity and love, help each other.
This good working atmosphere makes me gain a lot of knowledge. When I first came to work in Xianyang Road, I found that I knew too little. In order to adapt to the workplace as soon as possible, he or she worked hard to learn professional knowledge and actively involved in work practice. I read a lot of information, and under the guidance and help of my colleagues, I quickly grasped the process of sewage treatment and learned a lot of specialized vocabulary of sewage treatment. Because the plant was in the preparatory stage, the plant leader arranged for me to temporarily manage the information, responsible for the equipment random information signing, organizing, preserving and borrowing, etc., I soon figured out a set of management information method, and I was comfortable with the work. In addition, I also use my free time to read all the equipment random data, not only understand the working principle of the equipment, but also with the actual arrival of the equipment combined, at any time to find out what information is missing, and in a timely manner with the combination of electromechanical companies, to ensure that the installation of the work of the smooth progress.
As the project is getting closer to the end, our plant is also gradually transferred to the operation from the preparation, the work is also facing the transition, I was assigned to the central control room. The face of a new job, a new environment, I actively adjust their own mentality and working methods, in the team leader and colleagues under the careful guidance of the work rules and regulations of the post through the study of the work of the post to understand the scope of work and the post in the wastewater treatment plant and the relationship between the other posts. At the time of various equipment installation and commissioning period, many equipment manufacturers of technical personnel to the plant to debug, I seize this favorable opportunity to actively participate in the debugging work, listen to more, see more, remember more, more operation, and learned to summarize the experience. And can be strictly in accordance with the instrumentation maintenance system on a regular basis for all types of field instrumentation maintenance, maintenance and calibration, and adhere to the daily inspection of the instrumentation patrol. Through the debugging and maintenance of the instrument, I have a deeper understanding of the function of the instrument and parameter settings, laying a good foundation for future work. At the same time, I also participated in the entire plant automatic control system programming work, automatic control system for the sewage plant has a pivotal. In order to do a good job, we go to the scene every day to repeatedly look and debugging, in-depth and detailed study of the various process aspects of the automatic control of professional drawings and supporting the selection of samples, technical information, etc., access to self-control, instrumentation, professional and technical books, and will be combined with the site and the actual need to work to find the problem, to provide the manufacturer with the first-hand information, to ensure that the programming work of the The program will be smoothly carried out.
In the daily work of accumulating experience at the same time, I also actively participate in a variety of training to improve their own technical level. I have participated in the pre-employment training and new employee training organized by the company, and have a deep familiarity with the sewage treatment and the current situation of the company. By participating in the plant's safety education and training, so that I have increased safety knowledge, improve safety awareness, and be able to work in civilized production, safe operation, strict compliance with safety regulations and all relevant rules and regulations. Usually often participate in the training held by various equipment manufacturers, such as a variety of meters, fine grills, blowers, frequency cabinets and so on. In May this year, I participated in the electrician training held by the municipal party school. In addition, I am now participating in archive training and computer training, try to broaden their knowledge.
The most important thing in the process of adapting to the post is the support and help of the higher leadership and colleagues in my work. Through this nearly a year of work and their own continuous learning, and now they are engaged in the workplace has been adapted to, and to be able to do a good job of their posts work more confident, but also believe that they can do a good job. In the past year, I have made some small achievements in my work.
;