The term "construction engineering survey" as mentioned in these Regulations refers to the activities of identifying, analyzing and evaluating the geological and geographical environment characteristics and geotechnical engineering conditions of the construction site and compiling the construction engineering survey documents according to the needs of the construction project.
The term "construction project design" as mentioned in these Regulations refers to the activity of comprehensively analyzing and demonstrating the technical, economic, resource and environmental conditions required by the construction project and compiling the design documents of the construction project according to the requirements of the construction project.
The "construction drawing review" as mentioned in these Regulations refers to the activities of the construction drawing review institution in accordance with the relevant provisions of the state to review the contents of the construction project survey documents and construction drawing design documents involving public interests, public safety and mandatory standards for engineering construction. Article 4 The survey and design activities of construction projects shall follow the principles of fair competition, honesty and credibility. No region or department may block or monopolize the survey and design market.
The survey and design of construction projects shall adhere to the principles of energy saving, water saving, land saving and material saving, strictly implement the mandatory standards for construction projects, and meet the requirements of safety, practicality, environmental protection, economy and beauty.
Engaged in engineering construction activities, should first survey, design and construction. Fifth provincial housing and urban construction administrative departments responsible for the supervision and management of the province's construction engineering survey and design activities.
The administrative department of housing and urban and rural construction of the city and county (city) with districts shall be responsible for the supervision and management of the survey and design activities of construction projects within their respective administrative areas.
Transportation, water conservancy and other relevant departments shall, in accordance with the division of responsibilities, do a good job in the management of survey and design activities of related construction projects. Sixth to encourage the use of advanced technology, advanced technology, advanced equipment, new materials and modern management science in the survey and design activities of construction projects.
Construction engineering survey and design enterprises and personnel should create excellence and improve the level of survey and design.
Units and individuals that have made outstanding achievements in the survey and design activities of construction projects shall be selected and commended by the administrative department of housing and urban and rural construction in conjunction with relevant departments. Seventh construction engineering survey and design industry should establish and improve the self-discipline organization according to law, strengthen industry self-discipline, standardize industry behavior, safeguard the legitimate rights and interests of employees and promote the healthy development of the industry. Chapter II Qualification and Qualification Article 8 A qualification management system shall be implemented for units engaged in survey and design activities of construction projects.
Units engaged in the survey and design of construction projects shall go through the enterprise registration formalities according to law, and apply to the administrative department of housing and urban-rural construction for the qualification certificate of survey and design of construction projects. Article 9 An enterprise that has obtained the qualification certificate of construction engineering survey and design shall, in accordance with the provisions of the national qualification standard for construction engineering survey and design, engage in construction engineering survey and design activities within the scope permitted by its qualification grade.
An enterprise that has obtained the qualification certificate of architectural engineering design can undertake the general contracting of architectural engineering, project management and related technical, consulting and management services corresponding to its qualification grade. Tenth construction engineering survey and design qualification certificate is valid for five years. If it is necessary to extend the validity period of the qualification certificate, an application for extension shall be filed with the original issuing authority 60 days before the expiration of the validity period of the qualification certificate. Eleventh construction engineering survey and design enterprises to terminate, merge or split, it should be in accordance with the relevant provisions of the original issuing authority to cancel the qualification certificate or re apply for a qualification certificate. Article 12 Where the name, address, registered capital and legal representative of a construction engineering survey and design enterprise change, it shall go through the formalities for changing the qualification certificate at the original issuing authority within 30 days after the administrative department for industry and commerce goes through the formalities for changing. Thirteenth construction engineering survey and design enterprise qualification conditions change, the provincial administrative department of housing and urban construction shall, in accordance with the provisions of the authority to adjust its qualification grade or cancel its qualification certificate. Fourteenth construction engineering survey and design enterprises shall not have the following acts:
(1) Undertaking business beyond the scope permitted by the qualification grade;
(2) Forging, lending, transferring or selling qualification certificates or special seals for certificates;
(three) to undertake business in the name of other construction engineering survey and design enterprises;
(four) other acts prohibited by laws and regulations. Article 15 Institutions engaged in construction drawing review activities of housing construction and municipal infrastructure projects shall, in accordance with the provisions of the state, apply to the provincial administrative department of housing and urban and rural construction for approval, and only after obtaining the qualification for construction drawing review can they undertake the construction drawing review business within the approved business scope.