How to write the performance of supervision work?

Question 1: Please ask the experts for advice on how to write the annual evaluation of professional titles and how to write the summary of professional titles. It is a common concern and a very nerve-racking problem. In order to let everyone pass the professional and technical post evaluation smoothly, we invite a comrade who has been engaged in professional title reform for a long time to talk about this problem. The summary of professional and technical work should be a summary article, similar to the general summary article. However, it also has unique characteristics, which is an important content of professional title evaluation, an important basis for judges' self-evaluation, a display of their own level, ability and achievements, and an important summary of their experience since taking office. Whether the summary is well written will affect the experts' evaluation of you and whether you can pass it. Therefore, it is very important to write a professional technical summary. How to write? First, briefly introduce yourself, such as your current job title, working hours, graduation school, political outlook, and professional and technical work you are currently engaged in. Maintain these social status. The second is their own political thinking, work attitude and performance of their duties. The third is to describe in detail the professional and technical work I have been engaged in since I took office. It is who presided over the project, the progress of the project, what innovations and breakthroughs have been made, and what awards have been won through that kind of appraisal. Experts commented on this. The fourth is to publish those papers. The fifth is reward. Summary of professional and technical title evaluation (summary of job evaluation) _ Summary of professional and technical work of supervision engineer title evaluation Since she was named as an assistant engineer on June 5438+00 in XX, she has been actively demanding progress in her work and devoted herself to all her work, especially after five years of project practice, her professional level has been greatly improved. In the process of project supervision, I pay great attention to project quality management and actively participate in the safety management of the project and the collection and management of supervision data. I have improved my management level and technical level from different angles.

In the process of project supervision, I participated in the blue prints.the design of all projects, the construction organization design of the project and the audit of various safety schemes, collected and filed the project supervision data, and cooperated with the leaders to solve the technical problems in the project. Both theory and practice have greatly improved their professional level.

Through the practice of the above projects, I have a further understanding of the supervision and management of engineering construction. Here I talk about my personal work experience on the above projects.

A, from the beginning of the project, I'll be familiar with the construction drawings, and the construction unit, design unit, construction unit for the blue prints.the design, put forward the problems that need to be negotiated with the design in the construction, to lay the foundation for future construction supervision.

Intransitive verbs strengthen the management of engineering supervision materials, which is also very important to the quality of supervision. The collection and arrangement of supervision data should be timely, effective and traceable, and the data must be complete, arranged and stored in order to provide the necessary technical basis for the project quality.

Seven, strengthen contact with relevant units, improve their comprehensive quality. Because the work of project supervision involves the construction unit, construction unit, design unit, municipal quality supervision station, municipal safety supervision station and other units, in order to do a good job of supervision, we must deal with all aspects of the relationship. In contact with various units, I actively communicated with all parties with a modest and cautious attitude, won the support of all parties, and improved my personal handling ability.

In order to improve my professional level, in recent years, I have actively participated in various learning and training, such as supervision engineer training, chief supervision engineer training, witness sampling training and various trainings organized by the company at the end of the year, and passed the examination, laying a good foundation for future work.

Over the past few years, through the training of on-site construction supervision, I have been strict with myself from all aspects, learning with an open mind, working hard and studying business knowledge hard, which has improved my comprehensive quality and laid a good foundation for better work in the future.

Question 2: How to write the main performance of the supervisor in the * * project responsible for the work of * * professional supervisors * * *-* * *?

Question 3: How to write the summary report of supervision work? 20 16 personal work summary of on-site project supervision

The model essay is attached, please refer to it and hope to adopt it.

Question 4: How to write the summary report of supervision work? One,

Project overview

1, project background

2, the project construction process

Second,

Supervise contract performance

Entrusted by XXX, XXX company undertook the supervision project of XXX project, and supervised all the construction contents of XXX project in the whole process.

After the signing of the project supervision contract, our company immediately set up a supervision team to enter the user site, and under the unified organization and arrangement of the chief supervision engineer, we will carry out supervision work according to the supervision procedures. At all stages of project construction, according to the national policies, laws, regulations, standards and norms related to information system process supervision, national standards for information technology, project construction contracts and related materials signed by the construction unit and the contractor, and supervision contracts signed by the construction unit and the supervision unit, the quality, progress, investment and changes of the project are controlled, and the contracts and information documents of the project are managed. Hold regular supervision meetings to check the completion of all work and coordinate and solve existing problems; Submit the stage summary to users from time to time; Grasp the problems existing in the project in time and put forward supervision suggestions; Deal with the problems encountered in the implementation of the project in a fair and coordinated manner to ensure the quality and smooth progress of the project construction. The project supervision department fully fulfilled the obligations and responsibilities entrusted by the supervision entrustment contract, successfully completed the supervision task of this project, and the control objectives of supervision work reached the contract requirements.

Third,

Measures and effects of supervision work

1、

quality management

Engineering quality control is an important content of supervision work. We always urge the contractor to achieve the quality objectives agreed in the contract according to the construction and acceptance specifications, quality acceptance and evaluation standards.

In terms of hardware and system integration, coordinate all parties to discuss and formulate system integration scheme and system implementation scheme, and organize review until it is passed. In the process of project implementation, the construction specifications and technical objectives of each supplier are always checked on this basis. After the equipment installation and debugging of each supplier is completed, organize the preliminary acceptance, and organize the final acceptance after the system integration is implemented. The system integration is carried out in strict accordance with the implementation plan, which basically meets the requirements of the design plan. At present, the system runs stably.

In the aspect of software development, based on demand analysis report and system design report, we urge software developers to fully realize users' needs. Organize to review the phased results of the project, and enter the next stage only after passing the review. If not, notify the developer to carry out rectification until it is approved. After the completion of coding development, urge developers to conduct internal testing and submit test reports. After that, we also organized the end users to carry out the confirmation test, and asked the developers to modify and adjust the content and existing problems that did not meet the requirements and design. The integrated application software of labor and social security covers all relevant business contents and fully considers the business development direction. At present, the overall operation of the system is better.

Xx card system construction, audit whether the structural design of xx card conforms to xx. According to the expansion card structure, organize coordination meetings for many times to discuss the rationality of the card structure and the interface and technical realization of the application, and organize the joint debugging test of card management and application. Realize the compound and linkage payment of XX card and XX card; Realized ××. Realized the management of ××. At present, the one-card system runs well and the application of one-card system is good.

Strictly review the contractor's quality management system and subcontractor's qualification (such as fire control system), strictly review the contractor's construction organization design and put forward reasonable suggestions in the construction of computer room site. Strict inspection system shall be implemented for materials, equipment and accessories, and the construction unit shall be required to fill in the inspection form and submit it to the supervision department for review. Unqualified or unqualified products are definitely not allowed to be used. In the process of construction, we implement patrol inspection, on-site supervision, parallel inspection and other means. Every time a subdivisional work is completed, the construction unit is required to conduct self-inspection first, and the qualified self-inspection shall be reported to the supervision department for approval. After meeting the requirements, the next working procedure can be carried out. For concealed works, they must be inspected and accepted before they can be closed. After all kinds of effective measures and strict management, the construction of computer room website has passed a comprehensive review.

2, schedule control

Requirements from the beginning of the project to develop a "project master schedule"; At the beginning of each subdivisional work, the progress plan of subdivisional work shall be made; In the process of project construction, according to the different stages of the project, make a phased work plan for each subproject; When the subdivisional work is restricted and connected with each other, all parties shall be organized to jointly formulate a coordinated work plan. For each work plan, the supervisor will conduct a strict audit ... >>

Question 5: I am engaged in the supervision industry, how to write the main achievements of the intermediate title of construction engineering? Your question is not clear, and I don't know what you want to express. If it is purely from the performance point of view, what construction or supervision projects have been, how they were completed, how the construction unit evaluated them, and so on!

Question 6: How to write a summary of the supervision engineer's work for you? Please refer to! Interesting to join the "supervision house" group!

Lianhuachi East Road West Extension (Cuixi West Road ~ Cuiwei Road) New Telecommunication Pipeline Project

Summary of supervision work

I. Overview of the Project

According to the overall urban planning plan of Beijing, in order to alleviate the traffic tension in Fengtai District and Haidian District, the city * * * decided to build the road project of the west extension of Lianhuachi East Road (West Fourth Ring Road to Cuiwei Road), and combined with the needs of telecom development planning, new telecom pipelines were built on the north and south sides of the west extension of Lianhuachi East Road (Xicui Road to Cuiwei Road).

The new telecommunication pipeline of this project starts from Cuixi West Road (road number: K0+600) and ends at Cuiwei East Road (road number: K 1+850). Total length of telecommunication pipeline: 2.9 1922 trench km, equivalent to 1 10.0662 hole km, and 44 manholes of various types are added.

Beijing Xinshi Road and Bridge Construction Co., Ltd. and Beijing Xinchang Road and Bridge Construction Co., Ltd. are responsible for the construction of this project.

The commencement date of this project is April 3, 2002, and the completion date is 65438+February 7, 2004.

II. Organizations, supervisors and investment facilities

The chief supervision engineer is responsible for the supervision of this project.

Organization chart: (see attached table 1)

Third, the supervision department resource allocation

Prepare a list of instruments and equipment (see Table 2).

Fourth, the performance of the supervision contract

In strict accordance with the contents of the contract, the implementation is good.

Verb (abbreviation of verb) Overview of supervision work

(A) the basis of supervision work

1, Building Law of People's Republic of China (PRC);

2. Laws, regulations, policies and regulations of the state and Beijing Municipality on engineering construction and construction supervision;

3, the current engineering construction design, construction specifications and quality inspection evaluation standards;

4, the current building materials standards and engineering quota;

5. Design drawings and other relevant documents approved by the superior competent department;

6, the construction unit and the contractor signed a project contract according to law;

7. The supervision entrustment service agreement signed by the construction unit and the supervision unit according to law;

8. Construction organization design approved by the supervision engineer.

(2) Supervision of preparation before construction.

1, beijing expressway Supervision Co., Ltd. attaches great importance to this project, and first organizes.

A strong supervision team will supervise this project. According to the design drawings, the contract between the construction unit and the construction unit, the supervision contract signed between the construction unit and our unit, the Beijing municipal engineering construction supervision regulations and the relevant telecom construction acceptance specifications, the telecom supervision plan is compiled.

2, according to the supervision procedures and the relevant requirements of the construction unit, my unit organized the construction unit.

Learn the relevant inspection procedures in the supervision regulations and make supervision disclosure.

3, the qualification of the construction unit, the qualification of mount guard personnel and the qualification of subcontractors.

Carefully examine and approve one by one.

4. Carefully review the construction organization design and construction scheme of the construction unit, and carry out

Recognition.

5. Carefully check the construction survey and setting-out of each bid section to ensure the location and setting of the pipeline.

This plan is consistent with the drawing.

6. Before starting work, inspect the equipment, materials and preparations that come into play.

7. Before commencement, hold a meeting between the site representative of the construction unit and the project manager of the contractor.

The first site meeting attended by relevant functional personnel and all personnel of the supervision unit: announcing the division of labor among the project director, the director's representative and the supervision engineer; Announce the project manager and personnel of various institutions of the construction unit; The project manager reports the preparation work before construction; At the meeting, the representative of the director put forward several requirements on construction safety, construction quality, construction progress and project cost control, and issued the minutes of the meeting.

(3) Quality control of the project by the supervisor

According to the design drawings, construction acceptance specifications and engineering quality inspection and evaluation standards, the construction quality of the construction unit is controlled in an all-round and whole process.

1. Implement inspection system for materials and equipment on site. After the arrival of materials and equipment, check the material certificate and appearance certificate of materials, and send a supervision notice to the construction unit for the problematic materials and equipment that do not meet the design requirements, requiring the construction unit to replace them, thus ensuring the quality of materials and equipment.

2, supervision engineer insisted that the construction unit according to the supervision process for acceptance. Unqualified or unqualified processes shall not be signed and recognized, and the next process shall not be carried out.

3, in the process of the project, strengthen the inspection work, to criticize the construction unit management personnel is not in place, so as to urge the construction unit to strengthen its own management.

(4) Project schedule control

1, the supervisor carefully examines the construction progress plan of the construction unit, and makes an unreasonable progress plan.

Please ask the construction unit to modify ... >>

Question 7: How to write the supervision log? You can write what you did that day. How's it going? Are there any quality problems? How many people take part in the work. Which team did it? What's the problem? There are still some problems to pay attention to. There are also security issues that must be written. In the process of supervision. What did you do? It's kind of like writing a running account. Just a classification.

Question 8: supervisors' debriefing report and personal summary How to write a model essay on supervisors' debriefing report;

Dear company leaders and comrades,

With the passage of time, the Spring Festival of xx passed smoothly in an instant. Here, I would like to extend my greetings to you in your old age and wish you all success in your work, good health and happy family in the new year.

Please allow me to report my study and work in xx, and my work objectives in xx are as follows:

A, supervision of project progress:

1. This year, from 10 to September, our supervision team completed the supervision task in the construction stage of the reconstruction project of national highway river bridge, flood diversion bridge and west partial flood bridge in X state 3 10. September 1 undertook the supervision task of the reconstruction project of S249 Qijian Middle Bridge, and September 10 undertook the supervision task of the reconstruction project of G 104 Guo Zhongqiao, and supervision is under way in the construction stage.

2. From September 1 to February 1, S249 Seven Middle Bridges completed bored pile foundations 12, 4 caps, 66 prefabricated hollow slabs, 48m crash barriers on both sides, 564m2 concrete bridge deck pavement, half of bridge end transition slab, the right half of the bridge has been opened to traffic, and the left half of the old bridge has been demolished.

3.G 104GL bridge completed bored pile foundation from 1 October1February 65438+3 1 2, 6 upright posts, 4 pier caps, 76 prefabricated hollow slabs and 48 hollow slabs, and the engineering quantity is about.

Two. Supervision fee income: G3 10 reconstruction project of three dangerous bridges is 1.55% of the actual project cost according to the contract, namely 1022900 yuan (including 5% quality guarantee). The owner has paid 750,000 yuan in xx, 222,900 yuan in xx, and the remaining 50,000 yuan in two years. S249 The supervision fee for the renovation project of Qijian Bridge and G 104GL Bridge is 6.5438+0.4 million yuan as agreed in the contract, and 60,000 yuan has been paid according to the completed engineering quantity, leaving 80,000 yuan.

Third, the supervision organization and quality assurance system

According to the construction progress and the remaining engineering quantity, in order to reduce the supervision cost, make full use of human resources and rationally allocate, the company arranged five comrades of the design company to be transferred to other project supervision, and the remaining eight supervisors continued to complete the construction supervision task of the national highway 3 10 dangerous bridge reconstruction project.

10 was entrusted by the owner from September to June, and successively undertook the construction supervision tasks of the reconstruction project of Qijian Middle Bridge in Xinyi Section of S249 and Guolou Middle Bridge in G 104. Due to the long distance of the supervision project, the scattered construction operation surface, and the resignation of a special supervisor of our group, the technical strength of the construction unit is weak, and it is necessary to strengthen supervision at the request of the owner, so it is necessary to supplement professional supervision personnel. With the consent of the company, we hired three professional supervision engineers to enrich the supervision force.

Generally speaking, the organization is set up reasonably, with strong coordination, balanced levels, clear division of labor, and a combination of the old, the young and the middle. In the process of supervision service, they can perform their respective duties, give full play to their respective expertise, make full use of perfect facilities, and ensure the smooth progress of supervision work.

Four. Operation of quality management system

1, quality management measures

According to the requirements of the bidding documents and the supervision contract agreement, our supervision team has implemented various management systems of our company on the basis of implementing ISO900 1:2000 quality management standards, and combined with the characteristics of this project, formulated supervision implementation rules, overall quality excellence plan and supervision outline, and established quality management organization, engineering quality supervision work flow chart and supervision post responsibility system. In order to enhance the sense of responsibility of supervisors, make them carry out their duties, earnestly implement the 16-character policy of supervision work, establish quality awareness, create high-quality projects and ensure project quality, the following measures are mainly taken:

(1) Review the contractor's self-inspection system in the early stage of construction.

(2) Quality control in the construction stage

(3) three controls, two tubes and one coordination to do a good job of supervision.

(4) Do a good job in engineering quality evaluation.

2. The implementation of the company's documents and notification requirements

In all work, especially in supervision activities, my supervision team basically works hard according to the requirements of quality system documents, conscientiously implements quality system documents, and implements the company's quality policy and quality objectives. All employees can strictly fulfill the terms of the contract, provide high-quality and efficient services to customers, and at the same time implement various management systems of the company and departments, and recognize all kinds of documents and notification requirements issued by the company based on the quality policy of "strictness, honesty, fairness, legality, scientific standardization, high quality and efficiency, continuous improvement and pursuit of first-class" ... >>

Question 9: How to write the professional technical summary of the title of supervision technician? Mainly write down the work content, achievements and shortcomings, and finally put forward rationalization suggestions or new efforts. . . . . . Reprint: Summing up is to make a comprehensive and systematic general investigation, general evaluation, general analysis, general research, performance analysis, shortcomings analysis, experience summary and so on. Summary is a kind of applied writing, which is a rational thinking about the work that has been done. Summary and plan are complementary and should be based on the plan. Planning is always based on personal experience. The basic requirement of summary is 1. The summary must have an overview and a description of the situation, some simple and some detailed. This part mainly analyzes the subjective and objective conditions, favorable and unfavorable conditions, working environment and foundation. 2. Achievements and shortcomings. This is the center of summary. The purpose of summing up is to affirm the achievements and find out the shortcomings. What are the achievements, how big, how to use them and how to achieve them; How many shortcomings there are, what aspects they show, what nature they are, and how they come from, we must make it clear. 3. Lessons learned. Once you do something, there will always be experience and lessons. In order to facilitate the future work, it is necessary to analyze, study, summarize and concentrate the experience and lessons of the past work, and rise to the theoretical level to understand. Future plans. According to the tasks and requirements of future work, draw lessons from the previous period, clarify the direction of efforts, put forward improvement measures, and other matters needing attention. We must seek truth from facts, not exaggerate achievements, not narrow shortcomings, and not cheat. This is the basis of analysis and learning lessons. 2. Clear organization. The summary is written for people to see. If it is not clear, people will not understand it, and even if they do, they don't know why, so the purpose of summary will not be achieved. It should be appropriate and detailed. Materials are essential and phenomenal; There are important things and minor things, so keep the essence in writing. The problems in the summary should be divided into primary and secondary, detailed, detailed and abbreviated. The basic format of the summary is 1, heading 2, and the beginning of the text: overview and overall evaluation; Summarize the full text. Subject: analyze the shortcomings of achievements and sum up experiences and lessons. Conclusion: Analyze the problem and make clear the direction. 3. Signature and date of signature