Responsibilities of the Ministry of Security

Responsibilities of the Ministry of Security (7 general rules)

With the continuous progress of society, job responsibilities will be used in many places, so it is very important for enterprises to standardize employment and avoid risks. I believe many friends are very upset about formulating job responsibilities. The following is the job responsibilities (7 general rules) of the Ministry of Security that I have compiled for you, for reference only. Welcome to reading.

Responsibilities of the Security Department: 1 1. Publicize and implement the laws and regulations of national and local governments and administrative departments of enterprises on safety production and labor protection, assist the safety production department to do a good job in safety production, and adhere to the principle that production must obey safety when there is a contradiction between production and safety.

2. Assist the Safety Production Department to formulate the safety production management system, be responsible for reviewing the construction plan of the construction unit, and supervise and inspect the implementation.

3, according to the principle of "management of production must manage safety", responsible for the specific safety management work within the jurisdiction, supervise and inspect the implementation of safety technical measures of the construction unit, and ensure the technical quality.

4, regular safety inspection, found that there are serious accidents, should stop its operation, and immediately report to the safety production department.

5. Participate in the investigation and handling of work-related injuries and deaths, and put forward handling opinions for those responsible for the injuries and deaths.

6. Participate in the design, review and final acceptance of project safety facilities.

7, cooperate with * * * safety production department is responsible for organizing the project safety production competition, appraisal, rewards and punishments.

8. Participate in the calculation of safety review funds. 、

Responsibilities of the Ministry of Security 2 1. Participate in the design review of the project to make it meet the requirements of national security, fire control and labor hygiene, and make the labor protection facilities and environmental protection projects designed, constructed and put into operation simultaneously with the main project in accordance with relevant state regulations.

2, responsible for the formulation and review of new construction, renovation and expansion project construction safety measures. And handle the "three simultaneities" procedures with the higher authorities such as labor and fire protection.

3. Responsible for the contact and coordination between the project and the construction party and the handover after completion to prevent accidents.

4. When the project is accepted, all technical data such as product specifications, strength calculation, material test results and technical certificates of all newly installed equipment must be handed over to the competent department.

5. Be responsible for the safety education of outsourcing projects and foreign infrastructure teams. When signing a contract, safety measures should be written into the contract as an important content, and the implementation should be supervised and inspected. Accidents should be handled in strict accordance with the contract.

6. For gas construction that does not strictly abide by the national safety regulations, it has the right to order it to stop design, construction and supervision activities, and the project shall not enter the acceptance procedure.

7. Be responsible for safety and fire prevention during construction.

8. Responsible for dispatching construction teams to repair gas accidents.

Responsibilities of the Ministry of Security 3 I. Responsibilities of construction technicians

1, responsible for engineering construction technology, commanding, guiding and organizing team production, rationally using labor force, and completing various production tasks as planned.

2, responsible for contacting the survey group, to help pay-off. Organize the blue prints.the design, participate in the preparation of construction organization design, organize positioning and setting out according to the drawings, and measure the elevation.

3, make preparations before construction in advance, eliminate obstacles in production operations, and create construction conditions for the team in advance.

4, master the material quality mixture ratio, construction operation method, to the team for technical disclosure and on-site command operation, responsible for the quality of this project.

5. Carry out the construction organization design and quality and safety measures, complete various saving indicators, and participate in the preparation and implementation of monthly and ten-day construction progress plans.

6, according to the drawing budget and analysis, for the builder and materials to provide the basis of labor materials in each process.

7, the construction site erection of shelves and mechanical and electrical installation equipment for acceptance, qualified rear can use. At the same time, we should pay attention to the management of "three guarantees" (safety helmet, safety belt and safety net) and "four exits" (stairs, elevator exits, reserved holes and access openings).

8. Participate in the quality evaluation of sub-projects organized by the general manager of the project, and take part in concealed works and military pre-inspection. Organize workers to construct according to the drawings.

9, cooperate to do a good job of raw material test, test unqualified are not allowed to be used, raw materials come into play.

We need to do a comprehensive examination.

10, responsible for the material test before construction, formulate the mixture ratio in time, and carry out the construction according to the regulations.

standard

Make acceptance criteria and test blocks, send them for inspection in time, and retrieve the report for filing.

1 1. Complete other technical tasks assigned by the project manager and the company.

Second, the construction administrator job responsibilities

1. Work under the direct leadership of the project manager, organize the production management of project construction, and ensure the progress, quality and safety of the project.

2, participate in the preparation of the blue prints.the design and project schedule, responsible for the preparation of construction organization design scheme and construction safety, quality, technical scheme, preparation of individual project schedule and manpower, material resources and machinery, appliances, equipment plan.

3. Assist technicians to pay special attention to the technical work of engineering construction, ensure that the construction work is organized according to drawings, standards and processes, and avoid rework; Do a good job in mixing ratio and ration, and put an end to material waste.

4, assist the project manager to prepare the civilized construction site implementation plan, according to the project construction site reasonable planning layout, arrangement, implementation and creation of civilized construction site.

5. Prepare the general project schedule and monthly schedule and the monthly schedule of each construction team. Assist the project manager to organize construction and production. Specifically including:

(1) During the construction, be diligent in leg, eye and mouth, follow the shift, conduct on-site inspection and guidance, popularize new technology and advanced experience, and improve production efficiency;

(2) In the process of construction, it is necessary to make clear the material supply and civilized construction to ensure the rational use and saving of labor and materials;

(3) Pay special attention to the management and use of mechanical equipment and equipment, and fill in relevant construction records.

6. Do a good job in the cost accounting of sub-item general contracting (by single item and sub-item) in time, and inform the management personnel of the contracting department of the accounting results in time, so as to improve the construction plan and scheme in time and strive for higher benefits.

7. Issue the construction task book and material quota requisition list to each team, and urge the construction materials and equipment to enter the site on time and be in a qualified state to ensure the smooth progress of the project.

8, to participate in the project completion center, responsible for the project intact protection; Organize the acceptance of concealed works and participate in the quality evaluation of divisional works.

Third, the surveyor's job responsibilities, the surveyor's job responsibilities

1. Implement the national measurement standards and regulations and the measurement management system and measures formulated by the company;

2. Be responsible for the use, storage, maintenance and inspection management of measuring instruments such as inspection, measurement, test and experimental equipment required on site to ensure that the measuring instruments required on the construction site are in a qualified state;

3. Be responsible for accounting and recording of measuring instruments, make relevant work records as required, and report to relevant departments in time;

4. Complete other tasks assigned by department leaders;

5. Understand the design intent before measurement, and learn and check the drawings; Understand the construction deployment, and make the survey and setting-out plan.

6, in conjunction with the construction unit of red line pile survey control points on-the-spot calibration.

8. Regularly check and calibrate measuring instruments to ensure their accuracy and normal use.

9. Cooperate closely with the design and construction, make full preparations in advance, and formulate a feasible survey and setting-out scheme synchronized with the construction.

10. Do a good job of setting-out and inspection at all stages and main parts of the whole construction process, strengthen the audit of measuring and setting-out scheme and the guidance and inspection of measuring and setting-out work to avoid rework.

1 1. Line inspection should start with the review of survey and setting-out plan, and put forward preventive requirements for survey and setting-out work before construction in each major stage, so as to truly nip in the bud.

12, responsible for elevation measurement and positioning, vertical observation and settlement observation, and record the observation results (data and curves and charts).

13, responsible for timely sorting out and improving the measurement data such as baseline review and measurement records.

Four, the operator responsibility

1, in strict accordance with the relevant national engineering test standards and regulations, do a good job of sample storage, maintenance and recording;

2, seriously implement the witness sampling and inspection system, responsible for the representativeness and authenticity of the specimen;

3. The unqualified items in the test shall be reported to the competent leader in time to prevent the unqualified products from being transferred to the next working procedure;

4. Record the original test records, fill in the test report accurately and be responsible for the authenticity of the test data;

5, responsible for the implementation of laboratory outdoor testing and testing;

6, responsible for sampling (samples) commissioned by the laboratory inspection, fill in the entrusted inspection list;

7. Responsible for the sampling inspection and transportation of raw materials, concrete and mortar on the construction site, and undertake the on-site test of the project;

8. Assist relevant personnel in product inspection and test status identification;

9. Supervise and inspect the quality of raw materials, concrete and mortar used at the site, and submit the unqualified raw materials, concrete and mortar to the material purchasing department in time for processing.

Five, safety personnel responsibilities

1. Be responsible for the safety management of the project department under the leadership of the project manager.

2. Assist the project manager to establish and improve the safety production management system of the project department, and formulate and improve various safety systems.

3. Be responsible for preparing the occupational health and safety objectives and management plans of the project department and organizing their implementation.

4. Be responsible for organizing the personnel of the project department to study and implement relevant laws and regulations, the company's current document 1, the "30-block system" of safety production, the management standards of the construction site and other relevant construction safety management measures and regulations.

5. Be responsible for checking the temporary electricity consumption on the construction site, the management of construction machinery use, the certificates of special operators, the key points and protection of existing line construction, the implementation of seasonal construction scheme, on-site fire control management, warnings, tips, prohibition instructions and signs in pits, wells, ditches, various holes, inflammable and explosive dangerous places, transformers, entrances and exits, feeding ports and other parts of the construction site.

6. Responsible for the safety technical measures compiled in the construction organization design for key inspection.

7. Responsible for the daily safety inspection of safety education before shift, and fill in the records as required. Responsible for filling out all safety reports.

8. Be responsible for the safety education, supervision and inspection of subcontractors and related parties.

9. When an accident occurs, implement the corresponding emergency preparedness and response plan, immediately organize rescue and implement the reporting system, protect the site, and participate in the accident investigation as required.

10. Complete other tasks assigned by the leaders.

Six, engineering quality engineer responsibility

1. According to the design documents, construction scheme, construction specifications, operating procedures and engineering quality acceptance standards of the supervised project, prepare the quality supervision plan of the supervised project, and implement supervision and management according to the quality supervision plan;

2. Go deep into the construction site, supervise the foundation, main structure and key working procedures, and supervise and test raw materials, components and equipment according to regulations;

3. Implement the whole process quality supervision and management of the supervised project, investigate and deal with major project quality problems in time according to the regulations, and report to the superior;

4, responsible for the process inspection plan, regular engineering quality inspection and analysis, put forward improvement measures, supervise the rectification and correction; Participate in the investigation and handling of engineering quality accidents and submit accident investigation reports in time;

5. Supervise the organizational form and acceptance procedures of the construction unit's project completion acceptance, and whether the relevant information provided in the acceptance process and the quality evaluation documents formed conform to the relevant regulations, whether there are serious defects in the entity quality, and whether the project quality inspection and evaluation meet the standards;

6. Be responsible for the concealment and preview of the project, the audit of the quality evaluation of partial projects and the collection of data to ensure the completeness and accuracy of the data; Compile the quality supervision report of the supervised project;

7. Fill in the supervision manual and work record manual carefully, and submit the work summary on time;

8. Complete other quality and safety work assigned by the leaders.

The responsibility of the security department. The manager of engineering department is the person in charge of fire safety in this department. Under the leadership of the person in charge of fire safety and the hotel manager, carry out fire safety management and master the fire safety situation of the department.

Two, the fire control work and the management activities of the department as a whole, the implementation of the annual fire control work plan.

Third, organize employees to carry out education and training on fire control knowledge and skills.

Four, regularly organize the implementation of the department's fire facilities, fire equipment and fire safety signs maintenance, to ensure that they are in good condition, to ensure smooth evacuation routes.

Five, regularly organize the department's fire inspection and hidden dangers rectification work.

Six, the development of safe electricity management system, equipment and facilities fire safety regulations and safe operation procedures.

Seven, organize the department staff to maintain the hotel fire equipment, to ensure the normal operation.

Eight, regularly report the fire safety situation to the hotel fire safety responsible person and manager, and timely report the major issues related to fire safety.

Responsibilities of the Security Department: 5 1, responsible for on-site management and maintenance support of project facilities and equipment, strong and weak electricity, water supply and drainage, elevators, HVAC systems;

2, responsible for the annual facilities and equipment maintenance plan;

3. Participate in quality inspection and supervision four times a year to ensure the integrity rate of project engineering facilities and equipment;

4. Be responsible for the guidance, establishment and update of equipment ledger, inspection and professional filing of relevant materials;

5. Responsible for the contract review, acceptance evaluation and assessment of the outsourcing unit to ensure that the contract requirements are met;

6. Participate in internal or external information communication, coordination, feedback and resolution;

Responsibilities of the Ministry of Security 6 1. Responsible for organizing and managing the whole process of internal engineering of the store;

2. According to the development needs of the company, constantly improve the corresponding standards and processes;

3. Regularly check the implementation of the project schedule, analyze the reasons and evaluate the impact of the plan that has not been completed on time, formulate corrective measures and supervise the implementation;

4. Ensure that the newly opened store can complete all renovation work as scheduled, and ensure that the store can open on time;

5. Investigate and evaluate the engineering technical conditions to ensure the normal decoration of the store;

6. Review the construction drawings, guide and supervise the progress, quality, cost, safety and civilized construction management in the construction process, and master the progress of various projects;

7. Responsible for the audit of project funds, and put forward reasonable suggestions for cost control to superior leaders;

8. Properly handle emergencies at the construction site;

9. Organize the formulation of pre-settlement procedures and standards for decoration projects, and timely adjust the project unit price according to market conditions;

10. Establish and improve contractor files, record basic information, qualifications and comprehensive performance, and continuously accumulate resources for the company's development;

1 1. Complete other tasks assigned by superior leaders with good quality and quantity.

Responsibilities of the Ministry of Security 7 1. According to the project management objectives and plans, be fully responsible for the daily management of the project engineering maintenance team, ensure the normal operation of all kinds of facilities and equipment, and lead the engineering maintenance team to provide quality maintenance services for the owners;

2. Organize the project quality acceptance of the newly-received property, and carry out the maintenance, operation and management of residential decoration and facilities and equipment;

3. Be responsible for the daily training and business guidance of the project maintenance team, formulate weekly, monthly and annual work plans, reasonably arrange the daily work of maintenance personnel, and supervise, guide and assess their work;

4. Manage the water, electricity and gas consumption in the community, and make statistics, analysis and audit;

5. Arrange maintenance personnel to handle the owner's application for repair in time, and check and track the daily maintenance completion;

6. Supervise and inspect the implementation of project facilities and equipment, large and medium-sized repair projects and renovation projects;

7. Cooperate and coordinate the inspection of special equipment and facilities in the community by relevant departments.

;