Materials to be submitted for technical transformation projects.
I. Approved projects
1. Documents forwarded by the Municipal Economic and Information Commission (1 copy);
2. Project application report [1 copy, refer to the Notice of the National Development and Reform Commission on Printing and Distributing the General Text of Project Application Report (No.[2007] 1 169)];
3 list of domestic equipment and imported equipment used in technological transformation projects (6 copies each); 4. Original reply of the environmental impact assessment document issued by the competent department of environmental protection (1 copy);
5. For mine construction, production and storage of dangerous goods, major hazard sources, ferrous and nonferrous metal smelting, key industries and other key regulatory technological transformation projects stipulated by the state, the original safety review reply issued by the safety production supervision and management department shall be provided (1 copy);
6. For new site selection, the original project planning site selection opinion issued by the administrative department of urban and rural planning (1 copy);
7. For the newly requisitioned land, the pre-examination opinion of the original project land issued by the administrative department of land and resources (1 copy); 8. Other documents required by relevant laws and regulations (1 copy).
Second, the filing project
1. Record Form of Technological Transformation Project of Enterprises in Shandong Province (6 copies); 2 list of domestic equipment and imported equipment used in technical transformation projects (6 copies each); 3. For mine construction, production and storage of dangerous goods, major hazard sources, ferrous and nonferrous metal smelting, key industries and other key regulatory technological transformation projects stipulated by the state, the original safety review reply issued by the safety production supervision and management department shall be provided (1 copy);
4. Other documents required by relevant laws and regulations (1 copy).
Three. Confirmation of tax exemption above designated size 1. Documents forwarded by the Municipal Economic and Information Commission (2 copies);
2. Project application report [2 copies, refer to the Notice of the National Development and Reform Commission on Printing and Distributing the General Text of Project Application Report (Development and Reform Investment [2007] 1 169)];
3 original project approval or filing documents (2 sets); 4 list of imported equipment and technology (5 copies);
5. List of imported equipment proposed in the project application report (2 copies, stamped with the official seal of the legal entity);
6. List of imported equipment and comparison table of duty-free equipment proposed in the project application report (2 copies);
7 copies of the business license of the project unit (2 copies, stamped with the official seal of the legal entity); 8. A copy of the entrusted bidding contract and a copy of the bid-winning notice of the equipment to be tendered according to regulations (2 sets each, stamped with the official seal of the legal entity);
9. Other documents required by relevant laws and regulations (1 copy).
IV. The following tax exemption confirmation items 1. Application form for tax exemption (2 copies);
2 original project approval or filing documents (2 sets); 3 list of imported equipment and technology (4 copies);
4 copies of the business license of the project unit (2 copies, stamped with the official seal of the legal entity); 5. A copy of the entrusted bidding contract and a copy of the bid-winning notice of the equipment to be tendered according to regulations (2 sets each, stamped with the official seal of the legal entity);
6. Other documents required by relevant laws and regulations.
Verb (short for verb) changes the item.
1. Report of the enterprise applying for project change (2 copies); 2 documents forwarded by the Municipal Economic and Information Commission (2 copies);
3. Original and photocopy of the project approval, filing or tax exemption confirmation document (1 set);
4. Other relevant explanatory materials (1 copy).
name="2 " >
The second part: the filing process of enterprise technological transformation investment projects.
Filing process of enterprise technological transformation investment projects.
First of all, solemnly declare
1, register first. Log in to the Guangdong Provincial Information System for the Filing of Enterprise Technological Transformation Investment Projects (website: http://61.19.76/jgb/), click "Enterprise Registration" in the user login interface, fill in the registration information carefully according to the prompts, and fax the enterprise business license to 2283/kloc-
There are two points to note when filling in the registration information:
1. When filling in "Local Competent Unit", you need to click "+"before "Foshan Economic and Information Bureau" in the drop-down menu, and then click "Shunde Economic Promotion Bureau".
Second, the legal person code should fill in the organization code of the enterprise, which is also the account number of the enterprise login.
2. After passing the examination and approval, log in to "Guangdong Province Enterprise Technological Transformation Investment Project Filing Information System" (website: http://61.144.19.76/jgb/), log in with the account and password provided at the time of registration, fill in the filing information after entering the system, upload the attachment, and select after completion.
Pay attention to the following points when filling in the filing information:
1. When filling in "Production capacity of main products before transformation (product name, annual production capacity, actual annual output and market share)", the current main products of the enterprise should be filled in, and the specific contents should be filled in according to the tips in brackets.
Second, when filling in the "main contents of the project (main equipment technology and production plan after transformation)", we should first describe the investment situation of the project, including which equipment was purchased and which links were transformed. Then describe the quantitative objectives after the completion of the project, such as the expansion of production capacity to * * units and the improvement of qualified rate to * *. Different projects will have different goals, and should be filled in according to the actual situation.
Second, the uploaded bidding information should be clearly described in comparison with the "Implementation in Guangdong Province"
Measures ",whether the project belongs to the scope of compulsory bidding, if not, it should be clearly pointed out that it does not belong to the scope of compulsory bidding, if it belongs to the scope of compulsory bidding, it should explain the contents and methods of bidding.
Third, in the uploaded energy-saving materials, the annual comprehensive energy consumption of production and operation after the completion of the project should be clearly stated and converted into standard coal.
3. After the enterprise submits the filing information, it can log in to the "Guangdong Province Enterprise Technological Transformation Investment Project Filing Information System" (website: http://61.144.19.76/jgb/) to inquire about the approval of the filing project (if the enterprise chooses SMS service when registering, it will receive SMS reminder).
Second, get the registration certificate
When the identity is issued, the enterprise will export the printed filing application form together with a copy of the business license (in duplicate, marked with the words "provided by the unit, consistent with the original" and stamped with the official seal) to the District Economic and Technological Bureau to obtain the filing certificate (Industrial Development Department of the Economic and Technological Bureau, the fifth floor of Shunde District Government Building).
Three. Change and cancellation
1. Once the filing certificate is issued, it will not be changed in principle. If there is a legitimate reason to change, the project undertaking unit shall apply to the original project filing authority 30 days before the expiration of the original filing certificate. Major changes have taken place in the contents of the record, and the project applicant shall go through the alteration or cancellation procedures at the original project record-keeping organ in time, and the project record-keeping certificate that has not been changed in time will automatically become invalid.
2. The major change mentioned in the preceding paragraph refers to the change of project scale, main construction contents, product technical scheme, project investment and funding sources, project construction period and project construction address.
3. If the project undertaker changes, it shall cancel the original filing certificate and re-apply for the filing certificate. If the filing project is no longer implemented, the project unit shall timely apply for cancellation of the filing certificate.
If it is necessary to change or cancel, please log in to the Guangdong Provincial Enterprise Technological Transformation Investment Project Filing Information System (website: http://61.144.19.76/jgb/) to change or cancel the registered projects.
Four, the filing project investment submitted.
Technical transformation projects with an investment of more than 5 million yuan should be completed in the fixed assets investment table (technical transformation statistics report) before the 3rd day of each month, and the technical transformation investment last month should be submitted to the Town Street Statistics Group. It should be noted that 16 "Enterprise Technical Transformation Project" should be filled with "Yes".
name="3 " >
Chapter III: Technical Transformation Project of Power Station
Technical transformation project of Hongxing Power Station in XX Town, XX County
Implementation completion report
I. Basic situation of project declaration
Established in July, 2003, Hongxing Power Station Co., Ltd. in XX Town, XX County has strong technical force, perfect institutional setup and sound financial system. Since its establishment, the company has actively developed and utilized water resources, which has made contributions to alleviating the contradiction of power shortage in our county, promoting economic development and improving the town's fiscal revenue, and has been widely praised by the party Committee, government and people.
Hongxing Hydropower Station is located in XX Town, XX County, and is built in the upper reaches of the X River Basin. The original installed capacity of this power station is1× 75kW, and the average power generation for many years is more than 200,000kWh. In order to make full use of hydraulic resources, XX Town regards the expansion of power station as an investment attraction project. After investigation and preliminary design by the water conservancy department, the power station was transformed into an installed capacity of 480 kW, a design head of 5 1.5 m, an annual utilization time of 5,604 hours and an average annual power generation of 3.46 million kWh. The technical transformation of Hongxing Hydropower Station is conducive to improving the economic benefits of enterprises, providing more electricity for local industry, agriculture and residents' lives, and contributing to the rapid development of local economy. This is a project with good economic and social benefits.
In order to ensure the smooth implementation of the technical transformation project of the power station, we have earnestly made all the preparations for the project declaration, and invited engineers and technicians from XX Water Conservancy Survey and Design Institute and XX Water Conservancy Bureau to the power station for on-the-spot investigation and in-depth study, scientifically demonstrated the feasibility and necessity of the project construction, and completed the feasibility study report of the project on this basis. In view of the economic difficulties, our company applied to the superior for the transformation of provincial financial potential, and applied for the project on 20 10, which was approved.
The estimated investment of the project is 5.35 million yuan, including 4.55 million yuan raised by the enterprise, which needs to be reported to 800,000 yuan for support. The main contents of the project construction include: building a new production workshop of 360 square meters and building a supporting building of hydropower station 1 building; Build water diversion channels, increase the original water storage capacity, and improve the regulation of peak and valley electric energy; By introducing production equipment and transforming transmission lines, the installed capacity of the power station has been expanded to 480 kilowatts. After the expansion and technical transformation of the power station, the installed capacity will reach 480KW, with an estimated annual utilization time of 5,604 hours and an average annual power generation of 3.46 million kWh. It is estimated that the annual added output value will reach1159,700 yuan, the new profit will be 786,800 yuan, and the new tax will be 75,200 yuan, which can promote the economic development and the construction of new countryside.
Second, the project implementation
The technical transformation project of Hongxing Power Station was started in June, 20 10. During the project construction period, Hongxing Power Station Co., Ltd. raised 5170,000 yuan from various channels, and the provincial finance tapped 300,000 yuan, all of which were invested in the project construction, ensuring the smooth progress of the project and completing all the contents of the project construction as scheduled, including 360 square meters of power station production workshop and supporting buildings, and the construction of dam water diversion channels.
In order to ensure the smooth completion of the technical transformation project, Hongxing Power Station Co., Ltd. has done a lot of work: First, a working group on technical transformation of power stations has been set up to strengthen the organization and leadership of project construction; The second is to organize water conservancy technicians to conduct field surveys and scientific demonstrations for many times and formulate planning schemes; Third, raise funds for project construction in various ways to ensure the smooth progress of the project; Fourth, strictly control the project quality, strengthen the supervision and management of power station construction, invite experts and send technicians to carry out project supervision and technical guidance to ensure the quality of project construction; Fifth, strengthen the supervision of project funds to ensure the safe use of funds. Earnestly implement the national financial laws and regulations, improve the efficiency of the use of funds, set up financial institutions, formulate financial management systems, have a clear division of labor, strictly supervise the use of funds according to their respective responsibilities, achieve financial management objectives, set up special accounts for construction funds, implement earmarking, and strictly implement the financial examination and approval system to ensure the safety of project construction funds and promote the timely completion of the project.
With the support of the provincial reconstruction funds, the concern of the town committee government and the joint efforts of the company's employees, the technical transformation project of Hongxing Power Station was completed on 20 10 and 10, which brought good economic and social benefits.
The third is the completion of various indicators.
The technical transformation project of Hongxing Power Station was completed in June, 20 10. According to the settlement, the actual total expenditure of the project is 5,469,800 yuan, including 2,986,300 yuan for equipment purchase, installation and debugging, 2118,700 yuan for construction projects and 364,800 yuan for other expenses. After the completion of the technical transformation project, the installed capacity of the power station reached 480KW, achieving sales income of 6,543,800 yuan+220,000 yuan, actual new profit of 828,000 yuan, new tax of 796,543,800 yuan, exceeding the expected annual sales income of 6,543,800 yuan, new profit of 786,800 yuan, new tax of 75,200 yuan, and the effect rate of project expenditure. The successful completion of the technical transformation project of power station has effectively promoted the development of small hydropower industry in this town, promoted the economic development of X River, improved the fiscal revenue of this town, and brought good economic and social benefits into play.
Four, the project failed to complete, acceptance reasons
After the technical transformation project of the power station is completed as scheduled, our company also plans to apply for acceptance. However, since 20 1 1, the precipitation in our county has dropped sharply, the water storage of power stations is seriously insufficient, and the power generation is difficult to achieve the expected goal, which has caused difficulties for enterprises to operate and affected the declaration and acceptance of technological transformation projects.
Verb (abbreviation of verb) is the key point of the next step.
The technical transformation project of Hongxing Power Station was completed as scheduled, and the installed capacity of the power station was greatly improved. In the future, our power station will strengthen daily management, improve power generation and economic benefits, and make greater contributions to promoting industrial development, economic strength and ecological civilization construction in XX town.
Six, when to declare acceptance?
In view of the fact that the technical transformation project of Hongxing Power Station has been completed as scheduled, it is now submitted to the superior for acceptance.
20 12 March 15
name="4 " >
Article 4: Application Report of Technical Transformation Project
XXX technical transformation project application report
First, the project content:
1. construction content: transform the existing hanging roller pipe-making technology, introduce the whole set of core mold vibration pipe-making equipment technology of BFS company in Germany and domestic concrete mixing equipment, and comprehensively improve the manufacturing level of reinforced concrete drainage pipes.
2. Production scale: 3,000 ㎡ workshop is required for imported equipment and domestic supporting equipment. After the project is completed, the production capacity will be increased from the current 15KM-20KM/ year to 8- 100km/ year, and the annual output value will reach 65438+500 million yuan.
3. Estimation and source of funds: According to the preliminary investigation, the fixed assets investment of the project is about 26.59 million yuan, the working capital is about 2.66 million yuan, and the total investment of the project is 29.25 million yuan. The investment of enterprises is about100000 yuan (based on fixed assets such as land, factory buildings and equipment and part of working capital), and there is still a gap of about160000 yuan.
4. Production conditions: This technical transformation project is based on the old factory. There is a lot of spare space in the factory area, which can meet the needs of engineering construction after planning. The water, electricity, steam and other conditions of the factory can fully meet the needs of the project and future operation. The supply of main raw materials for construction and operation is sufficient, and the transportation distance is generally10-80 km; The ring expressway, the Third Ring Road and the special railway line are only a few hundred meters away from the factory, and the traffic is very convenient. This project is a technological transformation project, and can enjoy preferential policies such as tax exemption and tax exemption for national technological transformation projects. This project has been included in the "XX Key Technical Transformation Project Plan in 2004" compiled by XX Municipal Economic Commission, and has been issued by XX Municipal People's Government.
[2004] No.31was approved for implementation.
Two. Project progress: At present, our company has made the following preparations for the technical transformation project:
1, which has been approved by the Economic and Trade Bureau of Baqiao District, XX City, and approved by the Municipal Economic Commission to be included in the key technical transformation projects of XX City in 2004;
2. The feasibility analysis report and business plan of this project are compiled by XX Huading Project Management Consulting Company of Northwestern Polytechnical University.
3. The general manager of the company visited and investigated domestic manufacturers with imported equipment from the same industry;
4. von Idkevin, a BFS expert from Germany, was invited to visit the company on the spot. The two sides held talks on the import of key equipment in the production line and initially reached an import intention;
We have done some work around the project to win foreign investment and improve the investment environment.
3. Market forecast and advantage analysis: western development and XX development. The construction of transportation, energy and municipal facilities in Shaanxi Province and its surrounding areas requires a large number of reinforced concrete drainage pipes. It is reported that in 2004, the infrastructure investment in Shaanxi Province was about 20 billion yuan, and that in XX City reached more than 8 billion yuan. According to the forecast, in 2004, XX and its surrounding areas will need about 330KM of Ф 300-Ф 3000 mm reinforced concrete drainage pipes, and the annual speed will be about 10% in the next five years.
Grow up. There are only 4 to 5 concrete pipe manufacturers above designated size in XX area, and their production capacity cannot meet the market demand. In particular, there are few manufacturers that can produce large-diameter drainage pipes with a diameter of more than Ф ф2000mm, and the traditional roll hanging method or vertical vibration method is basically used in the production process, which has low efficiency, high labor intensity and unstable quality. If advanced foreign production lines are introduced and domestic computer-controlled concrete mixing systems are matched, it will be the first one in XX area. The production line has advanced technology, high mechanization and automation level, high production efficiency, low labor intensity, good quality, low cost and good benefit, which meets the requirements of environmental protection. The market share will rise from the current 20% to about 50%.
4. Investment return project and economic evaluation: According to the feasibility study report and business plan, the construction period of technical transformation project is expected to be 1 1 month, and the production capacity in the first year is expected to reach 60% of the design capacity; In the second year, the production capacity reached 80% of the design capacity; The third to fourteenth years are regarded as production years, that is, the production capacity reaches 100% of the design capacity. The life cycle of the project is about 15 years. Economic evaluation index: capital profit rate (static index) = 30.68%; The expense profit rate (static) = 9.79% static payback period =4.55 years; Dynamic payback period = 5.85 years; Dynamic return on investment =17.09%; Project internal rate of return = 24.43%; Average annual profit = 8 million yuan.
Verb (abbreviation of verb) Overview of enterprises
XX Cement Products Co., Ltd. is a private enterprise. The leading products are: reinforced concrete drainage pipes and reinforced concrete and prestressed reinforced concrete poles. The company is located in the east of Chanhe Bridge, Xianning East Road, XX City, covering an area of more than 365,438+0,000 square meters, with fixed assets of more than 65,438+0,000 million yuan, 220 sets of various special equipment, more than 65,438+0,20 employees and 20 professional and technical personnel, including 3 senior titles and 5 intermediate titles. The company has two production workshops, reinforced concrete drainage pipes and reinforced concrete poles, and a riveting and maintenance workshop. In 2002, the company's output value150,000 yuan, and in 2003, the output value180,000 yuan. In the past few years, it has paid more than 5 million yuan in taxes. Production of various models, specifications and varieties of Ф 600-Ф 3000 mm reinforced concrete drainage pipes, of which Ф 3000 mm large-diameter drainage pipes are the first in the northwest. The products are widely used in municipal administration, road drainage engineering, expressway around the city, expressways in Shaanxi Province and neighboring provinces, municipal drainage engineering, and Lanzhou West-East Gas Transmission Project across the Yellow River, which has won unanimous praise from users. Since its establishment eight years ago, the concrete pole factory has produced nearly 200,000 poles of various models, specifications and varieties, which are widely used in railway, post and telecommunications, electric power, wireless communication and urban and rural power grid reconstruction projects. Products are sold to ten cities in the province, Qinghai, Shanxi, Inner Mongolia, Henan, Jiangsu and other provinces, municipalities and autonomous regions, and exported to Angola and other African countries. The reinforced concrete drainage pipes produced by our company