The cost of inspection and test of construction projects accounts for about 0.2% of the total project cost.
Brief introduction of testing fee
Refers to the expenses incurred in the general appraisal and inspection of building materials, components and building devices, including the expenses of materials and chemicals consumed in the inspection of real oranges by self-built laboratories. It does not include the test fees for new structures and new materials, as well as the costs for the construction unit to inspect materials with qualification certificates, conduct failure identification tests for components and other special requirements.
Calculation method of folding and editing this paragraph
Material cost = ∑ (material consumption of simple materials × material base price)+inspection and test fee.
Base price of materials = {(supply price+transportation and miscellaneous fees) ×[ 1+ transportation loss rate (%)]}×[ 1+ purchasing and storage rate (%)]
Inspection and test fee = ∑ (inspection and test fee per unit material quantity × material consumption)
Legal basis:
People's Republic of China (PRC) building law
Article 1 This Law is formulated with a view to strengthening the supervision and management of construction activities, maintaining the order of the construction market, ensuring the quality and safety of construction projects and promoting the healthy development of the construction industry.
Article 2 Whoever engages in construction activities within the territory of People's Republic of China (PRC) and exercises supervision and management over construction activities shall abide by this Law. The construction activities mentioned in this Law refer to the construction of various buildings and their ancillary facilities and the preliminary installation of supporting lines, pipelines and equipment.
Article 3 The activities of building old birds shall ensure the quality and safety of construction projects and meet the national safety standards for construction projects.