Discussion on fire control, safety and hygiene system and measures of decoration engineering?

Fire control, safety and hygiene system and measures of decoration engineering

1, fire control system and measures

Besides personal injury, another major danger in building construction is fire. In the whole construction process, there are a lot of flammable materials and many open flames on the site, which are scattered. Coupled with lax management, some workers and cadres smoke everywhere on the construction site. In recent years, there have been many major fire accidents on construction sites in Xinjiang, with amazing losses.

Because of the high fire risk and many fire factors in the construction, it is necessary to implement the requirements of safe use of fire and earnestly implement fire prevention measures when organizing the construction.

(1) It is necessary to strictly implement the Regulations on Fire Control in People's Republic of China (PRC) and the Basic Measures for Fire Prevention in Construction Sites of the Ministry of Public Security. Strengthen the leadership of fire control work, establish voluntary fire control organizations, set up firefighters on site, educate employees who enter the site on fire control knowledge, and establish a safe fire use system.

(2) The site shall be divided into hot work area, inflammable and explosive material area and living area, and the fire prevention distance shall be kept as required. Conditions are limited, and the fire spacing can't reach the standard, so corresponding fire prevention measures should be taken to appropriately narrow the fire spacing. This practice should seek the opinions of the local fire department. In addition, it should be noted that flammable materials are not allowed to be piled up in the fire prevention interval.

(3) There should be a vehicle circulation channel at the site, and the width of the channel is not less than 3.5M It is forbidden to occupy the floor channel to pile up materials.

(4) The site shall be equipped with a special fire water pipe network and fire hydrants. For larger projects, fire hydrants should be set up in different areas, and for higher projects, fire risers should be set up, which should be connected with the construction progress to ensure that the range of water guns covers all parts of high-rise buildings.

(5) The overlay facilities, warehouses, inflammable material yards and fire places should have enough fire-fighting tools and equipment, and the fire-fighting equipment should be managed by special personnel and checked regularly.

(6) When installing and using electrical equipment, attention should be paid to the following fire prevention requirements:

1) All kinds of electrical equipment and lines are not allowed to be overloaded, and the line connectors should be firmly connected to prevent equipment and lines from overheating or short circuit. If problems are found, they should be fixed immediately.

2) In the warehouse where flammable liquids and flammable gas cylinders are stored, the lighting circuit should be protected by wearing pipes, explosion-proof lamps should be used in the warehouse, and the switch should be located outside the warehouse.

3) Wires passing through walls or wires close to combustible materials should be protected by pipes, and lamps should keep a safe distance from combustible materials.

4. Temporary buildings are not allowed to be built under high-voltage lines, and flammable materials are not allowed to be piled up.

(7) Problems that should be paid attention to when using naked flame:

1) The fire used for on-site production and living must be approved by the leader in charge of fire control, and no one is allowed to fire without authorization. When using naked flame, stay away from flammable materials and prepare fire extinguishing equipment.

2) The on-site boiler room shall be constructed of incombustible materials. Flammable materials near the top of the boiler should be isolated. Boiler room should be away from flammable materials. If the boiler room is downwind and there are flammable sites and facilities, a fire cap should be installed on the chimney.

3) Make a fire with wood, and someone should watch it at any time. Flammable fuel is not allowed for ignition. After using the fire, turn it off carefully.

4) A smoking room should be set up at the site, and smoking is strictly prohibited at the site.

5) Personnel engaged in electric welding and gas welding on site shall receive fire protection knowledge education and hold operation certificates. Before the operation, the procedures for using fire must be handled, and corresponding firewatch should be equipped. firewatch should carry fire extinguishing equipment with him, and he should not leave his post without permission during the welding process.

(8) Fire prevention requirements for on-site material stacking:

1) It is not advisable to pile too much wood, and a certain fireproof distance should be kept between piles. Wood processing waste should be cleaned up in time to prevent spontaneous combustion.

2) On-site quicklime should be stored separately, and it is not allowed to be enlarged together with flammable and combustible materials, and attention should be paid to waterproofing.

3) inflammable and explosive goods warehouse should be located in low-lying places.

(9) When using flammable materials to build a work shed at the site, the following provisions shall be observed:

1) There should be enough fire-fighting equipment at the shed, and a reservoir or bucket should be set.

2) The lamps and wires in the work shed should be insulated, and the distance between lamps and combustible materials should be kept at 30cm. When using large light bulbs, the distance should be increased, and iodine tungsten lamp lighting is not allowed in the shed.

(10) During the external decoration construction, the electrical appliances and wires used should be strictly managed to prevent short circuit and fire. When welding operations must be carried out in the flammable ceiling due to the special needs of the project, proper fire prevention measures should be agreed with the fire department before construction. In winter decoration construction, where naked fire or electric heating is used, special fire prevention measures and systems should be formulated. When using combustible coatings, attention should be paid to ventilation, and naked flames are strictly prohibited to prevent combustible gas from burning and exploding.

2. Safety measures

(1) The general contractor shall be responsible for the safety work responsibility system, and all subcontractors shall accept the unified leadership, supervision and inspection of the general contractor.

(2) The guard patrol system shall be established on the construction site, and the guard personnel shall wear duty signs, and the voucher access system shall be implemented for key projects and important projects.

(3) partition isolation, clear personnel identification, to prevent irrelevant personnel from entering.

(4) Do a good job in the protection of finished products to prevent theft, destruction and public security disasters.

3. Health measures

(1) Measures to reduce environmental pollution

All curtain wall materials in this project are pollution-free materials. Therefore, after strict management of materials and thorough cleaning of on-site scraps, it will not cause pollution to the site.

Auxiliary materials such as alcohol or toluene are used when locally cleaning the board on site. To this end, we will strictly control the use process, so that cotton cloth containing alcohol and toluene liquid will not flow or drip, and will be recycled centrally. And put an end to smoking to avoid accidents.

(2) Measures to reduce construction noise

Use high-efficiency and low-noise electric tools to prevent noise from interfering with residents' lives.

Try to carry out installation work during the day, and strictly stipulate that no construction will be carried out at night or residents will stop working during their rest time.

An integral protective net is added to the periphery of the building to block the noise.

The processing and production have basically realized factory production, and the on-site processing volume is very small. For the parts that must be processed on site, we will finish them indoors.