Seven cards:
Engineering overview sign.
Telephone cards of construction manager and supervisor.
Civilized construction card.
Fire card.
Safety production card.
Six discipline cards for safe production.
Ten safety technical measures.
Three pictures:
General plan of the construction site.
Fire control plan.
Layout of safety signs.
Civilized engineering construction refers to a kind of construction activity that keeps the construction site clean and hygienic, with scientific construction organization and reasonable construction procedures. To realize civilized construction, we should not only pay attention to the management of site capacity, but also do a good job in the management of site materials, equipment, safety, technology, security, fire control and living hygiene.
The civilized construction level of a construction site is a comprehensive reflection of the management level of the construction site and even the enterprise.
hypothesis
(1) has a complete set of construction organization design (or construction scheme).
(2) Have a sound construction command system and post responsibility system.
(3) The process connection is reasonable and the handover responsibility is clear.
(4) There are strict finished product protection measures and systems.
(5) Temporary facilities and various materials.
(6) The construction site is smooth, the roads are smooth, the drainage facilities are appropriate, and the water and electricity lines are neat.
(7) The machinery and equipment are in good condition and used reasonably, and the construction work meets the requirements of fire control and safety.