The No. 0 ledger is in our measurement of payment before the list of the sub-item measurement of payment ledger, at the same time for the ledger not only will be the amount of work in the list, but also to check the drawings of the error, and further practices will be added to the unit price declaration included.
Specific methods are as follows: the project bidding in the list of input into the EXECL form; in the form of columns will be: unit price, list of quantities, the contract amount, drawings of the design of the amount of work, review of the amount of work, the location of the project, the project stakes, drawing number, drawing page number, notes; in the form of the line of the list of the list of the re-establishment of a new line, will be designed to design the works on the table of quantities of the list of corresponding list No. entered into the form.
:Ledger, originally refers to the books placed on the table for people to read, so the name ledger. Over time, this term is fixed, in fact, is the running account. It includes documents, work plans, work reports.