In the act of leasing, the rent charged by the lessor includes not only the cost of investing in the item being leased, but also the profit made by the lessor in the leasing transaction. Below I share with you Equipment Lease Contract Simple Model 6, I hope it is useful to you, just for reference! 416814
Equipment Lease Contract 1
Lessee: (hereinafter referred to as Party A) Lessor: (hereinafter referred to as Party B) According to the "People's Republic of China **** and the State Contract Law" and the relevant provisions of the rights and obligations of both parties to the lease for the purpose of clarifying the equipment lease, Party A according to the needs of the project, the lease of Party B construction machinery ( Schedule), by the friendly consultation between Party A and Party B, on the leasing of machinery and equipment signed the following agreement, so that *** with compliance.
First, the model:
(see attached)
Second, the lease of the use of location:
Third, the rental period:
Party B received a phone call notification of Party A, and machinery and equipment to reach the date of Party A's designated site for rent, the rental period to the Party A formally notify the Party B to withdraw from the scene, Party B for any reason and not in accordance with the notification of the time limit for withdrawing from the scene, it will be The rental fee will no longer be calculated.
Fourth, the form of machinery and equipment leasing and settlement:
1, Party B will lease the machinery and equipment to Party A in the form of monthly rent, the monthly rent is RMB: ___________ yuan/month, ________ yuan/hour, the lease time is less than one month, according to the actual number of days of use settlement. Daily rent = monthly rent / 31 days;
2, machinery and equipment during the lease period generated by the freight costs by Party B is responsible for;
3, the settlement of rent: Party A in principle on the 25th of each month to Party B for the settlement of the lease fee once, and in the next month before the 5th to pay the previous month's lease costs. If Party A's superior or the owner of the allocation is not in place, Party B fully understands the difficulties of Party A's funds and agrees to a relative delay in payment; if Party A also needs to increase the machinery and equipment, the increase in machinery and equipment to adopt the price of this contract, the cost and payment with the provisions of the contract;
4, Party B shall be equipped with a qualified driver and hold a valid certificate of operation of the machine, twenty-four hours on-call to ensure that the Party's construction needs. Driver accommodation, wages, food expenses, etc. by Party B is responsible for.
V. Rights and obligations of Party A and Party B
1, machinery and equipment in the lease period, Party B mechanical driver to comply with Party A's work arrangements, Party B driver does not comply with Party A's arrangements, Party A has the right to require the replacement of the driver and terminate the contract. Driver during the operation of mechanical equipment and their own safety is fully responsible. Strictly in accordance with the operating procedures of machinery and equipment, no violation, otherwise all the safety accidents caused by Party B is responsible for, at its own expense;
2, Party B is responsible for mechanical equipment repair, maintenance, fuel, auxiliary oil, and its corresponding costs, the rate of completion of not less than 28 days a month, every day less than one day deducted from the monthly rent of one day, to ensure that Party A's engineering and construction of the normal;
3, Party A provides the construction site and guarantees the construction environment is good. Party B agrees that the construction site provided by Party A and the environment in line with the operating conditions of machinery and equipment;
4, Party B for Party A to provide machinery and equipment must be complete formalities (certificates of conformity, technical inspection certificates, etc.). If the mechanical equipment procedures are incomplete and detained by the local responsibility by Party B;
5, Party B's machinery and equipment should ensure that the appearance of clean, good technical performance, normal operation, to meet the needs of the construction, the mechanical equipment failure and Party B can not be repaired within the specified time, should be taken in advance to ensure that the normal construction of Party A's project;
6, Party B's mechanical equipment management personnel and drivers must obey Party A. Machinery and equipment management personnel and drivers must be subject to Party A's management, strict compliance with Party A's management system;
7, Party A has no right to sublet, auction, mortgage Party B's equipment.
Sixth, the responsibility for breach of contract:
l, A and B must strictly fulfill the terms of this contract, without the consent of the other party, no party shall not change or terminate the contract in the middle of the contract, any party that violates the provisions of this contract, will be responsible for compensating the other party for all the losses brought about by this;
2, all disputes about this contract, A and B should be in accordance with the "contract law" and other relevant provisions of the law of amicable settlement. and other relevant laws of the relevant provisions of the amicable settlement;
3, this contract in triplicate, Party A to execute two, Party B to execute a copy, effective from the date of signature, each with the same legal effect. The contract will be voided after the withdrawal of machinery and equipment from the settlement.
Party A (seal): Party B (seal):
Representative: Representative:
Manager: Phone:
ID card number:
Signing time: Signing place:
Equipment Lease Contract 2
Lessee: (hereinafter referred to as Party B) Henan Province Installation Group Co., Ltd.
Lessor: (hereinafter referred to as Party A) Jiaozuo Coal (Group) Co., Ltd. power supply engineering branch In accordance with the relevant provisions of the Contract Law, in accordance with the principle of equality and mutual benefit, in order to clarify the rights and obligations of the two parties, the two sides by mutual consensus, the signing of this contract.
1. During the lease period, the ownership of the leased instruments listed in the contract belongs to Party A.
2.
2, in the lease period, Party B, such as the leased instrument to improve or add other things, must obtain written consent from Party A.
3. During the lease period, if Party B sublets the leased equipment to a third party, it must obtain Party A's written consent.
Article 1: Delivery and acceptance of leased equipment
1, leased equipment in the delivery location, by Party A to Party B (or its agent) delivery. Party A shall not be responsible for any delay in delivery of the leased equipment due to unforeseeable, unavoidable and insurmountable objective circumstances.
2. Party B shall check and accept the leased equipment at the delivery place within 24 hours from the time of receipt, and at the same time hand over the receipt of the leased equipment to Party A after signing and sealing.
3. If Party B does not handle the acceptance in accordance with the time specified in the preceding paragraph, Party A shall consider that the leased equipment has been accepted by Party B in a complete state, and shall be deemed to have delivered the acceptance receipt of the leased equipment to Party A.
4.
4. If Party B finds that the model, specification, quantity and technical performance of the leased equipment are inconsistent, defective or flawed during the acceptance inspection, Party B shall immediately notify Party A in writing of the above situation on the day of delivery and Party A shall be responsible for dealing with the situation, otherwise, the leased equipment shall be deemed to comply with the agreed requirements of this contract and the annexes.
Article 2: Use, repair, maintenance and cost of leased equipment
1. The leased equipment shall be used by Party B during the lease period. Party B shall be responsible for the daily repair and maintenance to keep the equipment in good condition and bear all the expenses incurred.
2, in the process of work, if Party B can not troubleshoot the equipment, should promptly notify Party A for maintenance.
3, leased equipment in the process of installation, storage, use, etc., resulting in third-party losses, by Party B to assume full responsibility.
Article 3: destruction and loss of leased equipment
1, Party B bears the risk of destruction (normal wear and tear does not apply) and loss of leased equipment that occurs during the lease period.
2, in the event of destruction or loss of leased equipment, Party B shall immediately notify Party A, Party A has the right to choose one of the following ways, Party B is responsible for handling and bear all the costs: (1) the leased equipment will be restored or repaired to the state of full normal use; (2) replacement with the leased equipment of the same type, performance of the parts or accessories so that it can be used normally; (3) when the leased equipment destruction or loss to the extent that it can not be repaired. loss to the extent that it cannot be repaired, Party B shall indemnify us.
(4) If the instrument is lost or damaged beyond repair due to theft, Party B shall compensate Party A according to the normal depreciation of the instrument value.
Article 4: Liability for breach of contract
1. Party B shall not delay the payment of rent for any reason. If Party B delays the payment of rent, Party B shall return the instrument to Party A before the agreed payment date of the rent. If Party B fails to return the instrument on the same day, it is regarded as Party B continues to rent the instrument, and Party B shall add 5% of the rent payable to Party A on a daily basis. Before the rent payable by Party B is not in place, Party A reserves the right to stop the machine, such as payment to continue to rent (use), the loss caused by Party B is responsible for.
2, without the written consent of the other party, any party shall not change or terminate this contract; any party who violates the agreement of this contract shall pay to the other party 5% of the total rental amount of liquidated damages.
3. If Party B fails to pay the rent on time or violates any terms of this contract, Party A has the right to take the following measures:
(1) Require Party B to pay the rent and other expenses in time and ask Party B to compensate Party A for the loss;
(2) Terminate this contract, take back or ask for the return of the leased equipment, and ask Party B to compensate Party A for all the losses.
Article 5: Settlement of Disputes
All disputes arising out of or in connection with the performance of this contract shall be settled through friendly consultation between Party A and Party B. If the dispute cannot be settled through consultation, it shall be submitted to the Arbitration Commission of Party A's seat for arbitration award in accordance with the relevant procedures of arbitration. The cost of arbitration and the attorney's fee of the winning party shall be borne by the losing party.
Article 8: The two parties shall consult separately to resolve any outstanding issues. Annexes related to this contract have the same effect as this contract. Two copies of this agreement, a and both sides of a copy, both signed and sealed after the entry into force.
Lessee (Party B): Lessor (Party A):
Equipment Lease Contract 3
Lessee (Party A):
Lessor (Party B):
According to the "Chinese People's Republic of China *** and the State of the Contract Law" of the provisions of the two sides in the spirit of equality, mutual benefit, *** with the development of the principle, on the lease of Party A with the principle of the two sides. Principle, Party A rented Party B shovel matters, through friendly consultation between the two sides, reached the following agreement:
First, equipment configuration
Party B will LW300F loader equipment, the number of units, the operator of the workers, leased to Party A company to use.
Second, rent calculation and payment
1, this equipment is calculated on a monthly basis, and the monthly rent is RMB. (Capitals: )
2, from the date of signing the contract (i.e., the date of the month of the year) to collect the lease rent.
3. The rent shall be settled once a month and Party A shall pay the full amount of rent before the 15th of the following month.
3, Party B's duties and rights
1, responsible for equipment repair, maintenance, equipment itself, hydraulic and torque oil.
2, Party B operators must obey the Party A engineering reasonable scheduling, on call, and Party A to get together, seriously complete the tasks agreed in the contract.
3, Party B operators have the right to prompt loading and unloading technical requirements do not meet the loading and unloading operations.
4, the lease period, Party B's services are limited to the operation of the leased equipment, the quality of Party A's works, project progress, project materials do not bear any joint and several responsibility.
5. During the lease period, Party A will stop the work for any reason, no matter how long or short the time is,
Party B will still charge the rent to Party A on time.
Fourth, Party A's duties and rights
1, responsible for Party B's equipment storage, parking.
2, to ensure the safety of equipment and operators, responsible for arranging the accommodation and food for the operators and bear their expenses.
3, Party A shall give Party B one day per month for equipment maintenance.
4. Responsible for providing fuel (Sinopec or PetroChina, -10# or -20# diesel in winter)
V. Other Agreements
1. Party A shall not sublet Party B's equipment as collateral or transfer it to other construction sites for use in any way without the consent of Party B. Any loss caused by this shall be borne by Party A. Party A shall bear all the losses.
2. If the safety facilities and protection provided by Party A are not strong enough, or the equipment and operator's safety accidents are caused by unauthorized command, Party A will pay full responsibility. If the equipment and personnel safety accidents are caused by Party B's operators' own unauthorized operation, Party B's operators will be responsible for the accidents themselves.
3, the loader working time during the day, if there are special reasons for both sides to negotiate.
4, this contract is not exhaustive, the two sides negotiated to solve the problem, and attached to the agreement. If there is a dispute or consultation is unsuccessful, either party can be to the People's Court of Party A's location.
This contract is in one copy, Party A executes one copy, Party B executes one copy. Each copy has the same legal effect, both parties signed the date of entry into force.
Party A (official seal): _________ Party B (official seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ ____ ____ _________ ____ ____ Day
Equipment Lease Contract 4
Leasing unit: x company (referred to as party A)
Lessee: x (referred to as party B)
a. Party A agreed to the requirements of both parties, the original "x road hardware parts store" Leased to party B business use, the two sides negotiated the signing of this contract, *** with compliance.
Second, the original "x road hardware parts department" **** fixed assets of 23,000 yuan, of which the building area of 100 square meters, 65 square meters of business area, 11 shelves, counter 20 sections, insurance cabinets 1, a number of office appliances. Party B pays Party A the fixed asset occupation fee at the rate of 4% of the total fixed assets every month. Party B pays Party A a monthly fee of 160 yuan for occupying national liquidity.
Third, the original "x road hardware parts store" is a micro-profit enterprises, the average monthly profit in the past five years, about 1,000 yuan, after full consideration of Party B, agreed to pay 10% of the monthly profits to Party A as a co-ordination fund, generally not less than 120 yuan per month.
Fourth, this lease contract is valid for two years, from June 1, 20x to June 1, 20x.
V. During the performance of the contract, Party A shall supervise the direction of Party B's operation, be responsible for the business guidance of Party B, organize Party B to participate in various political activities, and ensure that Party B operates independently without violating national policies and regulations, and uses the profits independently in addition to paying the rent in full. Party B shall report the business operation to Party A in time, and if it fails to pay monthly, it shall be penalized 3% of late payment fee per day according to the amount payable.
Six, Party B in the lease period, a variety of political treatment remains unchanged, with the right to operate independently.
VII, Party B to Party A to pay the total rent of 1200 yuan, the beginning of each month within five days before the company's financial section to pay the general payment of transfer checks, such as not in the bank to set up a separate account, you can also pay cash.
VIII, the original three copies of this contract, A and B and the supervisory authority of each one, five copies, three copies of Party A, Party B, two copies, respectively, to the relevant departments for inspection.
IX, other matters not covered by the A and B parties to negotiate a solution.
Party A (official seal): _________ Party B (official seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ ____ ____ _________ ____ ____ Day
Equipment Lease Contract 5
Lessor (hereinafter referred to as Party A):
Lessee (hereinafter referred to as Party B):
In accordance with the "People's Republic of China*** and the State of the Contract Law" of the relevant provisions of the principle of equality and mutual benefit, in order to clarify the rights and obligations of Party A and Party B, the two sides by mutual consensus, sign this contract. Party B need to pay $ (¥ ) as a deposit of equipment, Party A received a deposit of three working days after the provision of mechanical foundation map to Party B, to be Party B to do a good job of the mechanical foundation, and connected to the mechanical needs of the corresponding power supply box to the mechanical side and the water source Party A timely arrangements for shipment.
Article I: the name of the leased equipment, specifications, quantity, rent and lease agreement: attached to the list of equipment as an annex to the contract.
Party A will rent machinery and equipment to Party B to use, Party A charged rent of RMB (¥ ) per month, the rent does not include tax, the deposit does not include interest. The deposit will not be moved, and the rent will be collected on time every month, and Party A will collect the rent of the next month in advance within the last ten days of the last month. If Party B needs to issue tax-inclusive invoice, another 17% tax shall be paid. Party B needs to rent the machinery up to days, if not up to days, then also according to the days of rent, such as more than days, more days, according to the actual number of days of rent, the rental period of Party B has a nested, Party B is still required to pay the monthly rent to the Party.
Article II of the lessor's equipment operators and salary payment:
1, Party A for the leased equipment with operators, their wages by the party responsible for bearing, per person per month at the rate of RMB (¥ ), the operator's salary in Party A agreed to its personnel directly in the Party B to receive, Party B deducted from the rent of the Party to receive the amount of wages.
2. Party B is responsible for arranging the accommodation and food for the operators, and Party B is responsible for the accommodation and food costs.
Article 3: Lease form and other agreements:
1. The starting date of the lease is calculated from month to month until all the equipment is returned to Party A, and after Party A accepts the lease, the lease contract will be terminated. If the starting date is not signed, the rent will be calculated on the next day after the date of signing the contract.
2, the use of leased equipment location changes must be recognized in writing by Party A, if Party B privately change the use of location, according to the theft of behavior, according to the original price of leased equipment compensation to the Party. Leased equipment location:
3, mechanical equipment loading, unloading crane fees, round-trip freight are responsible for Party B, and pull back to the location specified by Party A, the contract termination time for Party A and Party B to complete the withdrawal of kang acceptance procedures until the acceptance of the Party A, the termination of the lease contract is considered to be.
4, to be returned to the mechanical equipment, Party A from the deposit, after deducting all the costs payable by Party B, the remaining deposit Party A one-time return to Party B.
5, Party B does not pay the rent on time, Party A has the right to stop using the equipment and pull the machinery and equipment back to the site, all the costs caused by Party B is responsible for.
6, Party B site of any economic or legal disputes, can not pay rent to Party A on time, Party A can pull the equipment at any time, the resulting loss is borne by Party B.
Article IV Ownership of leased equipment:
1. During the lease period, Party B must obtain Party A's written consent if it increases or removes any parts of the leased equipment.
2. The ownership of the leased equipment under this contract belongs to Party A. Party B shall not sublet, mortgage, or sell Party A's equipment to any third party, and if Party B has any of the above behaviors, Party B shall compensate Party A according to the original price of the machinery and pay the liquidated damages.
Article V. Arrival and acceptance of leased equipment:
Article VI. When the leased equipment arrives at the agreed place, Party B (or the person in charge of Party B's site) will organize the acceptance. If the leased equipment arrives late due to force majeure factors, Party A shall notify Party B in advance and determine the deferred time after consultation.
1, the equipment in the use of the process of failure, Party A operator and Party B personnel can not exclude themselves, Party A received a notice within 24 hours to arrange for personnel to go to the maintenance within 48 hours of the maintenance personnel need to arrive at the scene, overdue Party B deducted the rent of the maintenance date, but the maintenance personnel which travel expenses by: (1) Party B is responsible for; (2) Party B each time to Party A to pay maintenance personnel Travel expenses per person per day yuan.
2, Party B leased Party A pump equipment, Party B is responsible for the construction of the installation of the pump pipe, removal, cleaning work, construction of the blocked pipe needs to be immediately removed, if not removed in time to cause the pump pipe inside the concrete hardened caused by the pump pipe can not be used, Party B according to the list of the original price of compensation to Party B, and at the end of the lease needs to be provided by the Party A pump pipe and fasteners collection of unified stacking, in order to both sides of the counting! Do the exit procedures, Party B personnel failed to collect the pump pipe and fasteners, the missing part of Party B according to the original list price compensation for Party A's losses.
3, Party B is responsible for the mechanical use of wearing parts replacement, such as (lithium grease, lubricant 00 # No., pump tube seals, grease, oil, mixer wire rope).
4, machinery in the use of the process of mechanical damage caused by Party B can not work, maintenance and all other costs are responsible for Party B, the reasons are as follows (1 site blackout machinery can not work to cause the concrete congealed in the machinery and pipeline, the 2 power supply caused by the lack of phase damage to the electrical and electrical machinery, 3 damage to personnel and other equipment collision caused by the damage)
5, Party A personnel in the repair or maintenance process. Repair or maintenance process if you can not repair the equipment failure in a timely manner, you should promptly notify Party B. Normal repair and maintenance not more than five months. Normal repair and maintenance of no more than five days a month, more than five days Party A deducts the rent for the time exceeded, but does not bear any losses and costs caused by mechanical failure repair and maintenance
6, Party A personnel in the repair or maintenance of non-perishable parts need to be purchased, you can advance to Party B accessories and related costs, Party B in the settlement of the rent deducted from the cost of their advance.
Article VII safety and management of leased equipment:
1, the operator needs to comply with Party B's rules and regulations, obey the command, according to the operating procedures of the equipment standardized operation, if the operator does not operate in accordance with the operating procedures standardized operation, do not listen to Party B's construction personnel command, the situation is true Party B can each time to the operator of the fine of 200 yuan.
2, Party B provides free equipment for Party A parking space, and is responsible for the safety of Party A mechanical equipment and accessories, in case of theft
Article VIII of the rental equipment in the use, repair, maintenance of both parties and obligations: lost, damaged by Party B according to the original price of compensation.
Article IX Liability for breach of contract:
If one party fails to fulfill the obligations of this contract, resulting in direct and indirect losses to the other party, the defaulting party to pay liquidated damages of yuan.
Article X of the unfinished business, the two sides to negotiate a separate solution, this agreement in two copies, A and B each party to sign a copy, the two sides signed after the entry into force.
Party A (official seal): _________ Party B (official seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ ____ ____ _________ ____ ____ Day
Equipment Lease Contract 6
Party A: Tel:
Party B: Tel:
A and B near friendly consultation, Party B by Party A entrusted to provide various services are as follows:
A. Lease equipment:
Stage, speakers and mixing equipment and so on. Power supply, site, etc. Please prepare.
Second, the date of service:
year month day time to year month day time. If the activity time is one day, Party A shall provide Party B with lunch.
Third, the place of service:
Fourth, the nature of the service, rent payment:
Party B is responsible for the time and place agreed upon by the two sides will be all the equipment transported to the installation and debugging, after the end of the activity by Party B back to the equipment. Party A needs to pay the full amount to Party B, as labor compensation. The total cost is: .
V. Default terms:
1, the two sides in the contract, such as one party canceled without reason, need to compensate for liquidated damages, for the actual loss.
2, in case of weather and man-made reasons so that the activities can not be held or interrupted in the middle, the two sides will decide the aftermath of the discussion.
3, the contract in accordance with the relevant laws of the People's Republic of China **** and the country, if any outstanding issues, the two sides need to be another written agreement or in accordance with the relevant laws and regulations. If there is a dispute, the two sides can not be successfully resolved, will be in accordance with the relevant laws of the People's Republic of China *** and the State, through the relevant organizations to resolve.
Six, this contract in duplicate, A and B each holds a copy, signed and sealed by both parties to take effect
Party A (official seal): _________ Party B (official seal): _________
The legal representative (signature): _________ The legal representative (signature): _________
_________ ____ ____ _________ ____ ____
Simple Model Equipment Lease Contract 6 Related Articles :
★ Simple Model Machine Lease Contract 5
★ Simple Model Lease Contract for Production Equipment 3
★ Simple version of the equipment leasing service contract model 3
★ Simple version of the personal machinery leasing contract model 3
★ Simple machinery and equipment leasing contract model 3
★ Instrumentation and equipment leasing contract model 10
★ Machinery and equipment leasing contract model simple 3
★ Universal version of the equipment leasing services contract model 3 p>
★ Simple machinery leasing contract sample 3
★ Machine and equipment leasing contract sample 4