Time flies, a white horse, a period of time has come to an end of the work, review the strong through this period of time, the achievements of the hard-earned, it should be a good job to write a summary, analysis of the past period of time the work. But how to write a job summary to be outstanding? The following is my compilation of the engineer's probationary period of work summary (selected 5), I hope to help you.

Engineer probationary period of work summary 1

Time passes very quickly, in the daily tension and full of work, in a flash I have come to the company almost half a year. In these six months, in the company and the leadership of the department under the care and leadership, in the department of the enthusiasm of colleagues to help and guide, through the critical period from the student to the transformation of professionals, I learned a lot, but also felt a lot of review of the six months of work and thought of the changes, is now summarized as follows:

First, the training and learning. Feelings

Professional technical and product knowledge for my pre-sales technical support position is very important, in March I came to the company has been trained in technology and product line knowledge, the company's products and technology have a basic understanding of the group came in July and then arranged for us to go to the base of the internship as well as two weeks of training courses, the real contact with the product itself, so that I have a great understanding of the degree of the product. The degree of understanding of the product has been greatly improved, and at the same time, through in-depth technical training, also makes me have a certain technical basis.

After reporting to the department, the leadership has arranged for Mr. Ma Qiang to be in charge of the training of several new employees, and at the same time asked Mr. Zhang Kun and Mr. Zhang Wei to give us a more detailed explanation of the product, the program, high performance and other knowledge, Mr. Ma Qiang is to organize the establishment of a few of our new employees to set up a study group to arrange the study plan, through these trainings and studies, so that I not only enriched my own professional knowledge, more Through these trainings and studies, I have not only enriched my professional knowledge, but also improved my professional quality and comprehensive level.

In the process of work is also a learning process, after entering the department I feel that the learning atmosphere within the department is very strong, there are any questions you can ask the teachers, they are also very enthusiastic to give me the answer, at the same time, the department will be arranged every week a certain content of the professional training, which is for my kind of need to quickly absorb new knowledge of new employees have a great deal of help, more importantly. In the process of these continuous training, so that I have developed a habit of continuous learning.

The feeling of the work process

When I first started working in the department, I knew almost nothing about the content and duties of the work, and I didn't know how to start. But Mr. Zhang Kun and Mr. Zhang Wei didn't dare to give me the task because I was a new employee who didn't know anything, but boldly gave me the project to do, so that I could practice. I remember the first time Mr. Zhang gave me a project program to do when I was nervous and excited, that program I did a whole week's time, during which to Mr. Zhang reviewed 4 times, reworked 3 times, asked a lot of very basic questions, Mr. Zhang were all patient answers, although the task was not completed on time, but from this program production I learned a lot of training when I could not learn things, to understand a lot of their own need to improve the place. In the next few months, I strengthened the program selection and product knowledge, but also the previous department of the success of the case out of the careful study and practice, and at the same time in the guidance of Mr. Zhang, now I complete a simple program production only takes a very short period of time, the ability to work has been greatly improved.

In addition to program production, pre-sales and sales to visit customers, which requires me to have a strong presentation and communication skills, which is also a fresh graduate of the most lack of ability. In the department's training, Mr. Ma Qiang arranged a lot of presentation exercises to exercise our presentation skills, but this is only an exercise, and in the actual work and customer communication still shows their own shortcomings. The first time on the stage to the customer to do the explanation of the feeling is very nervous, not very natural and confident, not very well prepared, in short, a relatively failed customer visits, I came back to seriously summarize the lessons learned in the next period of time to take the initiative to follow a few teachers to visit the customer, to learn their visiting skills, but also through the phone to visit the customer, and customers in the actual communication in the exercise of themselves!

From the very beginning of the pre-sales position of no understanding, to now be able to basically cooperate with the sales to complete the project, including the production of program configuration, customer visits, as well as bidding, training, and other pre-sales of the basic work, in addition to their own efforts, more inseparable from the teachers and leaders of the guidance I have, it is with their great help I can be adapted to the pre-sales of this work in such a short period of time, I would like to thank them, in particular, I would like to thank them, and I would like to thank them. I would like to thank them, especially Mr. Zhang Kun, Mr. Zhang Wei and Mr. Ma Qiang for their guidance.

Third, the feeling of thought

First of all, I think it's the cultivation of a sense of responsibility, which is something that Mr. Zhang Kun and Mr. Zhao have been emphasizing to us. As a pre-sales, the first thing is to have a sense of responsibility, to treat every project and every customer with an attitude of ownership, because in the eyes of the user, the pre-sales staff, on behalf of the company's technical level of technical experts, on behalf of a company's technical strength and image, the pre-sales staff's sense of responsibility also determines the customer's impression of the company as well as the success rate of the project, so as a pre-sales, not only in the technical aspects to impress the customer, but also important. So as a pre-sales, not only in the technical aspects to impress customers, but more importantly, to give customers a responsible attitude towards his project, so that he can rest assured that the project to you. This is also a pre-sales of the most basic qualities. This is also a reflection of Wave's corporate culture: focusing on the customer as the center of attention, and being responsible for the customer is also responsible for the company.

The second is to consider the comprehensiveness of the problem and meticulous, as a pre-sales technical support, you recommend products and programs in every aspect of the full range of considerations, in particular, the program's implementability and configuration of the meticulousness, can not make any mistakes, or not only for the customer, but also for the company's loss.

Fourth, shortcomings and improvements

Through six months of work and study, I feel the most deficient in two places, one is the technical knowledge and product memory and understanding is not enough, a lot of things only stay on the surface of the impression, which allows me to do the program can not be quickly unfolding ideas, a lot of things need to go back to the second find and confirm, which is very inefficient, but also to make the program more efficient. Confirmation, so the efficiency is very low, but also a great waste of time. Secondly, there are some deficiencies in the presentation, and there is still a lot of room for improvement in the presentation ability. But I believe that as time increases and experience accumulates, these problems will be solved in the future work and learning process.

V. Objectives

In the current global financial crisis, the competition is more brutal and fierce, as our new employees, we can only as soon as possible to improve our business and technical skills, more professional, meticulous, thoughtful service to customer satisfaction, so that the customer value of the maximization of the economic crisis in the face of a real increase in our own competitiveness, for themselves and for the company. Self-competitiveness, for themselves and for the company to bring greater value. Although this will encounter a lot of difficulties and obstacles, but I think no matter what kind of difficulties encountered, the more important thing is to be able to overcome themselves. As long as they have gained, have made progress, can be recognized by customers as well as colleagues and trust, and then again hard and tired, they are also happy and happy.

"Empty sadness, white young head", life as the ancients said, while now young to learn more things, do more things, do not waste life. So I want to be more full of spirit and full of energy into the usual work and study, never let down the company's trust and cultivation of me, and as soon as possible to grow up and become a qualified pre-sales engineers.

Engineer probationary work summary 2

Time flies, I joined the real estate company has been more than 3 months. During this period of work with many experienced, strong professionals **** things make me benefit a lot, from which a lot of practical work experience and professional knowledge.

I was very honored to join the real estate company in mid-June 20xx, and in the company's project engineering department as a civil engineer management-related work. When I first came to work in the engineering department, the leadership of the project department and the enthusiastic help of colleagues, a general understanding of the project profile, and quickly familiar with the company's organizational and management structure and workflow, and quickly entered the work role.

Frankly speaking, it should be said that since the construction industry or the first time to participate in the construction of such a large-scale project, I will cherish and grasp the real estate to give me this opportunity to practice, and ultimately will do their best to do a good job.

1, review to join the real estate company this time since the work of their own main work summary and engineering colleagues *** with the project construction construction process of the organization and implementation, project quality, progress, cost, safety and other objectives of the refinement of the division and control, to ensure that a phase of the project to achieve the desired goals of the various stages.

2, actively participate in the construction drawings and design review (design unit weekly to the scene to solve drawing problems), timely collection of the actual situation on the site and other relevant information provided to the design institute as a basis for the final formation of a consistent processing opinions, design changes as a focus of the requirements of the supervisory and construction units to strictly implement.

3, urge the contractor to seriously fulfill the responsibilities and obligations set out in the construction contract, and to maintain the rights and interests of both parties.

4, according to the specification review of the construction organization design, construction program, put forward the views and supervision with the party **** with the supervision and implementation.

5, strict monitoring of the quality of construction, and actively participate in the quality of the project, the investigation of accidents, handling, etc..

6, weekly supervisory units to participate in the supervision of the organization of the regular meeting (including the site of the special meeting), for the site of the actual problem to the parties in a timely manner and require rectification and implementation.

7, to enter the construction site of the project materials in conjunction with the supervision unit for quality inspection, acceptance, according to the provisions of the inspection.

8, supervise the construction of the general contractor to do a good job on-site safety protection, fire, civilized construction, environmental protection, health and other work.

9, supervise the supervision unit to increase supervision, supervise the contracting unit quality management system, technical management system and quality assurance system in place.

10, review the reasonableness of the project progress plan, supervise the contracting unit according to the total progress of the weekly and monthly plans, assessment of the completion of the situation, and deal with the existing problems.

12, to participate in the important parts of the project inspection batch, sub-items and other acceptance; and collect and organize the relevant project information for inspection.

13, according to the company's workflow validation and countersigning engineering changes (including on-site negotiation) documents, and timely inspection of the implementation of on-site construction.

14, and related units liaison, communication, for the later construction to lay a good foundation.

I am fully aware of some of my own experience in the work of the lack of experience and inadequacy, and in the future to strengthen the study of professional knowledge and management knowledge, and strive to improve themselves.

This phase of the work in general is still smooth, although the overall progress of the project in the early stage of the impact of more factors, but are not a unit or individual reasons, I believe that through my team of Xiangmulin project personnel unremitting active efforts, will continue to overcome the difficulties hindered, while through the early integration of the late will be better with the project into the normal construction of the track up.

Taking stock of yesterday, grasping today, looking forward to tomorrow.

A company is a big family, everyone works together, and constantly enhance the cohesion of my хх project team, I firmly believe that through the unremitting efforts and efforts, our tomorrow will be better, хх tomorrow will be more brilliant!

Engineer probationary period of the work summary 3

I am a fresh into the society of the university graduates, xx graduated from Xi'an Petroleum University in xx years of material molding and control engineering, graduated from the technical group of the project department of Inner Mongolia in Hebei Huabei Petroleum Engineering and Construction Co. To xx August work has been a year, in this short one year time I learned a lot of school can not learn the knowledge, broaden the horizons, improve the level of professional and technical level and work potential.

First, participate in the project

In this year, I participated in the Guangdong Daya Bay 800,000 tons of polyethylene project, oil extraction plant to stay in the third eighteen transfer station (Phase II) renovation project, the second station renovation project, the road 70 joint station reconstruction and expansion project, as well as the current construction of the North China Oilfield Erlian branch of the 53-well group of too test mining surface engineering. Project. Just arrived at the unit to work in the South China Sea Petrochemical Project Department in Daya Bay, Guangdong Province, the South China Sea Petrochemical Project is a joint venture between Sinopec and a foreign company, in the South China Sea Petrochemical Project, I took part in the finishing of technical data and translation of drawings in Block 1014, and was responsible for the anticorrosion and thermal insulation and elimination of tailings in Block 1012 at a later stage. After returning to Renqiu, I took part in the renovation project of Oil Extraction Plant No. 3 Stay 18 Transfer Station (Phase II) and the renovation project of Li-II Station. The projects of Stay 18 and Li-II Station are the renovation projects of the old station, and there are a lot of dangerous places in the station where the fire is connected with the head, together with the complicated local relations, which caused great inconvenience to the construction. In March this year, I participated in the road 70 joint station reconstruction and expansion project, road 70 joint station is located in the junction of Suning County, Hebei Province, Wanli Township and Xian County, Kongzhuang Township, north of the Guyang River, the expansion of the information: the construction of an additional external transmission system and dewatering system, the construction of an additional part of the injection and sewage treatment system.

The project that I am currently participating in is the trial mining ground project of the Tai 53 well group, in which I am mainly responsible for the construction of the station process, single wells outside the station and the civil construction part. Uriastai oilfield is located 7km north of Dongwuqi, Xilingol League, Inner Mongolia Autonomous Region, about 50km away from Mongolia and about 165km away from Arshan oilfield base, which belongs to the Uriastai depression at the northeast end of Manit depression in Erlian Basin. The ground project of Tai 53 well group test mining consists of four parts: metering and oil pulling station, natural gas compression, off-site system, and Ar-Yilian pressure regulating station. There is one new metering and oil pulling station, located in the north side of Tai 53 wells, with one 9-head metering skid, two separators, two heat exchangers, one natural gas dryer, two oil removers, two hot water pumps, one water injection pump, four 40m3 elevated tanks, one 10m3* tank, and a separator operation room, a duty room, a hot water pump room, an electricity distribution room, a maintenance room, a water injection pump room, and a storage room, laboratory and other plants; the system outside the station has the construction of 9 oil wells and 4 water injection wells; the expansion project of the Tai 27 water injection pump house and the test mining ground project of 3 water injection wells; the natural gas compression part is located on the north side of the Tai 53 wells of the Uriasthai oil field, in the middle of the metering and pulling oil station. The device for the understanding of the first stage of production separator to the trial recovery of associated gas, associated gas into the device, after * control skid block separation dehydration, dealkyne. Then part of the natural gas goes to the gas generator for fuel, and part of it goes to the natural gas compressor to be pressurized to 25MPa, and then goes to the molecular sieve dehydration device for dehydration. After pressurization and drying, the natural gas is loaded onto a CNG high pressure trailer and transported to AYL, and then pressurized to fuel the heating furnace; AYL pressurization station understands CNG compressed natural gas from the 53 metering and oil pulling station, and enters the station through the unloading port into the pressurized skid, and then goes to the heating furnace to fuel the heating furnace after two heat exchanges and two levels of throttling.

Second, the improvement of professional knowledge

I am studying material forming and control engineering, which is the former welding equipment and technology. In the school only learned some theoretical knowledge, the opportunity to practice very little, the site is a good place for me to learn and practice. To the site found that the previous theoretical knowledge learned in school is too superficial, practice is very difficult, in the site I will be to the master workers humbly ask for advice, there is no understanding of the place I asked, after a year of work practice, increased my professional knowledge, improve the practice of self-potential, the theory and practice a good combination.

Make full use of the spare time has systematically studied the oilfield production, management of theoretical knowledge, open-minded to master learning, in-depth construction of the site line, pay attention to the practice of experience and absorption of the past work, in the leadership of the care of comrades and the support and help, after continuous efforts, I adapted to this work, with the necessary technical work potential, but there are still some shortcomings, in the future work, I will continue to work in the field, and I will continue to work in the field, I will continue to work in the field. Some shortcomings, in the future work, I have to strengthen learning, overcome shortcomings, and strive to improve my professional and technical level. At the same time, I clearly recognize that, in order to adapt to the new situation of oilfield construction and development, we need to continue to strengthen theoretical learning, especially new technologies, new theories, hard work, exercise and growth in practical work, and continue to accumulate work experience, improve the business potential and level of work for the development of the company to make a new and greater contribution to the company's self.

Engineer probationary period of work summary 4

In this year's work, after the guidance of the unit leadership and the help of colleagues, through their own continuous efforts, both ideological, or work, have made great progress, so that I will be learned from the school of knowledge applied to the technical work, the combination of theory and practice, consolidate the knowledge, learned the technology, I now summarize the work of my apprenticeship period As follows:

First, maintain the mentality, correct position, compliance, and strive to improve their ability in all aspects

Maintain a good mindset, correct position of the learner, strictly abide by the rules and regulations of the Ministry of the project, is an important prerequisite for new college students to do a good job. As a new college student, a new employee into the enterprise, we have only theoretical knowledge, however, the actual operation and theory is a big deviation, especially for us construction workers, many valuable things simply can not be learned from books, are millions of old employees feel out. So I always remind myself to maintain a positive, dedicated and good attitude, the position of a learner, compliance, hard work, continuous learning, improve their own ability in all aspects. I understand that, as a new field of college students, now my own aspects of their own there is a great lack of space to improve is huge, and now we just pay dedication, hard to learn the stage.

A high diploma does not mean that the level of high, not to mention the ability to work, to the book knowledge and flexible application to the work of practice there is a long process. In the construction work, I found that some teachers, diploma level is not high, but the actual work of the ability is very strong, analyze the scene of the problem tends to hit the nail on the head, often with a simple, colloquial language or a few gestures can make the Mo workers understand the work of the objectives, measures and methods. These are very worthwhile for me to learn and comprehend, their rich experience is a valuable asset, is the source of my learning; "nothing is too big or too small, we must do our best", regardless of the big and small things, every more things will certainly learn more knowledge, will certainly accumulate experience. In this year, I started from the initial followers, to keep an eye on a work surface, to manage multiple work surfaces, and now I can lead a shift independently. While completing my work, I learn with an open mind, think over and over again, find out the shortcomings, and strive to get a little improvement in every thing I do." Through one year's work and study, I have improved my ability in all aspects. This is also my most gratifying place.

Two, willing to suffer, the ability to work will improve

Now college students are known as the "son of the sky", the university management is loose, life is comfortable. Especially now most of them are only children, so now most people have long been unable to bear a little bit of suffering, and are not prepared to suffer. But we all know that the site life is hard monotonous. Since we chose this line, we should put the "ready to suffer" consciousness in the first place. After I was assigned to XX, I went directly to the front, doing on-site construction work. We all know that the conditions in Morocco are much tougher than at home, especially in the front, all year round, the scorching sun, the howling wind, dusty. And to deal with a large number of Moroccan workers, we and the Moroccan people's way of life, way of thinking are not the same, and the language barrier, there are great difficulties in communication. In addition, the first thing to contact in the front is a large number of construction equipment, which I know nothing about. So for my work I have also been afraid, retreat.

But ultimately, in the colleagues, the teacher's carry, help, through one difficult pass, their ability to work, management level. Interaction skills have improved dramatically. Most of the problems on the scene can be well solved and dealt with. In the words of a colleague, you see, perseverance is victory, you come to what the ball will not, and now what all understand it. Self-perception is that I just came to nothing, and now I know a little bit of everything, and I'm quite satisfied with this feeling. Since then, I have devoted myself to the construction work, to the pain for the joy, to the pain for the honor.

Three, to be enterprising, efforts will be rewarded

"Attitude determines everything", vigorous, positive attitude towards life, not only can make others impressed by you, but also more importantly, to promote their own efforts, and positively face the work of the difficult problems that arise to study, analyze, and solve. We just came out of the university, there are passionate, boiling blood, then we should always maintain a spirited state of mind, fully committed to the work, and constantly strive to have a harvest. The work experience in the front makes me understand the connotation of "accumulation and thinning", without a long time of refinement and accumulation, it is difficult to achieve a career. Working at the front is to put oneself at the grassroots level, which is a process of accumulation, accumulating experience and enriching life; it is also a process of precipitation, precipitating knowledge and integrating; and it is also a process of improving ability, growing talents and maturing. I immensely cherish this time in the front, will continue to work hard, and will firmly grasp the self, and strive to go beyond the self, so as to achieve success.

Fourth, the five overseas business unit for pride, to xx project department for home, to realize the greatest interests of xx and struggle

Perhaps a year ago into the overseas business unit is still not quite understand, and now, with the passage of time, with the familiarization of all aspects of the work, I y feel that the original choice is wise, now the I am proud of the Overseas Division. Under the great wisdom of the leaders, our overseas division is gradually bigger and stronger, and I can foresee that my tomorrow will be more brilliant and better. If you identify with the enterprise, you should have the sense of responsibility of the master, you should take the enterprise as your home, love the enterprise as you love your home, and keep working hard to contribute your strength to the enterprise. At the same time, the brilliance of the Fifth Bureau of overseas projects is not a slogan, but by hard work and sweat cohesion, which is a hard and long process, not only need the efforts of the older generation, but also need our new employees to struggle, we are eager, "Overseas Division" in our hands to realize the glory. On the other hand, as a new employee I see more clearly their own development space, as a newcomer to the enterprise, now I need to do is to continue to learn, and constantly improve, do not go to make unnecessary comparisons, do not go to the boredom of the catty, and now just my dedication to the moment, I y believe that there is a place for only have a place for the development of space in front of you, the key is how you go to grasp the grasp.

Now our xx project has encountered a lot of unimaginable `difficulties, at this time we should not shirk their responsibilities, looking for objective reasons or complaining. We should rise to the challenge, not afraid of hard work, not afraid of tiredness, to play their own ingenuity, in order to achieve the greatest interests of the Ministry of xx project and strive to realize our value.

V. Suggestions to the company

With the development of society, people's demand for quality is getting higher and higher, and quality is a solid foundation for the survival and development of an enterprise. The improvement of quality depends on the overall quality of workers and the improvement of technical management level, in order to be able to face the more fierce competition, the cultivation of high-quality, high-level professional technicians and managers is the focus of the company.

The past work, in the care of the leadership and comrades support and help, after continuous efforts, I adapted to this kind of work, with a certain degree of technical work ability, but there are still some shortcomings, in the future work, I want to strengthen learning, overcome shortcomings, and strive to improve their professional and technical level can continue to improve. At the same time, I clearly recognize that, in order to adapt to the new situation of unit development, the future also need to constantly strengthen theoretical learning, especially new technologies, new theories, hard work, exercise and growth in the actual work, and continue to accumulate work experience, improve business capacity and work level, for the development of the company to make their own new and greater contribution.

Six, thanks

I can adapt to the current work, and can make continuous progress, and the leadership and the team's selfless help and care of the masters are inseparable, I would like to express my gratitude. Thank you for all the leaders, especially Miao Peng Miao captain, my most direct leadership, my work this year to do a unified arrangement and general planning; thank you for all the masters in the team, especially Chen Jinghua Chen masters, Tang Li Tang masters, they put decades of work experience bit by bit can teach all teach me.

People's lives in the long river of history seems so short, then, people live a life in order to what? Everyone has their own different views. I think, in order to reflect their own value, in order to confirm their own value, then, not in vain this life. And the value of self is reflected in the usual treatment of everything you do, but also concentrated in your work. I would like to take this sentence as a conclusion, "For the sake of overseas business, for the sake of Sino-African friendship, I would like to struggle and struggle again!"

Engineer probationary period of the work summary 5

I since 20xx in x month to participate in the work, serious work, hard work, in the guidance and help of seniors and masters, has grown into a strong business ability of the technical staff, the following is a little bit of my own experience:

a correct attitude, rigorous science < /p>

Road and bridge construction work is a very difficult industry, the wind and sun, but also run around, but also need to work carefully, so there is no optimistic attitude and rigorous scientific work spirit is not. Although the information and budget work is not to engage in scientific research, but also absolutely can not come to half sloppy, "not even a fraction of a mile" is used as a metaphor for the work of the information, and "a son of a mistake, the whole disk are down the rope" and just used to describe the budget work.

Two, careful to deduce, serious proof

In the information and budget work, very much in need of "careful to deduce, serious proof" of the spirit of work, because it is not only the style of work of the problem, but also directly related to the quality of work. In the preparation of information and budget, must carefully review the map, the map on the wrong place to the design, supervision units to put forward in a timely manner. Before preparing the budget, it is necessary to utilize the data given in the drawings and apply various formulas to verify them, and also to repeat the calculations using different calculation methods (e.g., positive and negative calculations, etc.) to ensure that everything is correct. In preparation for the preparation of information, we must first revisit the drawings to see whether the design drawings of the local construction process has special requirements, or there is no conflict with the current construction process, if there is a conflict, it will take the "strict but not lenient" principle of treatment, and promptly make a written report to the director. In the process, I not only deepened my understanding of the original knowledge of the study, but also on the previous books did not contact or contact the knowledge of the depth of the further understanding.

Third, strict and careful, well-considered

In the work, consider the problem must be strict, thoughtful, the design of the place is not mentioned, to be considered in conjunction with the current specifications and the actual situation, to see if there are omissions and errors. The following is a brief description of the various tasks:

Upon receipt of the drawings, you should immediately carry out the review of the drawings. If the drawings are more, can be divided, each professional designated by the person responsible for, and by the person who calculates the amount of work, the person who reviews the elevation, the person who reviews the coordinates, to achieve a clear division of labor, but also cross, each of which is carried out by two or more than the second review of the work, found that the problem should be recorded in a timely manner, to be summed up, and handed over to the person in charge of the technology to further review and then organize the design of the report to the supervisory unit. Review of the map is mainly carried out as follows:

(1), the elevation of the review, according to each structure or structural layer of the height difference, layer thickness, longitudinal slope, horizontal slope, slope, etc. to back-calculate the elevation of each point, to see whether it matches with the map provided. Such as from the beginning of the road to the end of the road is consistent.

(2), the amount of work to review, generally in the drawings after the size of the review is correct, according to the drawings of the size (or corrected size of the structure) for the calculation, shall not copy the drawings of the number of works in the table of the data, the calculation should take into account a variety of practical situations.

Fourth, the internal organization

In the data organization should pay attention to the comprehensiveness, authenticity and timeliness of the data, in addition to pay attention to the design drawings and the owner, supervision of other special requirements. For example:

① Some projects are particularly strict safety requirements, then the completion of the data in the organization of the daily pre-shift safety activities, the construction of various projects, safety and technical briefings, the project's safety system and the management process of this part of the data to be particularly well organized.

② Some projects due to various reasons, change the project more, then the change of information, such as photographs, pictures, engineering negotiation records, on-site measurements, measurement records, the original design drawings, change drawings, etc. must be organized.

③ All hidden works acceptance records must be timely and complete, not missing, or may bring serious consequences to the completion of the acceptance.

Fifth, the budget (settlement):

When making the budget, we should pay attention to the actual situation of the company and the construction site for comprehensive consideration, in order to make the most reasonable budget. For example:

① some projects, the party specified a certain material or equipment, it is necessary to carefully investigate the situation of the material or equipment, including the supply situation and whether the price will change.

② Some projects use a material or equipment, the company is self-picked materials, lower cost, then you can use a lower bidding, and vice versa, can not be.