Construction standard of rural sewage reconstruction in Pinggu District

Rural sewage reconstruction and construction standards in Pinggu District include the following points:

1. The construction area shall meet the requirements of the station area, and the general construction area shall be twice that of the station area, and the soil piling site and mechanical access site shall be considered.

2. The road into the construction area should meet the requirements of equipment handling. Generally speaking, the width of the road should be greater than the width of the truck compartment. At the same time, we should consider the turning angle of the truck and avoid the low-altitude wires above the road.

3. The safe distance between the station area and the surrounding houses is greater than or equal to 15m, so as to avoid affecting the building foundation.

4. Avoid construction in low-lying areas or ponds and swamps to prevent equipment from being flooded.

5. It is strictly forbidden that the elevation of the sewage outlet of the comprehensive sewage discharge equipment is lower than the highest water level of the discharged water body in flood season to prevent backflow.

6. The station area should be convenient for the operation of mechanical equipment, such as cranes and excavators.

7. Avoid passing through high-voltage lines.

8. Understand the water level and soil quality of the selected site without the geological survey report.

9. Generally speaking, the requirement of power supply connection is that the connection point between the upper power supply and the equipment is not more than 15m.

10. After the location of integrated sewage treatment equipment is selected, the location confirmation form must be filled in and confirmed by Party A. ..

Due to different local policies and management requirements, the specific standards may change. It is recommended to consult relevant departments for specific conditions.