There are 34 trunk lines, 22 branch lines and 57 contact lines in the pipe. The total extension length of the pipeline is 17,173 kilometers, of which 10,882.3 kilometers are main lines, 20,740 sets of turnouts, 4,994 bridges, 23,509 extension meters, 238 tunnels, 129,934 extension meters. Locomotives are equipped with 1710 sets, including 1545 sets of internal combustion locomotives, 162 sets of electric locomotives and 3 sets of steam locomotives. Communication and signaling equipment: 1,326 kilometers of automatic blocking, 6,949.9 kilometers of semi-automatic blocking. Electrical centralized stations 691, non-centralized stations 129, computer interlocking stations and yards 47. At the end of the year, the original value of fixed assets 64.213.2 billion yuan, net value of 40.247 billion yuan.
There are 853 stations under the bureau, including 5 special stations (Changchun, Shenyang, Shenyang North, Shenyang South, Shenyang West, Shanhaiguan), 26 first-class stations, 38 second-class stations, 143 third-class stations, 564 fourth-class stations and 77 fifth-class stations. There are 68 grass-roots transportation stations within the Bureau's jurisdiction, including 15 independent stations, 15 vehicle sections (Shenyang Vehicle Section, Anshan Vehicle Section, Benxi Vehicle Section, Changchun Vehicle Section, Baicheng Vehicle Section, Dalian Vehicle Section, Jinzhou Vehicle Section, Fuxin Vehicle Section, Jilin Vehicle Section, Yanji Vehicle Section, Meihuokou Vehicle Section, Tonghua Vehicle Section, Tongliao Vehicle Section, Chifeng Vehicle Section, Baining Husuo Vehicle Section), and 2 passenger sections (Shenyang Passenger Section, Shenyang Passenger Section, Shenyang West, Shanhguan, Shenyang West, Shenyang West, Shanhguan, Shenyang West, Shanhguan, Shenyang West, Shanhguan). (Shenyang Passenger Transportation Department, Changchun Passenger Transportation Department), five mechanical sections (Shenyang Mechanical Section (Shen Bureau of Shen Section) (passenger mechanical section), Sujiatun Mechanical Section (Shen Bureau of Su Section), Jinzhou Mechanical Section (Shen Bureau of Jin Section), Jilin Mechanical Section (Shen Bureau of Ji Section), Tongliao Mechanical Section (Shen Bureau of Liaoduan)), 15 engineering sections (Shenyang Public Works, Liaoyang Public Works, Benxi Public Works, Jinzhou Public Works, Shanhai Pass Public Works, Fuxin Public Works, Jilin Public Works, Fuxin Public Works, Fuxin Public Works, Fuxin Public Works, Fuxin Public Works, Fuxin Public Works, Fuxin Public Works, Fuxin Public Works, Fuxin Public Works, Fuxin Public Works, Fuxin Public Works). Section, Jilin Engineering Section, Jiaohe Engineering Section, Tumen Engineering Section, Changchun Engineering Section, Baicheng Engineering Section, Siping Engineering Section, Dalian Engineering Section, Tongliao Engineering Section, Chifeng Engineering Section), five electric section (Shenyang Electricity Section, Changchun Electricity Section, Jinzhou Electricity Section, Jilin Electricity Section, Tongliao Electricity Section), four power supply section (Shenyang Electricity Supply Section, Changchun Electricity Supply Section, Jilin Electricity Supply Section, Jinzhou Electricity Supply Section), vehicle sections 6 (Shenyang Vehicle Section (Shen Bureau of Shen vehicles) (passenger vehicle section), Sujiatun Vehicle Section (Shen Bureau of Su vehicles), Changchun Vehicle Section (Shen Bureau of vehicles) (passenger vehicle section), Jinzhou Vehicle Section (Shen Bureau of Jin vehicles), Jilin Vehicle Section (Shen Bureau of vehicles), Tongliao Vehicle Section (Shen Bureau of Liao vehicles)).
The total number of employees 336,888, of which, 334,376 permanent employees, 2512 temporary employees, 305,921 on-the-job employees (of which, 71,124 female employees), 30,967 non-employed workers. Among the inactive employees, 12,553 were internally retired. The total number of cadres is 67,958 (47,022 professional and technical cadres, 5,932 ethnic minority cadres and 23,266 female cadres).
The administrative organization of the road bureau has 22 divisions and offices, 6 divisions and offices outside the quota, 29 subordinate units and 4 academic associations. Bureau of labor union set up 4 departments. Bureau of Youth League Committee does not have a department. Under the 7 offices (Changchun, Shenyang, Jinzhou, Dalian, Jilin, Tonghua, Tongliao).
Road office is located in the Heping District, Shenyang City, Taiyuan North Street, No. 4, ZIP code 110001. duty road 031-21060, city 024-62021060.
March 18, 2005, the Ministry of Railways issued the "abolition of the country's road bureaus set up under the decision of the sub-bureaus". Shenyang Railway Bureau under the seven railroad branch: Shenyang Railway Bureau, Jinzhou Railway Bureau, Dalian Railway Bureau, Changchun Railway Bureau, Jilin Railway Bureau, Tonghua Railway Bureau, Tongliao Railway Bureau was abolished, respectively, renamed: Shenyang Railway Office, Jinzhou Railway Office, Dalian Railway Office, Changchun Railway Office, Jilin Railway Office, Tonghua Railway Office, Tongliao Railway Office. Shanghai Railway Bureau business mileage of 4129.5 kilometers (including temporary business line?152.8?kilometers), the extension length of 10002.5 kilometers, including cross-provincial and municipal lines, such as Beijing-Kowloon, Zhejiang-Ganzhou, Jinpu line, Fu clip line, Ningwu line, Anhui-Ganzhou line, Shanghai-Nanjing, Longhai, Shanghai-Hangzhou, Changniu line, Xuanhang line and 11 other lines, as well as qingfu, huainan, jinqian and other provincial lines. The operating mileage above double lines is 1790.6 kilometers, accounting for 43.4% of the operating mileage of the whole bureau. The length of automatic and semi-automatic blocking lines is 4374.3 kilometers. Electrified railroad 892.3 kilometers. [edit paragraph] Main technical equipment 503 stations, including 6 special class stations, 27 first class stations and 42 second class stations. There are 1,539 locomotives, including 22 steam locomotives, 1,309 internal combustion locomotives and 208 electric locomotives, accounting for 1.4%, 85.1% and 13.5% of the total number of locomotives. There are 3,798 passenger cars, including 139 soft-seat cars, 1,696 hard-seat cars, 236 soft sleepers and 1,157 hard sleepers. Among the allotted coaches, there are 196 double-decker coaches, including 45 double-decker soft-seater coaches and 151 double-decker hard-seater coaches; and 2,310 air-conditioned coaches.
The pipe joint venture railroad companies develop rapidly, to the end of the year, Hejiu, Jinwen, Xiaoyong, Xinchang, Hening, Hewu six joint venture railroad companies, total business mileage of 1,880.8 kilometers, the extension of the length of 2,654.4 kilometers. [Edit] Operation In 2002, Shanghai Bureau pushed forward all the work as a whole and formed a benign development trend.
1. Transportation operation. Annual transportation revenue of 17.18 billion yuan, an increase of 7.3%; converted turnover of 188.8 billion tons of kilometers, an increase of 7.1%, of which 101 billion tons of through cargo turnover completed, an increase of 8.7%; passenger sent 164.64 million people, an increase of 6.1%? The volume of goods sent was 154.58 million tons, an increase of 7.6% year-on-year; the operating income of transportation was 19.46 billion yuan, and the transportation profit was 56.79 million yuan. Diversified operation completed operating income of 7.29 billion yuan, realizing profits of 370 million yuan, an increase of 18.8% and 10.1% respectively. Realize the annual asset management responsibility system target.
2. Transportation safety. The company implemented the Work Safety Law, pushed forward the work of safety "standardized management, strong foundation and standard", improved and implemented the system of responsibility for safety management at each level, highlighted the safety focus of buses and speed sections, carried out safety inspections and special rectification, eliminated a number of hidden safety hazards, and promoted the implementation of safety measures. The annual investment in safety facilities amounted to 210 million yuan, enhancing the quality of major transportation equipment and safety monitoring capacity. Promoting the construction of Shanghai-Nanjing standardized line, the first to become the national railroad speed up to standardized demonstration line. By the end of the year, the Bureau eliminated the major accidents and passenger car liability accidents and dangerous and above accidents, the general accidents decreased by 38% year-on-year, to realize the year of traffic safety.
3. Reform management. Passenger transport companies to achieve results in the pilot reform, the role of the main body of responsibility for passenger transport operations and capacity, the optimal allocation of labor resources has been initially reflected. More than by the enterprise consolidation of "three points open" results, building a new pattern of operation has made new progress, Shanghai Railway Economic Development Company Limited, Cultural Development Company Limited, Real Estate Company Limited listed operation, the holiday train company to complete the restructuring of the equity, Longmen Hotel through foreign capital optimization of the shareholding structure. Integration and optimization of educational resources, and 3 primary and secondary schools transferred to the territory, 5 withdrawn and merged. Completion of the Bureau of sanitary and epidemiological supervision system reform, start the monetization of housing allocation, following the Shanghai area after the Hangzhou branch of the implementation of the local management of medical insurance. Deepen the "three systems" reform, formulated and adopted by the Employee Council to implement the "Shanghai Railway Bureau employees serious violations of rules and discipline to terminate the labor contract of a number of provisions", standardize the professional behavior of cadres and workers. The Bureau's transportation industry reduced its workforce by 1,666 people, and the total number of employees declined for 11 consecutive years.
The Management of Playing Comparative Advantages of Railway Short-distance Passenger Transportation won the first prize of National Management Innovation Achievement, and 46 achievements were honored as excellent quality management achievement awards at the ministerial level or above. At the same time, to promote the standardization work, the bureau and sub-bureau organs to complete the standardization pilot, the whole bureau operation grass-roots units standardization to carry out the surface of 53%.
4. Capital construction. The year completed infrastructure investment of 2.81 billion yuan, change investment of 1.13 billion yuan. Xiaoyong double line opened at the beginning of the year, the new long line paved at the end of the year, Meikan line through the national acceptance, Ningqi line, Gan Long line construction progress exceeded the expected target, Nanjing, Fuzhou station station renovation project started construction, Shanghai South Station to complete the preparations for the start of construction. Jinpu line K831 project, Fuyang increase the number of bus line down a number of expansion projects completed and put into operation. Xuanyang-Hangzhou double line, Zhegan electrification, Pudong Railway, Ningbo-Taizhou-Wenzhou Railway, Wenfu Railway, Fuxia Railway, and Ningxi Railway (Hefei - Nanjing section) and other projects to make progress in the preliminary work.
5. Science and technology education. The TMIS system was basically completed, the Shanghai-Nanjing line traffic safety monitoring system has achieved results in the construction of passenger ticket sales and booking system has been upgraded and improved. The level of rolling stock, engineering and electrical equipment and the degree of mechanization of construction work were further improved, and the seamless lines across the inter-area set a new record for Chinese enterprises. In accordance with the Ministry of Railways "two years and 10 days" training requirements, the development of the "Road Bureau post standard work implementation views", the annual training of 67,000 people, the organization of other standardized training of 4,159 people, the Shanghai-Nanjing line "three members of the two chiefs," the education, skills up to the standard rate of 100%.
6. Staff life. Around the Bureau of Employee Council put forward practical projects, invested 14 million yuan, built 40 property district, completed 9073 households of workers residential transfer power (water) transformation and Nanjing East water capacity. Investment of 4.75 million yuan for the construction of apartments and facilities remodeling. Invested more than 32 million yuan to remodel Shanghai Tianjin Road, Nanjing Xing'an Road and other six bureaus and sub-bureaus where the single dormitory. Invested 5.8 million yuan for life line "four small" facilities repair. Arranged education investment of 20.8 million yuan, the purchase of educational equipment, improve school conditions, complete the Bureau of Party School relocation project. Invested 2 million yuan to establish the Employee Education Guarantee Fund. Invested 11.93 million yuan for the Bureau of Central Epidemic Prevention Station experimental building and other medical and health facilities. Carrying out the activities of helping the poor and sending warmth, amounting to 21.52 million yuan. The whole bureau subsidized 1,630 people with 4.68 million yuan from the Friends of Major Diseases Fund. Solving problems related to retirees after the attribution of old-age insurance to the localities, and spending 58.2 million yuan on subsidies and assistance for retirees. Invested 120 million yuan for one-time supplemental pension insurance for the whole bureau's employees. Employee payroll increased 11.9 percent from 2001.
The enterprise ranked ninety-fourth among the top 500 Chinese enterprises in 2006 and one hundred and eighteenth among the top 500 Chinese enterprises in 2007, jointly issued by China Enterprise Confederation and China Entrepreneurs Association.