Precision equipment relocation, some of the equipment needed, personnel arrangements and some protective measures.

Precision equipment relocation matters of note

1 as a huge volume, precision equipment handling, in the development of the program must be careful, Suan lifting and loading company in the handling of large machinery and equipment for customers, usually for different precision equipment to set up a special handling program five precautions:

1, the equipment, if the size of the body is more standard, you can directly Load and carry, but if the body type is more special equipment loading to be flexible, there are a few points to note, first of all, the point of gravity to be fixed, easy to bump into the place must take shock-absorbing measures to prevent bumping.

2, if the handling of equipment is a precision instruments, first of all, we must be clear about what are the most fragile parts of the instrument, we must do special care, the general use of air cushion film, blankets and other shock-absorbing measures, in the use of lifting equipment to carry the time to be treated with care.

3, in the poor balance of the equipment, it is best to add load-bearing balance base to stabilize the equipment to prevent tilt bump.

Protection measures

1, for precision equipment or parts, lifting and handling should be particularly careful. In lifting or handling precision equipment or parts, to take appropriate measures to prevent them in the lifting and handling process of equipment or parts that do not allow the deformation or strong vibration. For parts with high smoothness, prevent their surfaces from being scratched.

2, Suzhou Industrial Park, a plant compressor plant has a turbocompressor needs to be overhauled, set up over the plant overhead bridge crane for overhaul use