The measures referred to in the construction of construction waste and engineering residue (hereinafter collectively referred to as construction waste) disposal refers to the construction of construction projects, construction units, new construction, alteration, expansion and demolition of various types of buildings, structures, pipeline networks, etc., the process of sludge, residual residue and other wastes generated by the discharge, transit, transportation, backfill and digestion activities. Article City Urban Management and Law Enforcement Bureau is responsible for the organization and implementation of these measures, the day-to-day management of municipal construction waste engineering residue management office is responsible for. Planning, construction, land, public security, transportation, environmental protection and other administrative departments, as well as the District Urban Management and Law Enforcement Bureaus, should be in accordance with their respective responsibilities to cooperate in the management of construction waste disposal. Article 4 the construction of construction projects or construction units to dispose of construction waste, should be entrusted with the construction of garbage quasi transport qualification of the enterprise transportation. Enterprises and individuals who have not obtained the qualification of permitted transportation of construction waste shall not engage in construction waste transportation activities. Article 5 application to engage in the transportation of construction waste, shall have the following conditions:
(a) with the residue transportation enterprise legal personality;
(b) enterprise registered capital of not less than RMB 10 million yuan;
(c) to obtain by the road transport management agency issued by the road general cargo transportation business license;
(d) transport vehicle total Load capacity of not less than 400 tons, not less than two motorized cleaning vehicles, flushing vehicles not less than one;
(e) transport vehicles registered in the city license plate, in good condition, the model, equipment, etc. in line with the requirements, and the installation of GPS positioning system;
(f) with the size of the vehicle with the special parking space;
(vii) have a sound production safety management system.
Enterprises with the above conditions should apply to the Municipal Urban Management and Law Enforcement Bureau and submit the appropriate materials. Municipal Urban Management and Law Enforcement Bureau shall, within seven days from the date of acceptance, make a decision on whether to approve, to be approved, to the applicant enterprise to issue construction waste transportation permit.
Municipal Urban Management and Law Enforcement Bureau shall issue construction waste transportation license to the public. Article 6 to obtain construction waste transport qualification of the residue transport enterprises need to transport construction waste, should be signed with the construction or construction unit of construction waste (residue) contract. And with the contract to the municipal urban management and law enforcement bureau to apply for single-vehicle transportation card, signed the responsibility of the city's environmental health.
Construction waste transportation card issued according to the number of vehicles transporting construction waste, a car a card. Construction waste transportation card should record the following matters:
(a) construction waste permit number;
(b) the type and quantity of construction waste;
(c) the type and number of the transportation vehicle;
(d) the route and time of the transportation vehicle;
(e) the designated place for unloading construction waste.
The contents of the preceding paragraph (d) shall be approved by the Municipal Urban Management and Law Enforcement Bureau in conjunction with the Municipal Public Security and Traffic Management Department. Article 7 construction sites should be set up to regulate the net vehicle out of the facilities, transportation of slag should be rinsed before the vehicle leaves the construction site, the net vehicle out of the site.
Transportation of construction waste vehicles should be regularly cleaned and maintained, keep the vehicle in good condition. Meet the requirements for the transportation of construction waste. Encourage the promotion of the use of large transportation vehicles that meet the requirements, limit and gradually eliminate small and medium-sized, old and worn-out transportation vehicles.
Transportation vehicles should be loaded with the appropriate amount of construction waste transportation card with the car, and according to the designated time, route, no leakage, spillage during transportation. Article 8 The project construction or construction unit shall pay the urban construction waste disposal fee in accordance with the approved standards of the price department. Article 9 The construction waste receiving yard shall be set up by the municipal people's government in accordance with the principle of proximity and applicability in accordance with the urban planning and relevant regulations, and shall be managed by the Municipal Bureau of Urban Management and Law Enforcement.
No unit or individual shall set up construction waste receiving yard without authorization. Article 10 of the construction waste receiving site should be equipped with appropriate grinding, dust, lighting and other machinery and equipment, drainage, fire and other facilities, the entrance and exit roads should be hardened and set up standardized net car out of the facilities. Article 11 construction sites, planned development sites need to accept construction waste backfill pits, depressions, shall apply to the Municipal Urban Management and Law Enforcement Bureau, by the Municipal Urban Management and Law Enforcement Bureau of unified arrangements for transfer. Article XII does not obtain the construction waste quasi transport qualification units or individuals engaged in the transportation of construction waste, by the Municipal Urban Management and Law Enforcement Bureau ordered to make corrections, and impose a fine of 30,000 yuan. Article XIII violation of the provisions of Article 7, paragraph 1, the transportation of dirt vehicles leave the construction site without rinsing the vehicle, by the Municipal Urban Management and Law Enforcement Bureau ordered the construction enterprises to correct, clean the road surface within a specified period of time, according to the fine of 2,000 yuan for each vehicle, and can be temporarily detained illegal transportation vehicles. Article XIV violation of the provisions of Article 8 of these measures, by the Municipal Urban Management and Law Enforcement Bureau ordered the construction unit or construction unit to make up for the payment, and according to the project floor area of 20 yuan per square meter to be punished, the fine shall not exceed a maximum of 30,000 yuan.