In today's society, we gradually realize the importance of the agreement, signing the agreement can solve the disputes in real life. I think many people are worried about how to write a good agreement, the following is my carefully organized air conditioning repair safety agreement, welcome to read and collect.
air conditioning maintenance safety agreement 1Party A: ___ pharmaceutical factory.
Party B:
A and B on the air conditioning equipment maintenance matters by equal consultation reached the following agreement:
A, Party A's responsibilities and obligations:
1, Party A will be the old factory air conditioning unit to the B side of the maintenance. Fault for the condenser leakage plus fluorine.
2, Party A agreed to pay Party B repair fee of three thousand yuan (3000. 00 yuan) whole (including material costs). When the repair work is completed and delivered for use, we will pay 2,000 yuan in advance, and the remaining balance will be paid in one week at the end of the three-month warranty period.
3, Party B in the repair and construction process, Party A should provide the necessary convenience, such as sites, water and electricity, tools and equipment in and out of the plant. Welding Party A lends welding machine to Party B to use.
4, equipment maintenance is completed and delivered to use, Party A to ensure that the equipment is strictly in accordance with the operating procedures for the use of the condenser shall not be cut off. If Party A violates the operation of the use of faults caused by Party B warranty.
5, Party A agreed to use the equipment this year after the completion of the recovery of the unit by Party B residual fluorine.
Second, Party B's responsibilities and obligations:
1, Party B is responsible for the air conditioning and refrigeration unit before May 31 to repair and delivery. And warranty three months that is to the end of August.
2, after the delivery of the equipment, such as equipment failure in the process of operation Party A repair Party B to ensure that within twenty-four hours to check the maintenance.
3, Party B to ensure construction safety, in the construction process, if not comply with safety regulations resulting in safety accidents by Party B is responsible for.
4, in the use of equipment, Party B to ensure that the inspection twice a month.
Party A's representative signature and seal:
Party B's representative signature and seal:
20__Year__Month__Day
Air Conditioning Maintenance Safety Agreement 2Party A:
Party B:__Refrigeration Engineering Department
A and B on the air conditioning repair and maintenance matters, the following agreement was reached after equal consultation:
First, Party A Party A will now use all the room air conditioner **** units, (see list) to Party B repair and maintenance, the period of one year. Party A agreed to an average of $ per unit, a total of RMB (capital) yuan to Party B to pay maintenance fees.
Second, the party paid the maintenance fee includes air conditioning cleaning, door-to-door service fee, inspection fee, repair fee, and in addition to the large parts of the compressor outside the material costs.
Third, the following costs are not included in the scope of the negotiated payment of this agreement, Party A should negotiate a separate payment:
1, such as compressor damage, the cost of purchasing compressor.
2, air conditioning installation `demolition and removal of construction costs and materials.
3, air conditioning power supply road failure.
4, Party A attached to the agreement to provide a list of air conditioning maintenance costs and other labor costs.
Fourth, Party B service commitment.
1, before the peak of summer use of all room air conditioners for a cleaning and maintenance.
2, in the winter and summer seasons of all in-use room air conditioner effect of a patrol, found that the problem is resolved in a timely manner.
3, received a failure to declare the phone, Party B should be in Si hours to deal with.
4, Party B construction process to ensure that self-study to comply with safety regulations, Party B construction workers violate the construction of accidental injuries caused by their own responsibility.
5, Party B construction personnel to ensure that no damage to Party A site property, and to ensure that the construction site health.
V. Party A's obligations:
1. Party A shall provide Party B with water, electricity and site convenience for the construction process. Construction time to give full cooperation. Party B shall not be obstructed construction without reason.
2, Party A shall provide convenient access for Party B's construction personnel and vehicles.
3, Party A shall pay in time according to the requirements of the agreement, the departments shall not make things difficult for no reason.
Sixth, the payment method:
1, the agreement repair and maintenance in the agreement after the entry into force of a week's time, the first 70%, that is, RMB yuan. The balance is paid within one week after the expiration of the agreement.
2, the agreement outside the cost of Party A should be paid within one month after the completion of construction.
3. If Party A delays the payment, it should pay late fee to Party B according to the daily 2 of the payable amount.
VII, this agreement is not exhaustive matters to be resolved through consultation between the two sides, consultation can not be appealed to the People's Court of the territorial decision.
VIII, this agreement in duplicate, A and B each party to sign a copy. Representatives of the two sides signed and sealed after the entry into force.
Signature of the representative of the party A (seal)
Signature of the representative of the party B (seal)
20__ year ___ month ___ day
Air conditioning maintenance safety agreement 3Party A:
Party B:
(Party A) operating the sale of XX brand air conditioning commodities, is now entrusted to the party B installation, in order to long-term friendly cooperation, the two sides should comply with the The following terms:
First, Party B has the appropriate technical qualifications, professional installation team, familiar with the principles of refrigeration technology, skilled installation and maintenance of refrigeration air conditioners, the ability to have the appropriate tools and equipment.
Second, party B door-to-door installation of air conditioning, comply with the brand manufacturer's implementation of standards, so that the instrument is generous, neatly dressed, shall not be in the process of installation to the user to eat, take, and ask for, if it causes a complaint, party A based on the manufacturers of the corresponding penalty standard will be punished party B.
Third, Party B in the installation is completed, in a timely manner to provide Party A installation card, so that Party A to the manufacturer to report orders.
Fourth, the air-conditioning installation process due to their own quality problems can not be installed or can not be used properly Party A should be replaced in a timely manner, such as improper installation and operation of the air-conditioning due to Party B can not be used properly, Party B should be within 24 hours of the door to the maintenance until troubleshooting. Party B should comply with the manufacturer's installation warranty xx months standard, during this period of air-conditioning failure caused by the installation, Party B should be timely home maintenance.
Fifth, Party B should strictly implement the safety standards, the installation process due to improper operation caused by their own safety issues, Party B is responsible for their own.
Six, Party B's installation of Party B's timely settlement of costs on a monthly basis, shall not be in arrears.
VII, outstanding matters:
Party A: (seal)
Party B: (seal)
Signature of the representative:
Signature of the representative:
Date:
Air conditioning maintenance safety agreement 4Commissioned by: (referred to as Party A)
Construction: (referred to as Party B)
In accordance with the requirements for the operation of air conditioning equipment, to ensure that air conditioning equipment operation. Air conditioning equipment operation requirements, to ensure the quality of air conditioning repair and time, by the A, B **** the same consultation, signed this contract:
First, the project and price:
Second, the price includes the repair process of the above table does not contain the other required spare parts materials, but in the overhaul process found to have a major failure (such as removing the compressor, heat exchanger perforation, etc.) maintenance, according to the The specific faults are quoted separately. Prices are negotiated by both parties, purchased by Party A or Party B on behalf of the purchase.
Third, the technical requirements:
After repair of the host, the debugging operation, the repair parts can achieve normal refrigeration requirements.
Fourth, the rights and obligations of the commissioning party:
1, should provide the necessary ` water, electricity, nitrogen, etc. in a timely manner.
2, should actively cooperate with Party B's construction.
3, in the construction process, the commissioning party can always monitor the construction quality of the construction party.
Fifth, the rights and obligations of the construction party:
1, according to the quality, on schedule to complete the project.
2, Party B into the construction site of Party A, should comply with all the rules and regulations of the Party.
3, responsible for the relevant procedures and costs before entering the site.
4, the maintenance of their own tools, cleaning potion and maintenance of the materials required.
Sixth, the construction period:
Since the signing of this agreement within 10 days to complete all the works.
Seven, the price of the project and payment terms:
1, the project lump sum price: eighty thousand five hundred and seventy-seven dollars (¥ 80517. 00).
2, 3 days after the signing of the contract, Party A to pay Party B 30% of the project, that is: two hundred thousand four hundred thousand one hundred and fifteen thousand five hundred and fifty-five yuan (¥ 24,155.00); the completion of the project by the Party A acceptance of the project within 10 days of the Party A to Party B to pay 60% of the project, that is: eighty thousand eight hundred and thirty-one hundred and one hundred and one hundred and fifty-five yuan (¥ 48,310.00); the balance (10% of the project) eighty thousand zero fifty two yuan (¥ 80,520.00) Yuan (¥ 8052.00) in the warranty period after a one-time payment.
VIII, quality assurance period of six months, from the date of acceptance of the project to the use of Party A calculated within six months, such as the occurrence of maintenance due to Party B part of the quality problem (except for Party A's irregularities caused by the operation), by the Party B rework, all costs borne by the Party B.
Nine, liability accidents:
In the construction of all safety accidents caused by Party B, all by Party B is responsible for. Damage to Party A's equipment and facilities, Party B will pay the price.
X. Liability for breach of contract:
The two sides to solve the problem by friendly negotiation, such as negotiation fails, according to the relevant provisions of the State "Contract Law".
xi. Matters not covered by the two sides to resolve through friendly consultation.
XII, this agreement in quadruplicate, Party A executes three, Party B executes one, the agreement takes effect from the date of signature.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ day _________ year ____ month ____ Day
Air conditioning maintenance safety agreement 5Party A:
Party B:
According to the "Chinese People's **** and the State Contract Law" and other relevant laws and regulations expressly provided for, on the basis of equality, voluntariness and consensus, on the maintenance of air conditioners by Party B, Party A and Party B have reached the following agreement:
A. Party B is responsible for the maintenance of the office of Party A 30 units of air conditioners (hanging units).
I. Party B is responsible for the maintenance of Party A's office 30 air conditioners (hanging).
Second, Party B's maintenance content is:
1, cleaning air conditioning;
2, add refrigeration additives;
3, configure 10 air conditioning remote control;
4, to ensure that the air conditioning normal work of other maintenance content.
Third, Party B guarantees to deliver the repaired air conditioner to Party A as it is before March 28, 20__, and within 1 year from the date of delivery, when the air conditioner malfunctions again, Party B shall timely and free of charge warranty.
Fourth, Party B must ensure that the air conditioning disassembled intact, bear the maintenance period to keep the disassembled air conditioning theft and loss of responsibility, to ensure that the maintenance of the installation of fixed.
Fifth, without the consent of the Party shall not subcontract the maintenance work to a third party, and shall not be replaced without authorization do not need to replace the air-conditioning parts. If you do need to replace, you should notify us and ensure that the replacement parts are consistent with the original parts or match the functionality and performance of the whole machine.
Six, Party A acceptance of the repair of air conditioning qualified, a one-time payment of Party B air conditioning repair costs. The cost is based on the party B repair work content accounting (including taxes). Among them:
1, air conditioning cleaning and maintenance and add refrigerant 120 yuan / unit;
2, configure universal air conditioning remote control 30 yuan / a.
VII, this contract in the fulfillment of the dispute, the two sides should be negotiated to solve the problem; consultation fails, either party can file a lawsuit to the People's Court.
VIII, this contract is not exhaustive, by the contract parties **** with the consultation, to make additional provisions, additional provisions and the provisions of the same legal effect.
IX, this contract in duplicate, A, B, each party to sign a copy, from the date of signature and seal.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ day _________ year ____ month ____ Day
air conditioning maintenance safety agreement 6Party A: ___ Science and Trade Limited
Party B: by the two sides of the agreement ___ Science and Trade Limited
(Party A) operating the sale of _______ brand air-conditioning commodities, is now entrusted to the installation of Party B. In order to achieve long-term friendly cooperation, the two sides shall comply with the following provisions:
First, Party B has the appropriate technical Proof of qualification, professional installation team, familiar with the principles of refrigeration technology, with skilled installation and maintenance of refrigeration air conditioners have the ability to have the appropriate tools and equipment.
Second, Party B door-to-door installation of air conditioning, comply with the brand manufacturer's implementation of standards, so that the instrument is generous, neatly dressed, shall not be in the process of installation to the user to eat, take, and ask for money, if it causes a complaint, Party A based on the manufacturers of the corresponding penalty standards will be punished Party.
Third, Party B in the installation is completed, in a timely manner to provide Party A installation card, so that Party A to the manufacturer to report orders.
Fourth, the air-conditioning installation process due to their own quality problems can not be installed or can not be used properly Party A should be replaced in a timely manner, such as improper installation and operation of the air-conditioning due to Party B can not be used properly, Party B should be within 24 hours of the door to the maintenance until troubleshooting. Party B should comply with the manufacturer's installation warranty ____ standard, during this period of air conditioning failure caused by the installation, Party B should be timely door-to-door maintenance.
Fifth, Party B should strictly enforce the safety standards of operation, installation process due to improper operation caused by their own safety issues, Party B own responsibility.
Sixth, Party B's installation of Party B's timely settlement of costs on a monthly basis, shall not be in arrears.
Matters arising:
Party A: ___ Science and Trade Limited (seal)
Party B: (seal) Representative Signature:
Representative Signature:
Date: 20__ year ___ month ___
Air conditioning maintenance safety agreement 7Party A:
Responsible:
Contact Tel.
Party B:
Responsible person:
Contact number:
According to the "Contract Law of the People's Republic of China and the State of China" and other relevant laws and regulations expressly, on the basis of equality, voluntariness, and consensus, on the matter of air conditioner maintenance and repair of Party B, Party A and Party B have reached the following agreement:
I. Party B is responsible for the maintenance of future City Baby World shopping mall on the first to third floor of the central air conditioning and exhaust air supply system;
Second, Party B's maintenance content is:
Cooling system (including the host condenser, cooling towers, cooling pipes) cleaning and maintenance; refrigeration system (including the host evaporator, boiler, refrigeration pipes) cleaning and maintenance; fan coil cleaning and maintenance; air conditioning system maintenance for one year.
Third, Party B guaranteed to complete the first maintenance to ensure normal operation before May 20, 20__, maintenance of air conditioning such as the number of delivery date of one year, the air conditioning failure again, Party B should be timely and free warranty.
Fourth, Party B must ensure that the air conditioning disassembled intact, bear the maintenance period to keep the disassembled air conditioning accessories to ensure that the maintenance of the installation of fixed. If the accessories are lost, party B is responsible. Mall air conditioning problems, Party B is responsible for immediate maintenance, major accidents, by Party B itself.
Fifth, without the consent of Party A shall not be subcontracted to a third party, and shall not be replaced without authorization do not need to replace the air-conditioning parts. If it is necessary to replace, should be party A, and to ensure that the replacement parts and original parts of the same or with the machine function performance match.
Six, the payment method and amount: after the signing of this contract, Party A's central air conditioning first cleaning and acceptance, pay Party B air conditioning maintenance fee of 5,000 yuan; the second time in the winter maintenance and acceptance of payment of 4,000 yuan; the third payment at the end of the month when the contract expires, pay the remaining 3,000 yuan. Total total cost: 12000. 00 yuan (capital: 12,000 yuan) Note: If the equipment (host, boiler, cooling tower, fan coil, etc.) must be replaced parts, or repair the motor, the cost will be borne by Party A. The air conditioning consumables will be paid by Party B itself. Cleaning air conditioning supplies by Party B is responsible for.
VII, this contract in the fulfillment of the dispute, the two sides should consult to resolve; consultation fails, either party can file a lawsuit to the People's Court.
VIII, this contract is not exhaustive, by the contract parties *** with the coordination, to make additional provisions, additional provisions and the provisions have the same legal effect.
IX, this contract in duplicate, A, B, each party to sign a copy, from the date of signature and seal.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ day _________ year ____ month ____ Day