Based on the development of equipment repair and maintenance system, it is necessary to target a reasonable plan to ensure that various personnel and various manufacturers to effectively maintain it. For some easily damaged equipment and components, based on the relevant provisions and instructions, within a reasonable time for its maintenance. For some of the more critical mechanical failures, manufacturers and technicians need to communicate and fill in the information in accordance with the relevant requirements, to promote the implementation of equipment maintenance and repair work, so as to promote the improvement of equipment utilization efficiency. The staff of each position also needs to record the work situation, and analyze in detail all aspects of equipment use time, content and power. In different seasons, the use of equipment also needs to be to the point. For example: high temperature environment, to avoid equipment temperature is too high; low temperature environment, to prevent the equipment from freezing. In winter, winter oil can be used to ensure that the stable operation of the equipment can be realized under any conditions [1].
(II) Improvement of the fixed repair and inspection system
Promoting the perfection of the fixed repair and inspection system needs to be improved in three aspects. First of all, the need to promote the comprehensive development of the fixed repair system, and during the construction of the supervision group, to ensure the formation of management organization, to promote the system is more perfect, in the case, not only to promote the safe implementation of the work, but also to complete the effective development of the work. Then, promote the implementation of organizational education and training, during which some experts and celebrities can be hired to explain the relevant knowledge, to master the relevant knowledge of equipment operation and maintenance, and the formation of a comprehensive understanding of the work to promote the effective completion of the work. Finally, the development of the implementation of the program, the program is mainly based on the steps of the entire work, the progress of the work is arranged, the various departments to carry out a reasonable setup, to ensure that the content of the preparation of a more complete.
(C) strengthen the management of spare parts
The management of spare parts can maintain the quality of equipment and reduce the cost of use. First of all, to develop a file management system for spare parts. Before the procurement of mechanical equipment, the relevant departments need to study the equipment drawings and related information, and check and verify the quantity present according to the use of the enterprise. When the equipment is put into use, it is also necessary to study the type of equipment, working environment, service life, and adjust the equipment during its use in accordance with the relevant provisions to promote the dynamic development of management work. Then, the implementation of program management and contract management of equipment to promote the rational use of equipment spare parts. Based on a certain period of use and safe operation, to reduce the number of equipment purchases and storage, reduce the use of funds. Not only that, but also according to the enterprise in different periods of implementation of the plan, the actual production situation to supervise, promote the consumption of equipment and service life is more clear. Finally, the quality of spare parts for strict control, maintenance of the overall operation of the equipment, the enterprise on the operation of the equipment and spare parts management process put forward higher requirements, the staff also need to master the relevant technology and laws and regulations, to ensure that the spare parts use during the period of time to obtain a strong ability to identify.
(D) implementation of the post staff operating system
Enterprises in the management of machinery and equipment, according to the various positions, to ensure that each device has a person in charge. In the use of equipment and maintenance process, professionals can also study the use of equipment, maintenance status and maintenance. In the operation of the equipment, personal responsibility should be fully implemented. For the phenomenon of multiple operation, need to assign a special person in charge. All staff need to be licensed to promote the formation of the responsibility system, to ensure that in accordance with the relevant provisions of the realization of equipment management and operation of the work of the safe implementation.
(E) Accounting for machinery and equipment
Based on the analysis of economic accounting, accounting for machinery and equipment. During the period, it is necessary to strengthen the inspection and and accounting work of the unit and single machine, and establish a file for it to ensure that it can be effectively calculated based on the recorded information. During the period of use, professionals also need to carry out statistics and analysis of data, and in accordance with a certain period of evaluation and summary work. Not only that, but also need to be based on production indicators, comparative analysis, to ensure that on the whole can reduce costs and promote the full utilization of equipment [5].
(F) improve the investment and procurement
During the management of machinery and equipment, it is also necessary to analyze the demand for the use of equipment in the investment and procurement work, so as to reduce the phenomenon of waste of funds. Enterprises also need to be based on the fundamental significance of the promotion of management personnel, maintenance personnel professional quality and technical level of improvement, the use of centralized training work, select a number of professional, comprehensive and strong talent.