A. First-class qualification standards:
1, the enterprise in the past five years has undertaken a single capacity of 200,000 kilowatts or more thermal power units coal-fired flue gas desulfurization project, or medium-sized nuclear industrial waste treatment works, or more than 4 out of the following 6 items of engineering construction, engineering quality is qualified.
(1) Biogas digester project for poultry and animal manure with a single pool volume of more than 400 cubic meters;
(2) Anaerobic biochemical treatment pool project with a single pool volume of more than 500 cubic meters;
(3) Comprehensive treatment project for noise, hazardous gases, dust, sewage, and industrial wastes of industrial projects of medium-sized or above;
(4) Flue gas desulfurization project of industrial and Centralized heating coal-fired boiler flue gas desulphurization project;
(5) second class B grade hospital medical sewage treatment works;
(6) a single contract value of more than 10 million yuan of environmental protection projects.
2, the manager of the enterprise has more than 10 years of experience in engineering management or a senior title; chief engineer has more than 10 years of experience in construction technology management and has a senior title in this field; chief accountant has a senior accounting title.
Enterprises have the title of engineering and technical personnel not less than 40 people, of which not less than 16 people with intermediate title or above, and not less than 8 people of related professional engineering and technical personnel. Enterprises have the first-class qualification project manager not less than 5 people.
3, the enterprise registered capital of more than 10 million yuan, the enterprise net assets of more than 12 million yuan.
4, the enterprise in the past three years the highest annual project settlement income of more than 20 million yuan.
5, the enterprise has with the scope of the contracted works of construction machinery and quality testing equipment.
Two, the second level of qualification standards:
1, the enterprise in the past five years has undertaken a stand-alone capacity of 125,000 kilowatts of coal-fired flue gas desulphurization of coal-fired thermal power units or more than 12.5 kilowatts of engineering, or small-scale nuclear industry waste treatment works, or the following six items of more than four project construction, project quality is qualified.
(1) Biogas digester project for poultry and animal manure with a single pool volume of more than 200 cubic meters;
(2) Anaerobic biochemical treatment pool project with a single pool volume of more than 300 cubic meters;
(3) Comprehensive treatment project for noise, harmful gases, dust, sewage, and industrial wastes of industrial projects of more than small scale;
(4) Flue gas desulphurization project of more than 20 tons of industrial and Centralized heating coal-fired boiler flue gas desulphurization project;
(5) Class A or above grade hospital medical sewage treatment works;
(6) more than 5 million yuan of a single contract value of environmental protection projects.
2, the enterprise manager has more than 8 years of experience in engineering management or have intermediate or higher title; technical personnel with more than 8 years of experience in construction technology management and have the senior title of the specialty; financial responsible person with intermediate or higher accounting title. Enterprises have no less than five project managers above the second level of qualification.
3, the enterprise registered capital of more than 3 million yuan, the enterprise net assets of more than 3.6 million yuan.
4, the enterprise in the past three years the highest annual project settlement income of more than 10 million yuan.
5, the enterprise has with the scope of contracted works and construction machinery and quality testing equipment.
Legal basis
"Regulations on Urban Drainage and Sewage Disposal"
Article 22 Dischargers applying for a license to receive sewage discharged into the drainage network shall have the following conditions:
(a) the discharge outlet is set up in accordance with the requirements of the town's drainage and sewage treatment planning;
(b) In accordance with the relevant provisions of the state to build the appropriate pretreatment facilities and water quality, water quality testing facilities;
(C) the discharge of sewage in line with national or local provisions of the relevant emission standards;
(D) other conditions prescribed by laws and regulations.
Conforming to the conditions set forth in the preceding paragraph, the competent urban drainage department shall issue a license for the discharge of sewage into the drainage network; the specific measures shall be formulated by the State Council department in charge of housing and urban-rural construction.