Emergency plan for heat stroke prevention and cooling for working at high altitude

Emergency plan for heatstroke prevention and cooling for work at height

In the weekday study, work and life, there is no guarantee that an emergency will occur, in order to avoid more serious consequences, it is often necessary to prepare an excellent emergency plan in advance. Preparation of emergency plans need to pay attention to what problems? The following is my compilation of emergency plans for heat stroke prevention and cooling for overhead work, welcome to read, I hope you can enjoy.

Emergency plan for heatstroke prevention and cooling for overhead work1

In order to ensure the smooth construction of the project, to ensure that emergency rescue work can be rapid and effective when emergencies occur in the construction, maximize the protection of the lives of enterprise workers, property safety, according to the characteristics of the project, this plan is developed.

First, this plan is for the construction of a variety of different emergencies developed to ensure that a variety of emergency resources are in a good state of readiness; and can guide the emergency action in accordance with the plan in an orderly manner, to prevent the delay of the accident due to the action is not effective or on-site rescue work in the confusion of the emergency, so as to reduce casualties and property losses. Emergency in construction refers to the suddenness, causing or likely to cause more casualties, larger economic losses of all types of engineering construction accidents.

Second, the establishment of the construction emergency emergency leading group, responsible for the command and coordination of emergency rescue work. Leading group commander-in-chief by the project manager is responsible for the implementation, if the commander-in-chief out, by the project executive manager as deputy commander-in-chief to give implementation, when the deputy commander-in-chief is not in the case, by the technical person in charge of the site for implementation. The implementation of rescue work, specific personnel arrangements see emergency plan organization.

Third, when the construction of the project occurred in a variety of high temperature emergency symptoms, after receiving the emergency report, should immediately start this plan. In the first time, respectively, to the project information contact group, "120" ambulance center for help, and to the leadership of the project to inform the situation. After the emergency, should also be uninterrupted to the relevant leaders, departmental feedback follow-up.

Fourth, after the occurrence of emergencies in construction, the Ministry of the project that is, as appropriate, set up a rescue site command, the project manager as the accident scene commander, and set up the following leadership group: emergency rescue leadership group and members of the emergency commander:

Group name: emergency response leadership group

Leader: Li effect military

Members: Liu Zhibo, Zhang Qingji, Xu Dancheng, Wang Shujun, Liu Liming, Zhang Guohua, Zhou Changxin

Heatstroke protection group: Zhang Qingji, Guo Zhenshan, Zhang Guohua, Qu Yuntao, Li Baoqing, Wang Chunjie

Information liaison group: Zhang Guohua, Zheng Jun, Yang Dongxu

Safety and security (vigilance) group: Liu Liming, Zhang Guohua, Dong Bunyun, Zhang Zhibin, Huo Mingliang

On-site medical rescue team: Qu Yuntao, Li Baoqing, Wang Chunjie, Dong Benyun, Zhang Zhibin, Huo Mingliang

Logistics support team: Guo Zhenshan, Zhang Guohua, Wang Yongheng, Yan Xuelin, Wang Mingwu, Wen Ruilin

1, heat stroke protection team

During the construction process in the summer, in the course of the operation, the open-air working environment is more; the personnel work distribution area is complex and variable; Labor intensity and other aspects of the impact of the project in the summer construction to a lot of inconvenience. In order to protect the legitimate rights and interests of workers and life, property safety, for the operating personnel to create a guaranteed, comfortable environment, in the operating personnel in the occurrence of high-temperature adverse reactions, by the crew chief immediately organize the members of the group, the accident personnel transfer, and control, to prevent the increase of accident personnel in the surrounding construction work site. Make the emergency action has a stronger target, improve the efficiency of the action. So as not to cause huge accident losses.

2, information liaison group

Responsible for understanding the casualties and economic losses and the scope of the impact of emergencies, the organization to collect the weather temperature conditions, and then take the necessary precautions, and the measures taken and the development of the situation, and timely reports to the superiors and the liaison of the relevant departments.

3, safety and security (alert) team

by the safety officer as a team leader and the organization of the crew is responsible for monitoring the development of dangerous conditions, to prevent the impact of the construction period, and the crew to strengthen the safety education, in order to further improve the safety awareness and the organization of the site management personnel to carry out a safety inspection of the construction site, to eliminate potential safety hazards, in order to prevent accidents and once the accident how to control the impact of the accident. How to minimize the impact of accidents when they occur.

4, on-site medical rescue team

When the accident occurs, the crew leader organizes the staff on-site classification and first aid treatment of heatstroke employees, is responsible for the implementation of the first time on the sick good effective rescue; and timely referral to the hospital. The main responsibilities of the ambulance staff are: to enter the construction site to rescue the injured; to guide the heatstroke staff to carry out self-rescue and mutual rescue activities; to concentrate, inventory, transport and treatment of the injured. According to the specific situation, the rapid development of emergency treatment programs and organization and implementation.

5, logistical support group

responsible for organizing the mobilization of rescue personnel, materials and equipment, supervise and check the implementation of rescue and relief measures in place.

V. In the construction of emergency situations occur, the rescue site command according to the specific circumstances, can be mobilized from the nearest nearby site rescue teams, personnel, materials and equipment. At the same time, professional rescue teams, materials and equipment from the emergency reserve rescue team mobilization.

Sixth, after the occurrence of various types of emergencies, the need to mobilize the main professional rescue teams, emergency rescue materials. The main materials and personnel duties are arranged as follows:

1, personnel, material preparation:

The acquisition of materials for the project department is the responsibility of the materials clerk, the main medicines and medical rescue appliances are as follows:

(1), medicines: cold and flu, diarrhea medicines and other therapeutic medicines, and patchouli water, patchouli soft capsule, anemarrhena, tea, sugar and so on.

(2), ambulance apparatus: single frame, ambulance cars, oxygen bags, towels, medical kits, freezers (ice) and so on.

Seven, rescue methods:

1, mild patients

When the site operator dizziness, fatigue, dazzle phenomenon, the operator should immediately stop the operation, to prevent secondary accidents, other peripheral operators should be symptomatic of the personnel arranged to the cool, well-ventilated area to rest, the supply of cool water, wet towels and so on. And notify the project department medical rescue personnel for observation, diagnosis and treatment.

2, serious patients (fainting, shock, severe body dehydration, etc.)

When the operation site appears heatstroke personnel, the operation of peripheral personnel should immediately notify the project department, and promptly transfer the accident personnel to a cool, ventilated area to observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand medical information. The project department shall decide whether to start the heatstroke prevention and cooling plan according to the specific situation by the chief emergency commander. And immediately organize ambulance personnel to the scene of the accident personnel for treatment. For those with serious symptoms, if the medical equipment of the project department cannot save them, they should be transferred to the nearest hospital for observation and treatment at the first time. And report to the owner.

Eight, the aftermath of the work:

1, according to the accident "four do not spare" principle, seriously do a good job of investigating and dealing with accidents, to take targeted precautionary measures, to strengthen the publicity of the team, education, so that each person has mastered the precautions of the construction process in the summer, so that each person knows to protect know how to protect themselves; know how to rescue others. Summarize the lessons learned, to prevent the occurrence of similar events, specific precautionary measures are as follows:

(1) by the information team on the daily collection of weather conditions, processing, and then reported to the Ministry of the project to prevent the summer heat protection team, according to the specific circumstances of the corresponding safety precautions taken.

(2) When the outdoor temperature is higher than 39 ℃, the project department should carry out the construction of special safety instructions for each team to cool down, so that each team to stop on-site construction work.

(3) The logistics support team should be able to ensure that the operating personnel at the scene at any time drinking water, emergency drugs.

(4) by the summer heat emergency rescue organization in accordance with the temperature of the year to develop a set of reasonable and effective "staff work and rest schedule" to avoid the daily temperature of the highest time (11:00 ~ 15:00) section of the construction work.

(5) The Ministry of the project team safety education to enhance the ability of operators to deal with various situations should be tight. Strengthen the summer construction safety publicity work, so that each person understands and masters the safety of summer heat reduction of general knowledge, improve the operating personnel in the practice of resilience and handling capacity.

(6) the project department set up internal medical personnel, strengthen the project internal medical care publicity, safeguard the life of personnel, create a humanized construction site.

IX, emergency recovery, re-entry

When the emergency recovery, re-entry must be evaluated before the hazardous area, and the accident should be analyzed, to be sure that the hazardous area has been determined to be safe before entering the scene, continue to operate.

Emergency plan for heatstroke prevention and cooling for overhead work2

In order to implement the spirit of the Education Bureau's notice on heatstroke prevention and cooling, to ensure that the majority of teachers, students and staff of our school's health and the orderly conduct of school teaching, in line with the idea of "prevention is more important than Mount Tai", combined with the reality of the school, the development of the following emergency plan for heatstroke prevention and cooling.

These are the first steps in the process.

First, the organization:

1, the school set up to the principal as the head of the work of the leading group of summer cooling.

2, carefully organized to study the relevant documents on the prevention of heat stroke, timely briefings, so that the idea in place, organization in place, measures in place.

Second, the duties of each department:

(a) Political Education Office, Academic Affairs

(1) do a good job during the high temperature of the `duty arrangements.

(2) If there is a need to temporarily suspend classes in the hot weather to the first time to inform the class teacher.

(3) To do a good job in the hot weather due to power outages, the suspension of student activities arrangements.

(4) In the hot period to do a good job in the summer cooling, safety and other knowledge of education.

(2) General Affairs Department

(1) in the high temperature before the advent of the organization of personnel on the school all the cooling facilities for inspection, such as damage to the timely repair, to ensure that the normal use of the high temperature season, and the situation will be informed of the departments in a timely manner.

(2) Do a good job of preventing heat stroke and cooling the meticulous work (buy the necessary items to prevent heat stroke, such as green beans).

(3) to do a good job of school electricity, water (drinking water), ice and other necessary items to protect against heat stroke.

(3) classroom teachers

(1) Each classroom teacher should manage the classroom drinking water to ensure the quality of drinking water for students.

(2) The floor of the class should be sprinkled with water in time, and students should prepare a clean towel, soaked with water and ambushed on the head or neck if necessary.

(3) In the heat of the day, students must be diligently observed to see how their bodies reflect.

Third, other work:

Prevention of heat stroke is a comprehensive work, the whole school departments should cooperate with each other, support each other, on call. Departments should strive to do their jobs, combined with the prevention of heat stroke and the actual situation of the post, the scope of responsibility for the work of a check at any time at the disposal of the school heat stroke leading group, *** with the efforts of the collaboration, to do a good job this year's prevention of heat stroke.

Four, specific measures:

First, do a good job of heat stroke prevention publicity. The use of campus radio, theme class meetings and other forms of publicity to students to publicize the general knowledge of heat stroke prevention, education students to actively deal with the hot weather. Actively guide teachers and students in the hot weather to maintain a calm state of mind, unity and harmony, stable learning and work.

The second is to strengthen dietary safety management. Schools to strengthen the commissary health checks, must be sterilized, must open the doors and windows to ensure ventilation. Guarantee students drinking water hygiene, to prevent infection of gastrointestinal diseases.

Third, reduce the student outdoor exercise. Cancel recess, physical education classes and other strenuous activities, to avoid students long time in the outdoor sun, strenuous exercise.

Fourth, to ensure that students have enough rest. Strengthen the duty to maintain a safe and stable rest environment, to ensure that students' mental state.


Emergency plan for heatstroke prevention and cooling for overhead work3

In order to protect the occupational health of employees and prevent heatstroke from affecting the health of employees, this plan has been formulated.

I. Emergency leading group personnel list

Group leader: xxxx

Deputy leader:

Group member:

Second, the emergency leading group office:

Emergency response office is located in the office of the Ministry of the project.

Third, the start and termination of the plan

Summer outdoor temperature of 37 ℃ or more, by the emergency response team leader xxx announced the start of the emergency plan. Outdoor air temperature for 15 consecutive days below 37 ℃, by the emergency team leader announced the termination of the heat stroke prevention plan.

Fourth, the symptoms of heat stroke

In the summer hot season, headache, dizziness, vomiting, nausea and other symptoms, can be judged as heat stroke.

V. Emergency measures:

1, the emergency team leader announced the start of the emergency plan to prevent heat stroke, xxxx responsible for the development of new construction work time, the operating time must avoid the high temperature at noon.

2, xxx, xxxx is responsible for the staff dormitory to buy and install fans and other cooling equipment.

3, xxxx, xxx to do a good job of summer heat knowledge publicity, in the form of a letter to the staff, blackboard newspaper and other forms to teach employees a variety of measures to prevent heat stroke.

4, xxx is responsible for the construction of the front-line employees issued heatstroke medicines, such as Ren Dan, chrysanthemum tea, wind oil essence.

5, by xxx, xxx, supervise the project department and the team canteen, required to do every day to the staff of the green bean soup and other heat stroke food, the site has a supply of boiled water equipment.

6, employees appear heatstroke, immediately report to the emergency response team, the team leader according to the heatstroke situation to organize the emergency response team part, all and other personnel of the project for emergency treatment.

7, the other members of the team for mobile personnel, do a good job with the work.

1, purpose:

In order to prevent the company's employees in the high temperature climate work in the phenomenon of heatstroke, to ensure that the company's production goes smoothly, to ensure that employees appear heatstroke and other emergencies, can quickly and effectively start the emergency rescue work to maximize the protection of employees' body and life safety specially formulated this plan. The company has developed this plan to ensure the smooth running of the company's production.

2, responsibilities and scope of application:

The company's safety management committee for the implementation of the plan responsible for the department, the plan applies to all departments of the company, the focus of the unit of prevention is: stereotypes of the process, composite process, the inspection section, warehouses, boiler room, equipment and power department, canteen.

3, the emergency plan to start:

Based on the maximum temperature of the day published in the Yangtze River Daily, the three consecutive days of the highest temperature in the 37 ℃ or the highest temperature of the day up to 38 ℃ when the automatic start of the emergency plan, all the departments of the company in accordance with the emergency plan to carry out the work measures.

4, emergency plan implementation

(1) equipment and power department should strengthen the management of summer water and electricity supply, to ensure that the workshop production of electricity and water

needs. In the event of special circumstances require power outages, water outages, should be notified in advance to the relevant departments, and according to the specific circumstances of the development of appropriate preventive programs.

(2) widely publicize the prevention and treatment of heatstroke, so that employees master the basic knowledge of heatstroke prevention and cooling; workshop management

management cadres should strengthen the workshop every day to inspect the production situation, and timely understanding of the workshop's high-temperature environment and the physical condition of the workers, and deal with the problems in a timely manner, nip in the bud the seed of the accident.

(3) Equipment and Power Department is responsible for purchasing a batch of cooling medicines in advance, and distributing the medicines to each post of each process according to the requirements. The company has set up herbal tea buckets in each drinking water place to ensure the supply of herbal tea every day.

(4) Workshop key processes and key high-temperature positions equipped with cooling fans. Every day at 10:30 am and 2:30 pm to arrange for employees to take a 20-minute break in the shade and ventilation.

(5) The company's cafeteria should be supplied with ice water twice a day to the production line of the workshop, respectively at 10:30 am and 2:00 pm every day. Every day at noon to supply employees with two buckets of free seaweed egg soup. Specifically by the company office is responsible for the implementation.

(6) The company's fleet should ensure that at any time to set aside a car and equipped with a good driver, in order to cope with the need to deal with emergencies. Specifically by the company office is responsible for.

(7) heatstroke rescue methods:

Mild patients: company employees in the normal operation of dizziness, fatigue, dazzle phenomenon, should immediately stop the operation, to prevent secondary accidents, other peripheral employees should be arranged to the symptomatic personnel to the cool, well-ventilated area to rest, the supply of its cool water, medicines, wet towels, etc.. And notify the workshop or departmental leadership.

Serious patients: (fainting, shock, severe body dehydration, etc.) company employees appear heatstroke, the operation of the peripheral staff should immediately notify the workshop or departmental leadership, and promptly transfer the accident personnel to a cool and ventilated area to observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand information on medical treatment. The company office immediately organize rescue personnel in the first time to heat stroke patients transferred to the nearest hospital for observation, treatment, and reported to the company.

;