How to deal with construction waste, the treatment process of urban construction waste, construction waste is how to recycle, Zhengzhou construction waste disposal company are which?

As we all know, the amount of construction waste piled up in our country is a huge number, if it can't be handled well, it will have a great negative impact on our environment. At present, the technology of construction waste treatment has been very mature, the state and the government also strongly support this piece, but there are also friends in the ask me that the project got the hand, but do not know anything about this area, open the construction waste plant should start from where? (Longer, it is recommended to collect and then see)

Preliminary procedures:

1. Establishment of xxx construction waste treatment plant legal person company.

2. To xxx construction waste treatment plant legal person company name to the local government to submit application documents, waiting for government approval through. After that, you can invite the local environmental protection bureau, construction bureau, land bureau and other synergistic *** with the site selection.

3. Find the construction waste treatment equipment manufacturers, and let them provide a reasonable production line processing configuration program.

4. Sign the Municipal Domestic Waste Franchise Agreement

5. Approve the Feasibility Study Report.

6. Approval of the Environmental Impact Assessment Report.

7. After the above formalities are completed and the local government agrees to the construction approval and the land department's "land siting opinion", the construction can begin. The rest of the procedures can be done while building.

Additionally, we should probably understand the preferential policies provided by the government in different investment modes:

1. Apply for funds from the Development and Reform Commission (DRC), the local government invests on its own and commissions its own operations.

2. enterprise investment, the government to provide preferential policies, land allocation, and help apply for provincial and municipal project subsidies and national bond funds, etc., the enterprise operation for a period of time after the gratuitous transfer to the local government.

3. Enterprises invest, the government provides preferential policies, and helps apply for provincial and municipal project subsidies and national bond funds, but the land is purchased by the enterprise, and the enterprise has always had property rights.

After understanding the formalities of building a factory, as a layman on the professional and technical production line configuration of this piece of know-how how to do. This line is completely unaware of can consider EPC turnkey, that what is EPC turnkey, what are included.

1. program design

(1) production line design

For a person who has not engaged in this industry before, let him to design the entire sand production line is indeed at a loss. Especially nowadays, with the high pressure of environmental protection, an environmentally friendly, fully enclosed dust-free and noiseless production line is crucial, which is guaranteed in EPC turnkey projects.

(2) Staffing

Staffing is also directly related to the design of the production line above, a good production line is not cost a lot of manpower, only a very small number of people to manipulate can be. In addition, reasonable staffing can also save a lot of investment costs.

(3) site planning, road paving

Preliminary site planning, road paving on the later operation of the gravel plant is a direct impact, such as site planning near the original mine, you can save a lot of transportation back and forth material and human resources. In addition, the mechanism of sand made in the later stage is to be transported to various places, the transportation trucks come and go, so the road paving is also crucial.

(4) plant office facilities, water and electricity heating system

Intelligent electronic control unit system can save a lot of manpower, material resources and other investment costs. In addition, the common office system, water and electricity heating system are also necessary facilities.

(5) environmental protection facilities

Last but not least, the use of certain environmental protection facilities is a direct impact on the environmental indicators, we all know that in the EIA procedures, there is a requirement that certain parameters can not exceed a specific value, appropriate and reasonable environmental protection facilities and the EIA procedures are closely related to the passage.

2. Technical assistance and support for project infrastructure

(1) Steel structure plant construction, production line equipment infrastructure

Plant construction, production line equipment infrastructure, these are all within the EPC project turnkey, before the installation of the entire production line is needed for some of the groundwork, in order to cooperate with the installation of the entire production line is completed.

(2) sewage treatment, dust removal system construction

We all know that nowadays the status of environmental protection policy, to take some sewage treatment, dust removal system and other environmental protection measures is imperative.

3. Supply, installation and commissioning.

Not only can we provide the main equipment crusher, sand making machine, etc., the entire production line used in the procurement of other ancillary equipment is also in the EPC turnkey, such as conveyor belts, dust removal facilities.

There are those who want to invest in construction waste treatment but don't know much about this business can consider EPC turnkey, and you can always consult with them for other questions.