Construction Contract Template 5

Construction Contract Template 1

Party B:

Party A hires Party B to build a two-story brick-concrete structure of a building of about 240 square meters (the settlement of the settlement according to the actual area of the final account), in order to clarify the respective responsibilities of both parties to ensure the quality of the project, a clear economic purpose, now by the A, B, the two sides agreed on the following terms under the principle of equality and voluntariness:

First, Party B to be contracted in the form of contracted work and materials to be built

each Both sides of the consultation, in the principle of equality and voluntariness to reach the following terms:

First, Party B to package materials to be constructed

The unit price of 1016 yuan per square meter calculation (capitals: one thousand zero one hundred and six yuan), the big package price once signed is not subject to any market, prices, the state of the construction industry unit price adjustment of the impact of the construction industry, not to make any adjustments.

Second, Party B contracted the project's reinforcing steel usage

Reinforcing steel is used --, reinforcing steel type: columns 16, ground circle beams 4 16 second floor circle beams for 4 16, the plate surface were used 8 and 6 of the reinforcement, spacing of 15 cm, overhead load-bearing beams with 22 and 18, according to the requirements of the laying of the wall seismic reinforcing bars, and other reinforcing bars in accordance with the Party to provide the design drawings laying.

Third, the use of cement

1, cast-in-place beams, slabs, columns, rigid roofing are used Dianxi Pusi 4

2.5 level;

2, Maushi grouting, bricklaying, plastering, tiling, floor tiles, wave tiles are used Jianchuan Pusi 3

2.5 level.

3, beams, slabs, columns, rigid roofing concrete grade is not less than C25.

Fourth, the decoration includes the following (if the actual price of purchased materials exceeds the price of each of the following provisions, subsidized by Party A to Party B)

1, flooring for baking small wooden floor, the price of 120 yuan per square meter (capital: one hundred and twenty-two yuan per square meter);

2, bathroom, operating room,

The first floor door outside the walkway and other need to paste tiles and floor tiles, ceramic tiles and floor tiles, the price of 35 yuan per square meter (capitals: three hundred and five yuan per square meter);

3, the price of each door of 700 yuan (capitals: seven hundred yuan)

4, the bathroom door of aluminum alloy or plastic steel door, the price per archive door of 200 yuan (capitals: seven hundred yuan)

4, bathroom door, aluminum alloy or plastic steel door, each archive door The price of 200 yuan (capitals: two hundred yuan each), anti-theft door 1, the price of yuan (capitals: two thousand yuan);

5, bathroom, operating room ceiling for plastic buckles, the price of 35 yuan per square meter (capitals: three hundred and five yuan per square meter);

6, the windows of the whole building for the real Tak plastic steel windows (national inspection-free products), single frame glass;

7, vase columns, balustrades, stair handrails purchased and installed by party B, the price of 180 yuan per meter (capital: one hundred and eighty dollars per meter);

8, the project within the lamps and lanterns, sanitary ware, kitchen utensils, window coverings purchased by party A, party B is responsible for the installation.

Fifth, line and pipe materials

line pipe with building materials market sales of medium-priced national inspection-free products, wires are copper-core wire, the main line with 6-square and 4-square, the plugboard line with

2.5-square, lamps, switches with

1.5-square.

Sixth, water supply and sewage

1, water supply pipe - pipe, with building materials market sales of national inspection-free products;

2, sewage pipe C pipe, with building materials market sales of national inspection-free products, specifications for the 75 and 110 pipe.

VII, interior wall scraping porcelain plaster lines and exterior paint

Interior wall scraping porcelain with porcelain powder, plaster lines and exterior paint with building materials market sales of national inspection-free products, medium price.

Eight, roofing project

The whole building of the roof for the rigid roofing, including rigid roofing cold drawn wire, cement, sand procurement, transportation, cold drawn wire system, mortar production pouring, molding, expansion joints and asphalt patching treatment, maintenance, wave-type tile paving.

Nine, layer height

first floor is

3.2 meters, the second floor is 3 meters, two layer height *** count

6.2 meters (excluding the thickness of the floor and roof panels).

X. Payment

1, the start of the demarcation by Party A prepaid Party B material costs of 40,000 yuan;

2, the foundation is completed by Party A prepaid Party B 40,000 yuan;

3,

the first layer of the plate is completed by Party A prepaid Party B 40,000 yuan;

4,

the second layer of the plate is completed by Party A prepaid Party B 30,000 yuan;

4,

The second layer of the plate is completed by Party A prepaid Party B 30,000 yuan;

5, inside and outside the wall plastering completed by Party A prepaid Party B 20,000 yuan;

6, in the decoration need to buy materials by Party A prepaid Party B 30,000 yuan;

7, the completion of the project, and by the two sides of the acceptance of the A, B, Party A should be paid to clear all of the works of Party B, Party B should be deducted from the quality of the deposit of Party B 3% in the ________ after the whole project has no quality problems, Party A shall return Party B's 3% quality deposit.

X

I. Term of the project

Start date: ________ year ____ month ____ date, completion date: ________ year ____ month ____ date, the total construction period of 108 days.

Ten

Second, Party B's responsibility

First, strictly in accordance with the design drawings, design drawings with notes or instructions, relevant engineering construction norms and regulations to organize the construction; second, to effectively prevent the quality of the project and safety accidents, the construction process of all quality and safety accidents borne by Party B; third, to ensure that the duration of the work; fourth, the design drawings and notes in the matter of unspecified in a timely manner with the Party to reflect the coordination of rationalization proposals on design defects. Rationalization of design defects proposed.

This contract shall enter into force on the date of signature, and the two parties shall negotiate and resolve any outstanding issues.

This contract is in triplicate, with the same legal effect.

Party A (official seal): _________ Party B (official seal): _________

Legal Representative (Signature): _________ Legal Representative (Signature): _________

____ ____ ____ ________ ____ ____< /p>

Construction Contract Template 2

Contractor: (hereinafter referred to as Party A)_________

Contractor: (hereinafter referred to as Party B)_________

Party A plans to build a new house, and the carpentry work in the construction and repair of the house will be contracted to Party B on the basis of merit in a fair competition. Party A plans to build a new house, in the fair competition, the carpentry works in the construction and repair of the house will be contracted to Party B for the completion of the carpentry works designed by Party A, and to clarify the relationship between mutual rights and obligations, the two sides negotiated, and hereby sign this contract. In order to abide by the contract, and strictly fulfill, *** with the compliance with some of the terms:

I. Scale of the project: Party A's new house for the two floors and a bottom, the door rows of two, reinforced mixed brick structure, the floor level of each layer of reinforced concrete pouring.

Second, carpentry project price: Party A to base piers each meter _________ yuan, floor slabs per square meter _________ yuan, ground through the beams per meter _________ yuan, columns per _________ yuan pricing.

Third, quality requirements: Party B must ensure that the columns, foundation piers, ground through the beam in accordance with the specifications of the Party A housing design construction, while ensuring that each floor slab surface leveling, each stair step uniform.

Fourth, the responsibility for safety accidents: Party B in the construction of the project, always put safety awareness in the top priority. If there is a safety accident, once Party A bought accident insurance, in accordance with the state regulations of the accident insurance processing, Party A will not be responsible for other all any responsibility.

V. This contract from the date of signing, A and B signatures come into effect.

Sixth, this contract is not exhaustive, A and B through the formation of consultation **** knowledge, and this contract is equally effective.

VII, this contract in duplicate, A and B each sign a copy.

Party A (official seal): _________ Party B (official seal): _________

Legal Representative (Signature): _________ Legal Representative (Signature): _________

_________ ____ ____ _________ ____ ____ Day

Construction Contract Template 3

Contractor (Party A):

Contractor (Party B):

In accordance with the Contract Law of the People's Republic of China (PRC), the Construction Law of the People's Republic of China (PRC), and other relevant laws and administrative regulations, and in accordance with the principles of equality, voluntariness, In accordance with the principles of equality, voluntariness, fairness and honesty and credit, A and B enter into this contract by consensus on the following construction project construction matters.

I. Overview of the project

1, Project Name:

2, Project Location:

3, Project Scale:

4, Structural Forms:

Second, the scope of the project contract

(a) Contracting Scope of B:

The scope of the project contract:

According to ____________ design of the construction drawings and the relevant technical documents (including drawings and technical documents). relevant technical documents (including minutes of drawing review, notice of design change, Party A's written notice of modification, etc.) are responsible for the general contracting of the construction of ____________;

The main construction contents include but are not limited to the following:

1. Civil construction works

(1), civil works above the foundation (including the cleaning of the pile head and the concrete of the core of the precast pipe piles) .

(2), manual trimming after large earth excavation, earth excavation and backfilling of elevator pit and foundation bearing platform floor beam, backfilling and compaction of foundation and indoor earth; pit drainage works.

(3), responsible for the civil construction of power distribution room, pump room, elevator machine room, fire center, entry lobby and other ancillary rooms.

(4), responsible for the construction of outdoor septic tanks and drainage sewage pipes (connected to the first access well of the district road).

(5), is responsible for the fire and other professional engineering of the reserved, buried, and is responsible for the professional engineering after the construction of the repair.

(6), responsible for all the cleanup before the acceptance of the completion of the project: including cleaning of the external walls, construction waste and domestic garbage removal (including Party A subcontracting of other professional works generated by the garbage designated dumping site and is responsible for the transportation), as well as by the Party A to complete the demolition of all temporary facilities (if any).

(7), is responsible for supervising the completion of the project before acceptance of the professional subcontracting works of the subcontracting of the completion of the information submitted and summarized in a book with the general contractor.

2, water and electricity installation works

(1) water supply and drainage works: water supply system from the life of the water supply and commercial water supply after the municipal meter (pump room equipment installation is not included in the scope of the contract), installed to the end of the household water supply point; drainage system from the drainage point to the first outdoor check well (including the installation of submersible sewage pump).

The scope of the above contract includes: earth excavation and backfill, piping and equipment foundation, casing and holes in the pre-buried and blocking, valve well construction, piping equipment, marking and painting, etc., does not include the installation of sanitary ware.

(2) strong electricity project: special power distribution system from the distribution room low voltage cabinet out of the switch, installation to the end of the electrical equipment; public distribution system (a household a meter) from the meter box out of the switch, installation to the end of the electrical equipment; generator to the distribution of low-voltage cabinets of the line installation; outdoor high and low-voltage cable channel construction; the installation of landscape wall lamps in the stores riding the building.

Lightning protection and grounding system from the foundation, installation to the end of the lightning belt (needle); including equipotential system and iron railing, aluminum windows and doors, bridge, piping, equipment and other parts of the lightning protection and grounding installation.

The scope of the above contract includes: earth excavation and backfill, pipeline and equipment foundation, casing and hole pre-embedding and blocking, cable well construction, line equipment marking and so on.

(3) weak electricity project: network, telephone, cable TV, intelligent, security, fire alarm linkage and other weak electricity system bridge, wire pipe, wire box, distribution box buried and outdoor access construction

The above scope of contracting includes: earth excavation and backfill, casing and holes buried and blocking, construction of the hand hole, line equipment marking and other content.

(4) human defense engineering: human defense system pipelines reserved for burial and all works associated with the human defense project (except for the sub-projects designated by the Municipal Office of Human Defense, which must be constructed by the special construction of human defense contractors).

(5) is responsible for contracting a variety of pipelines and boxes within the scope of the plugging, rework caused by the second leveling plastering, their own construction of garbage cleanup; responsible for civil construction of air conditioning in the concrete through the wall casing pre-buried, brick wall air conditioning through the wall casing pre-buried pre-buried.

3. Other ancillary works which are inseparable from the above works.

(2), the contract scope of this contract does not include the following construction content, but Party B must fulfill the general contracting management and cooperation responsibilities:

1, piling works and pit support;

2, large-scale earth excavation and backfill outside the basement;

3, windows and doors (including air-conditioning louvres);

4, railings;

5, human security equipment and backfill;

6, air-conditioning equipment and backfill;

7, air-conditioning equipment and backfill;

9, air-conditioning equipment and backfill.

5, human security equipment works;

6, fire protection works;

7, gas pipeline project;

8, generator installation and environmental protection works in the engine room;

9, elevator, escalator installation works;

10, garden construction and landscaping works;

11, glass curtain wall and dry-hanging stone works;

12、Intelligent engineering;

13、Floodlighting project;

14、Underground garage floor paint and traffic facilities marking and delineation project;

15、Secondary finishing works;

16、Water supply and equipment installation;

17、Installation of substation equipment;

18、Solar water heating project;

18、Solar water heating project;

18、Solar water heating project;

19、Solar water heating project;

20、Solar water heating project;

20、Solar water heating project;

21、Solar water heating project.

19, television and telephone network engineering;

20, drinking water project.

21, children's play and elderly sports equipment installation project.

22, swimming pool, sports ground construction and equipment installation works (tennis court).

23. Installation of clubhouse equipment.

(c) The scope of the above contract is generalized, subject to the construction drawings and relevant technical documents provided by Party A (including the minutes of the drawing review, notice of design changes, Party A's written notice of modification, etc.). If the scope of contracting under this Agreement is not detailed or ambiguity arises in the process of contract execution in the scope of contracting under this Agreement, Party B shall unconditionally comply with the needs of Party A's site to carry out the construction of the project content clarified by Party A. Regardless of whether the content of the project content of the clear part of Party A is included in the scope of the contracting under this Agreement, the part of the settlement of the cost of the contract agreed upon by the contract in accordance with the method of measurement of the pricing and charging, as follows Floating point rate to participate in the descending point.

(4) Party A has the right to make adjustments to the designated subcontracts, designated supplies or independent works at any time, and the relevant costs will be calculated in accordance with the terms of the contract. Party B undertakes that it will not make any claim for the price and duration as a result of such arrangement.

Third, the contracting method

1, package materials (except for the main materials and equipment), package machinery, package temporary facilities, package water and electricity laying, package utilities, package quality, package safety, package schedule, package civilized construction, package information (including as-built drawings), package acceptance of the completion of the package to be paid by Party B's insurance, package warranty, package tax, and so on.

2, Party A is responsible for the supply of the following materials:

stone, finishing tiles, roof tiles, wires, cables, three boxes of equipment.

3. In addition to the main materials and equipment supplied by Party A, Party B is responsible for all other materials and equipment required within the scope of the contract.

Fourth, the contract duration

1, the two sides agreed that the total duration of the contract is calendar days.

2, the tentative date of commencement and completion date is:

Date of commencement: January, 2012

Completion date: January, 2012

Party A can adjust the date of commencement of work in accordance with the actual completion of the piling of the building number (to Party A issued notice of commencement of the work), the duration of the work according to the Party's baseline work period.

3. Party B undertakes not to make any claim for price and construction period due to the delay of the actual start date of some buildings. Settlement of the cost is still in accordance with the contract agreed upon measurement and pricing methods and fees, according to the floating point rate to participate in the point of reduction.

4, A and B in determining the date of completion and the various control period, has given full consideration to:

(1) may occur in various scales of rain, typhoons, hot weather, water supply, power outages, holidays, construction sites and the surrounding environment and other influencing factors;

(2) Party designated subcontracting works of the reasonable duration;

(3) the government to organize large-scale activities and required stoppages. activities and required stoppage of work.

Fifth, quality standards

Project quality standards: According to the current national "uniform standards for quality acceptance of construction works," the project must be a one-time completion and acceptance of the project, the quality of the project to meet the qualifying standards, the quality of the view of the evaluation of the quality of the good, and must be the municipal construction project "quality structure" award, and strive to create a "cup" award. "Cup" award.

Six, the total cost of the contract

According to the contract scope of the provisional total price of RMB yuan (lowercase) ¥: yuan (including tax), Party B to provide the full amount of official invoices.

VII, liability for breach of contract

(1) Party B did not submit to Party A in accordance with the provisions of the contract for the completion of qualified engineering information and for the completion of the relevant engineering acceptance certificate or overdue, affecting the completion of the Party A for the record procedures, every day overdue, Party B by one hundred thousand yuan / day to pay liquidated damages to the Party A, the total amount does not exceed the tentative total contract price of 5%.

(2) under any circumstances Party B must ensure that there is no mobbing of workers, petitions to government departments, sit-ins, siege Party A, otherwise the losses caused by Party A has the right to deduct from the amount payable to Party B in the project payments, and according to the number of workers each time the number of disturbances in each of the day of $ 1,000 per person to Party B to carry out a fine; if the fine amount of less than $ 50,000, according to the amount of $ 50,000. If the situation is serious, Party A has the right to terminate the contract unilaterally, in addition to the fine imposed on Party B. At the same time, Party B's liability for breach of contract according to the agreement of the special provisions.

(3) Party B shall provide qualified project information within the scope of general contracting management to the supervisory unit in a timely manner every month; if it fails to provide timely or the information provided does not meet the requirements, Party A may refuse to pay the progress payment. If it affects the acceptance or construction of the next process, the construction period shall not be postponed; if it causes loss to Party A, Party B shall be responsible for the compensation and pay the liquidated damages at 5% of the total price of the tentative contract.

(4) Party B shall supervise its labor subcontracting units and labor workers to sign labor contracts, supervise the workers' attendance and payroll, labor contracts for the record, workers' wages should be paid on time and publicity (payroll record sheet must be signed by the workers themselves and hand-printed). Party B needs to provide Party A with proof that workers' wages have been paid before declaring the progress payment every month, and Party A can refuse to pay the progress payment if it is not provided.

(5) Party B shall not subcontract or subcontract any part of the works within the scope of the contract without Party A's written consent. Otherwise, Party A has the right to terminate this contract, and Party B shall compensate Party A for the loss and bear the responsibility for breach of contract according to the agreement of the special clause.

(6) The contract stipulates that Party B to complete or provide cooperation with the work (including the contract, minutes of the agreed content and design changes, etc.), such as Party B refused to complete or can not be completed in accordance with the contract requirements, Party A has the right to arrange for the completion of other units, the costs incurred by double counting, and deducted from the payable to the Party B in the current month of the project payment, the impact of the responsibility of the work schedule by Party B is responsible for.

VIII. Documents comprising the contract

(a), the contract contains documents including:

1, the contract agreement

2, the special terms of the contract and annexes

3, the general terms of the contract

4, standards, norms and related technical documents

5, drawings

6, other Contract documents.

The written agreements or documents of the parties concerning the negotiation and change of the works shall be regarded as an integral part of this contract.

(b), the documents that make up this contract and the order of priority of interpretation are detailed in Part II of this contract, "General Terms and Conditions" of the relevant agreements.

IX. Meaning of Words:

The meanings of the relevant words in this Agreement are the same as the definitions respectively given to them in Part II of the General Terms and Conditions of this Contract.

X. Commitment of Party B:

Party B commits to Party A to carry out the construction and completion of the project in accordance with the contract and to undertake the responsibility of project quality warranty during the quality warranty period, and to fulfill all the obligations agreed upon in this contract.

Party B undertakes to Party A to assist Party A effectively and timely in applying for the construction license and the governmental and other licensing procedures involved in the construction and completion of the project, and to bear the relevant costs stipulated by the government to be borne by Party B, and to assist Party A in applying for all the procedures related to the application of real estate certificates, etc. free of charge. If Party B fails to apply for the relevant documents in time due to Party B's reasons, 5% will be deducted from the total cost of the project as a penalty.

XI, Party A undertakes to Party B to pay the contract price and other sums payable in accordance with the agreed period and manner, and to fulfill all the obligations agreed in this contract.

XII, the contract enters into force

The contract is concluded on: the month of

The contract is concluded at:

The contract is agreed upon by both parties: both parties signed and sealed to enter into force.

Party A (seal): legal representative: proxy: residence: zip code: telephone: fax: bank account: bank account number:

Party B (seal): legal representative: proxy: residence: zip code: telephone: fax: bank account: bank account number:

Construction Contract Template 4 < /p>

Contractor: _______________________

Contractor: _______________________

A and B in the spirit of equality, mutual benefit and the principle of consensus, on the South Spring Plaza project construction labor labor cost matters, up to the cost of the contract terms are as follows, the two sides * * * the same Compliance.

Article I: Project Overview

(a) Project name: ____________________________.

(ii) Location of the project: ____________________________.

(iii) Construction area: ____________________________.

Article 2: Scope of Contracting

Artificial excavation and transportation of earth and stone, backfill; cast-in-place concrete works (integrated), supporting mold (including scaffolding), steel production, installation; prefabricated components production, installation; bricklaying; paving granite, square tiles, column surface, column head, guamishi stone floor and plastering; masonry and lawn curb; two cloth and six oil waterproofing; scaffolding take down; ladder treads veneer Masonry, brick paste; building demolition (including slag removal), building temporary installations; sporadic estimates, etc. (in addition to water and electricity installation and greening works outside all the projects).

Article 3: Contracted Amount

For details, please refer to the unit price and name sub-item lump sum price included in the Annex of this contract.

Composition of the contracted amount = unit price × amount of received square + upward and downward fluctuation ratio amount.

This project labor labor costs in addition to the greening project, all project prices have been included, no longer a separate project, if any, the site according to the actual situation to determine.

The project before entering the field, Party B to pay five hundred dollars deposit, the project successfully entered the field 15 days after Party A to return the deposit. The unit price of major sub-projects is attached to this contract as an annex to the contract. This unit price has included a series of costs such as management fees, tools, transportation, insurance and so on.

Article 4: Duration (three months)

(a) Start date: ____________________________.

(ii) Completion date: ____________________________.

Article 5: Construction Technology Requirements

(a) Each project before the commencement of construction by Party A construction technicians to Party B, and in writing signed by Party B's representative.

(ii) Party B's representative must direct the workers to construct according to the technical instructions and construction specifications. First make a sample, up to standard before construction.

(c) The first process must be carried out in accordance with the several steps of delivery, construction, inspection and acceptance, and the next process can only be carried out after the completion and acceptance of this process.

Article 6: Responsibilities and work of both parties

(a) Party A's work

1. Provide accommodation and food conditions:

2. Coordinate the working relationship for Party B's construction:

3. Send the construction management team to the site, arrange the project progress, project quality and construction steps, guide the Party B's construction and supervise the quality and safety work. Checking.

(2) Party B's work

1. Strictly implement the contract on the construction period, quality, safety requirements, deployment of Party A's requirements of the appropriate types of work and the number of workers, to comply with the arrangements of the construction staff, according to the norms of construction.

2. Strengthen the management of workers, educate workers to abide by the law, and handle the temporary residence permit and other relevant procedures for migrant workers. Strengthen the safety, fire prevention, anti-theft awareness.

3. Organize workers civilized construction, reinforcing steel workers, welders and other important types of work must be licensed, strengthen the management of the construction site, to achieve the end of the work site clear. Civilized construction, turnover material package use.

① fasteners at 3%,

② u-shaped buckle at 15%,

③ steel pipe, steel molds at 0.5% dry, full prize and full compensation.

Article VII: Project Acceptance

(a) project quality, to the national engineering quality inspection and evaluation standards for excellent grade requirements to ensure that the sub-projects are excellent sub-projects are excellent, sub-projects to ensure that the unit project is excellent.

(b) to the A side of the construction staff and supervision engineers visa for acceptance.

(c) The quality problems caused by Party B rework, Party B is responsible for all the responsibility and bear the loss of materials and labor costs.

(d) Rework caused by Party A's command error, Party A will pay Party B 30 RMB per person per day according to the actual labor of the part that Party B has done.

Article 8: Payment of labor cost

(a) After the commencement of the project, Party A will advance to Party B the living expenses of workers, per person per month **** debit token rolls of 250 yuan, 50 yuan in cash, every 10 days debit, the total amount of control.

(ii) every 30 days according to the image progress calculation of the workload, if the projected duration is reached then pay the total workload of '70% of the labor costs, the completion of the workload exceeds the planned volume, then pay 80%, less than 60%. The amount of advance must be deducted when payment is made. If Party A does not pay wages on time, Party B has the right to demand payment of wages from Party A or to go on strike.

(c) the completion of the project, acceptance, and then calculate the total workload, deduct the total debit (advance on behalf of the insurance premiums), return all the lent tools, equipment, swing materials, surplus materials, supplies, etc., deduct the damage, shortages, part of the compensation to be paid in full within 10 days of the total amount of 95%, the balance of one month to pay off.

(d) If the project is assessed by the authorized unit of quality standards for good works, Party A will be annexed to the unit price of 30% settlement; will be reimbursed during the construction period of the tools as a reward; if you can not reach the good, Party A will be annexed to the unit price of 10% down and Party B for the settlement.

Article IX: Safety Responsibility

Party B must strictly abide by Party A's rules and regulations and safety procedures for construction operations, due to Party B's illegal operation of the safety accidents caused by Party B is solely responsible for all costs incurred and Party A has nothing to do with Party B must purchase all workers during the construction period of the personal accident insurance, insurance premiums by the Party B at its own expense, Party B submit the list of workers, Party A for the Party B's workers, and Party B's workers, the Party B's workers, the Party B's workers, the Party B's workers, the Party B's workers, the Party B's workers. Party B will submit the list of workers and Party A will do the insurance procedures for Party B.

Article 10: Matters not yet resolved by the two parties shall be negotiated separately and become an annex to this contract, and the two parties ****comply with each other

Article 11: Other agreements

If Party B's craftsmanship level and duration do not meet Party A's requirements during the construction process, Party A has the right to ask Party B to withdraw from the site unconditionally, and shall not settle the bill, and the Party A shall not claim compensation for the loss of duration and credibility.

This contract is not a contractual agreement.

This contract is in duplicate, Party A and Party B each sort of a, with the same legal effect, both sides signed (seal) after the entry into force, the completion of the project acceptance, clear the balance of the natural expiration.

Party A: __________________ Party B: _________________

__________ __________ ____ month ___ __________ ____ month ___

Construction Engineering Contract Template 5

Party A: Identity card number: (hereinafter referred to as Party A)

Party B: Identity card number: (hereinafter referred to as Party B)?

After friendly consultation between the two sides, Party A agreed to pavement housing construction contracted to Party B, now the relevant matters signed the following agreement.

Article I:

This project from the ground beam above the building height of six layers, the implementation of the package does not include materials, according to the floor area, per square meter wage yuan.

Article 2:

Party B's work content: wall masonry reinforcing steel help tie (all concrete, beams, columns, boards) concrete pouring (including the ground) internal and external wall painting (including six layers of smearing) building frame erection and dismantling. Xian lime, roof railing edge masonry and painting.

Article 3:

Party A provides water, electricity and materials to the cement roadside at the entrance of the pavement.

Article 4:

Quality of safety requirements

1, Party B must strictly according to Party A's architectural design drawings specification requirements of construction, such as not according to the quality specification requirements of construction and affect the quality of the project, Party A has the right to require Party B to rework unconditionally, and compensate for the loss caused by rework to Party A.

2, Party B must enhance safety awareness and strengthen safety management. Strengthen the safety precautions, strictly in accordance with the safety construction norms. In the construction must also put themselves in the shoes of others to ensure that the construction is foolproof. Party B must purchase personal accident insurance for each staff. If the staff in the construction of industrial accidents, Party B is fully responsible, Party A is not responsible.

Article 5:

Payment: Party A pays in installments according to Party B's construction progress. The first layer of Party A in Party B after the completion of the project according to the progress of payment of eighty percent of wages, the rest of the floor of each layer completed in accordance with the progress of payment of sixty percent of wages. The construction work is completed in accordance with the requirements of the architectural design drawings, and the wages are paid in full.

Article 6:

Requirements for the construction period: the project must be completed before the month of 20--year party B. The project must be completed before the month of 20--year party B. It can not be delayed, stalling party A's progress. Can not be delayed, stagnation of Party A's progress, otherwise, Party A charge Party B's stagnation of five thousand dollars.

Article VII:

This contract is in duplicate, A and B each party to sign a copy of the two sides have the force of law, the two sides *** with the same to comply with, consciously fulfill. If there is a breach of contract, the breaching party shall be responsible for compensating the losses caused to the other party due to the breach of contract.

Signature of Party A:

Signature of Party B:

20--Year--Month--Day

Construction Contract Template 5 Related Articles :

★ Construction Contract Template 5

★ Building Construction Contract 5

★ Construction Contract Commonly Used Templates 5

★ Construction contract template 3

★ Engineering contract template 5

★ Formal construction contract template 5

★ Construction construction contract model (five)

★ Engineering labor contract agreement template selected five

★ Construction contract template 3 the latest

★ Construction project Contracting contract template 3

★ Construction contract template 3