Now the decoration, is a lot of people must face the problem, the choice of materials and decoration compartmentalization is also a problem for everyone, the choice of the wall to play steel plate construction process, the following small make up for you to introduce the Medical? Plate wall construction program.
Medical panel wall construction program: clean the surface of the said structure and leveling → line releases, compartments → boards, repairs → card installation of U-shaped bonding preparations → → pipeline laying wiring installation frame → partition table → door and window frame installation → seam Processing → desktop decoration
Medical panel wall construction program , cleaning the next door panel and upper surface, floor surface, said wall surface and said top surface, according to the design position, and play said sidewalls and holes in said line of the boundary line of the doors and windows and divide the file according to the width of the board.
LINE RELEASE TRAY: On the floor, said wall and said top according to the design position, and touching the edge line of the wall and the holes of the doors and windows columns, according to the width of the board.
Medical board wall construction program, matching table, repair: the length of the table should be reduced by 20 mm according to the net height of the floor structure. Calculate and measure the size of the partition at the top of the door opening window and the bottom window, and the plate of the said door frame, and use the window embedded in the parts made of dimensions. When the beam and the width of the wall is not standardized with the length of the partitioned next-door boards the walls will be previously overlapped and will be expanded (or will be surrounded) to the appropriate width and the corners of the corners will be placed. Defective panels must be repaired.
Installation of partition wall panels. Partition wall panels must be installed in order, starting from the joint with the wall and must be installed in order. Clean the sides of the panels with floating plaster. In the wall surface, said top surface, said top surface and the side surfaces of said board (board surface), the adhesive is scraped off completely, according to the position of the elastic cables and wedges are installed in the position to place the wood on the bottom of the board and push it by hand. The dividers make the joints smooth, one person uses a lever to finish the bottom of the table, the others strike the wooden wedge so that the table next door is compressed and topped, and the adhesive is then extruded smoothly with a knife (scraper). Install the bulkheads alternately as previously done.
Medical board wall construction program, installation of color steel plate before the installation work must be carried out after the completion of the floor and other conditions related to the installation, such as the larger equipment has been transported, the deep bottom pipe has been adjusted, the main installation of technical intermediate layer. Before completing the work, the work is essentially complete.
The above is the Medical Board Wall Construction Program, I hope it can help you.