The municipal, county (city, district) people's government housing and urban-rural construction administrative department or other supervision and management departments determined by the people's government at or above the county level to implement supervision and management of construction dust pollution prevention and control work.
Planning and natural resources, urban management, public security, transportation, finance and other administrative departments of the people's governments of cities, counties (cities and districts) in accordance with their respective responsibilities, and other work related to the prevention and control of construction dust pollution management of construction projects. Article 7 The administrative departments of ecological environment, housing and urban-rural construction, planning and natural resources, urban management, public security and transportation of the people's governments of cities and counties (cities and districts) shall, in accordance with their respective responsibilities, include the prevention and control of dust pollution in the daily supervision and management of construction projects, organize special inspections of the prevention and control of dust pollution on a regular basis, and strengthen the inspection of key areas, projects and links, and establish the information on the prevention and control of dust pollution in the construction of construction projects. Construction dust pollution prevention and control information sharing **** enjoy the mechanism to promote coordination and linkage. Article 8 The construction, the construction unit shall establish and improve the dust pollution prevention and control management system and specific prevention and control measures, and according to the seasonal characteristics, construction phases, meteorological conditions and other actual circumstances, the whole process of construction dust pollution prevention and control of dynamic management.
Construction dust pollution prevention and control, should be consistent with the "Prevention and Control of Urban Dust Pollution Technical Specification" "construction site environment and health standards" and other national, industry and local standards. Article IX of the public has the right to construction engineering construction dust pollution behavior complaints, reports. People's governments at or above the county level, ecological environment, housing and urban-rural construction, urban management administrative departments shall set up and publicize the complaint and reporting telephone, e-mail, and promptly accept public complaints and reports of construction dust pollution, timely investigation and handling, and will inform the results of the complainant or informer.
Newspapers, radio, television, Internet and other media should be strengthened to prevent and control dust pollution in construction projects public opinion supervision. Chapter II Prevention and Control Responsibilities Article 10 The construction unit of the construction project construction dust pollution prevention and control of the following responsibilities:
(a) the construction dust pollution prevention and control costs included in the project cost, in the construction contract to specify the relevant content, and according to the contract or the relevant provisions of the contract or the construction unit paid in a timely manner;
(b) the construction project has two or more construction units, coordination of Solve the dust pollution prevention and control problems of the site and road used for ***;
(iii) cover the bare ground of the construction site which cannot start construction temporarily, or green, pave or cover the bare ground of the construction site which cannot start construction for more than three months;
(iv) other duties stipulated by laws and regulations. Article 11 The construction unit shall assume the following responsibilities for the prevention and control of construction dust pollution in construction projects:
(1) prepare a program for the prevention and control of construction dust pollution and record it with the competent department;
(2) implement measures for the prevention and control of construction dust pollution and control the sources of dust pollution;
(3) train and educate the project management personnel and operation personnel on the prevention and control measures of construction dust pollution
(d) reasonable use of construction dust pollution prevention and control costs, to ensure that funds are earmarked;
(e) set up dust pollution prevention and control at the entrances and exits of the construction site to regulate the public signage, dust pollution prevention and control measures, the relevant responsible person, dust supervision and management departments and other information;
(f) carry out online monitoring of dust pollution at the construction site, and ensure that the related monitoring equipment for normal operation;
(vii) regularly carry out construction dust pollution prevention and control inspection and assessment, analyze the causes of dust pollution problems existing in the construction process, formulate appropriate corrective and preventive measures and tracking and implementation;
(viii) collect and organize construction dust pollution prevention and control of management information and inspection records;
(ix) laws and regulations provide for other Duties. Chapter III Prevention and Control Measures Article 12 The construction unit shall adopt the following dust pollution prevention and control measures:
(1) The boundaries of the construction site shall be set up with hard and closed enclosures, and dust suppression measures such as covering, sectional work, and timing construction shall be taken;
(2) The entrances and exits of the construction site, main roads, and material stacking sites shall be hardened;
(3) The construction site shall be equipped with the use of mobile devices in accordance with the requirements;
(4) The construction site shall be equipped with the use of mobile devices in accordance with the requirements. (C) in accordance with the requirements of the configuration, the use of mobile fog machine, spray (shower) device, sprinkler and other dust reduction equipment;
(D) equipped with the scale of the project is appropriate to the professionals responsible for sprinkling dust, removing floating soil, dust, washing the ground and vehicles;
(E) construction site earthworks and cutting, plastering, drilling, chiseling and other dust-prone operations, it should be Take sprinkling, spraying (shower) and other effective dust reduction measures;
(F) due to special circumstances require on-site mixing of ready-mixed concrete and ready-mixed mortar, should be taken to centralized closed mixing, and dust treatment;
(G) construction earth, slag, garbage should be transported in a timely manner to the designated place for disposal, temporary storage in the field, should be used to close the dust net cover dust control measures;
(G) construction earth, slag, trash should be timely transported to the designated place for disposal, in the field temporary stockpile, should be used to cover the dust net closed Measures;
(viii) the operation of the exposed ground sprinkler on time; forty-eight hours without the operation of the exposed ground sprinkler on a regular basis; more than forty-eight hours of non-operation, to take cover and other dust pollution prevention and control measures.