Laboratory renovation standard specification is which laboratory renovation skills have what

In fact, in everyone's decoration, about laboratory decoration aspects, there are a lot of normative requirements, first of all, the laboratory decoration appearance as well as the structure, it is very different from our usual residential, and the laboratory decoration period, some of the design inside is a certain specification, especially the laboratory decoration design room is also equipped with a lot of relevant Precautions, we can understand the following.

A, laboratory decoration specifications are which

1. In accordance with the needs of the experimental task, laboratory decoration, including valuable precision instruments and a variety of chemicals, including flammable and corrosive drugs. There is also if the operation often produces harmful gases or vapors. Therefore, the laboratory of the housing structure, environment, indoor facilities and other special requirements, in the preparation for the construction of a new laboratory, or the need to alter the original laboratory should be considered.

2. Laboratory room is roughly divided into three categories: precision instruments laboratory, chemical analysis laboratory, auxiliary room (office, storage room, cylinder room, etc.). Laboratory requirements away from dust, smoke, noise and vibration sources in the environment, so the laboratory should not be built in the traffic lanes, boiler room, engine room and production near the workshop (except workshop laboratory). Let maintain good weather conditions, usually should be calculated in the north-south direction.

Two, what are the methods of laboratory renovation

1. Inspection: no matter what you do, no investigation is no right to speak, and will be in the choice of laboratory design companies do not casually see small ads on the belief that we can go online and search for some of the higher visibility of the laboratory design companies, then you can Look at the word of mouth or first consult to see.

2. Design program: a perfect laboratory before the construction of up, certainly can not be separated from the better laboratory design program, so the laboratory design program is good or bad, completely able to let see the company's professional standards.

3. Case: for this laboratory design is good, is to see the project cases and site, general professional decoration laboratory design will have many projects, whether it is a model room or on-site construction cases, we can field visits, feel the effect of the use of inspection of the installation details.

Three, what are the design requirements of the laboratory

1. Precision instrument room requirements with fire, shock, electromagnetic interference, noise, moisture, corrosion, dust, anti-hazardous gas intrusion, the room temperature as far as possible to maintain a constant.

2. In order to maintain the good performance of ordinary instruments, the temperature should be 15-30 ℃, the best conditions to control the 18-25 ℃. Humidity is generally controlled at 60% -70%, a need for constant temperature instrument room can be installed double doors and windows and air-conditioning units.

3. Instrument room can be used terrazzo floor or anti-static flooring, do not recommend the use of carpet, because the carpet is easy to accumulate dust, but also produce static electricity. Bosbo large precision instrument room supply voltage will be stable, usually allow voltage fluctuations of ± 10%.

4. And in special when necessary to be equipped with ancillary equipment (such as voltage stabilized power supply, etc.). In order to ensure uninterrupted power supply, you can take dual power supply. Should be designed with a special ground.

All of the above information, is a small introduction to the laboratory renovation methods, as well as laboratory design requirements inside the laboratory with the laboratory renovation standards and specifications,