How to calculate the design cost of Xinjiang exhibition hall?

1. The engineering design fee standard is the basis for the engineering design unit to sign a contract with the entrusted task unit and perform the contract to collect design fees.

2. This fee standard is prepared by the survey and design department of the State Council, organized by the relevant departments of the State Council, and is approved and issued by the State Price Bureau in conjunction with the survey and design department of the State Council. Depending on the nature of the tasks undertaken by the engineering design unit, the charging standards of the relevant industries in this standard will be implemented respectively. All construction units, work design units, design review departments, China Construction Bank and other units should grasp and supervise the implementation accordingly.

3. This charging standard is divided into three volumes. The first volume includes: petroleum, steel, gold, non-ferrous metallurgy, building materials, machinery, chemicals and petrochemicals, medicine, textiles, light industry, transportation, radio and television, commerce, grain, forestry, civil construction, municipal administration, water conservancy and hydropower, civil air defense, Twenty-one industries including railways; the second volume includes: nuclear industry, aviation, electronics, weapons, ships, aerospace and other six industries (1984 edition); the third volume is "Engineering Survey and Engineering Design Charging Man-day Quota" The trial version covers three industries: coal, electric power, and post and telecommunications.

4. This charging standard is based on the charging standards issued by the former State Planning Commission in 1984 and 1985, and is a revised version that adjusts the unreasonable parts of the fixed fees. It still reflects the low charging standards. in principle. That is to say, this charging standard is calculated based on the comprehensive design capabilities of engineering design units in various industries and the expenditure level of the business fee system. It also takes into account the necessary expenses for technology development, business construction, personnel training, etc., as well as necessary Industrial and commercial taxes paid, etc.

5. This charging standard is mainly based on the physical fixed charging method, supplemented by the charging method based on the individual project budget. In addition, the three industries of coal, electricity, and post and telecommunications are trialling the working day fixed charging method.

6. The main contents of this charging standard:

1. Engineering design fees: generally include fees for preliminary design and budget estimates, construction drawing design, cooperating with construction according to contract provisions, design technical briefing, participation in test runs and project completion acceptance, etc. This fee does not include the cost of making construction drawing estimates.

2. Work expenses before preliminary design: These are the expenses required for preparing feasibility study reports, preparing design briefs, participating in site selection and planning, and conducting environmental pre-assessments, etc.

3. Non-standard equipment design fee: refers to the design fee for non-standard equipment. Some industry projects include equipment design, so no additional non-standard equipment design fees will be charged. Due to different industry characteristics, the scope of non-standard equipment design is stipulated by each industry.

4. Software preparation fee: refers to the preparation cost of computer control programs for the factory production process. If the industry has a fee standard for software compilation, the industry standard shall be implemented; if the industry does not have a standard, it may be agreed upon by both parties based on the use value and advanced level of the software and taking into account the actual workload of compiling the software. For other work besides the above, such as providing separate technical information, drawings, translations, calculations, etc., the charging standards will be separately formulated by the competent department or the engineering design unit.

7. If only process design or civil and public engineering design is entrusted, the fees will be calculated based on the proportion of the design workload divided by industry. When only preliminary design or construction drawing design is entrusted, the fee will be calculated based on the proportion of the design workload divided by industry and multiplied by a factor of 1.1. If the budget for preparing construction drawings is increased, the charges will be calculated based on the engineering design charge standard multiplied by a 1.1 coefficient. The engineering design fees in this fee standard are based on the design of new projects. If it is an expansion project, unless there are clear regulations in the industry, the fees can be calculated based on similar new projects multiplied by a 1.1 coefficient; for technical transformation projects, the fees will be calculated based on the complexity of the design technology. , can be multiplied by a coefficient of 1.2-1.4 to calculate the charge. For projects that require earthquake protection, when calculating based on quotas, a factor of no more than 1.2 may be multiplied based on the increase in design workload.

8. The design documents provided by the engineering design unit must comply with the depth and quality standards stipulated by the state and the competent department. The number of copies provided shall be in accordance with the regulations of each industry. The number of additional copies required by the entrusting unit shall be charged separately. Printing cost.

9. If standard design (except standard component drawings) and reused design are used in engineering design, the fee will be 20% of the new design project of the same type. If it is necessary to install a foundation or make partial modifications according to local conditions, the fee will be RMB 30 per new design project of the same type. When non-standard equipment is designed to be reused, the fee will be reduced by 20 per year starting from the year after the design is completed. If the fee after the reduction is less than the fee based on the drawings and data, the fee can be charged according to the fee standard for the drawings and data.

10. Provide engineering technical consulting services, participate in technical service work such as planning surveys, inquiries, quotations, and external negotiations, as well as work for which no specific charging standards have been formulated. Charges may be calculated based on direct production staff days. The fee is RMB 85 per working day. The calculation of working days can be based on the working day quota or determined by the designer and the client through negotiation when signing the contract based on the task conditions. For tasks that require a business trip to other places and the construction period is within 60 days, the travel expenses will be borne by the entrusting unit.

11. If the fee is charged based on the budget estimate of the individual project undertaking the design task, the calculation base shall deduct the temporary engineering fee, construction technology equipment fee and construction machinery purchase fee, and add the joint commissioning fee. The individual project budget estimate shall be based on the preliminary design estimate approved by the competent department.

12. For projects involving imported equipment, if fees are charged based on individual project estimates, the engineering design will be fully borne by us. When calculating the design cost, the equipment price will be calculated based on the price of similar domestic equipment. If there is no domestic reference price, the original price of the equipment will be converted into RMB based on the national price. For projects that involve imported equipment and are charged based on the individual project budget, if the process design is undertaken by foreign countries, the calculation base should not include the price of the process equipment; if the fee is charged based on physical fixed quotas, the proportion of the design workload divided by industry should be , deduct the corresponding design fee. The charges for corresponding domestic process design cooperation work can be determined through negotiation between the designer and the client based on the actual workload.

13. If a domestic project needs to be designed in accordance with internationally accepted design procedures and depth, because it exceeds the current domestic design depth, the design fee may be appropriately increased. The specific amount may be determined by the designer based on the actual increased workload. Determined through negotiation between the party and the entrusting party.

14. When undertaking design tasks in remote areas such as Xinjiang, if charges are calculated based on a fixed quota, the original quota can be multiplied by a factor of 1.1. When undertaking tasks in Tibet, the original quota can be multiplied by a factor of 1.2.

15. When an engineering design unit goes abroad due to the needs of the tasks it undertakes, except for the production and assembly fees paid by the design unit, other overseas expenses (including foreign exchange quota) shall be paid by the entrusting unit. For example, if the design unit When the unit itself goes abroad to study or inspect for reasons such as improving its level, the design unit shall bear its own expenses.

After the engineering design unit undertakes the task, if scientific experiments are required for the project, the entrusting unit shall be responsible for the equipment, materials and labor costs.

16. This charging standard takes into account the adjustment coefficients of various factors that affect the design workload. If two or more factors exist at the same time in the same project, the total adjustment coefficient of the project should be The sum of the figures after the decimal point of the individual adjustment coefficients is increased by 1, but the maximum value of the total adjustment coefficient shall not be greater than 1.5. If the design fee is calculated based on a fixed amount of physical objects or work days, for projects with an investment of more than 300 million yuan, the maximum fee amount shall not be greater than 1.5 of the estimated budget ratio.

17. The engineering design unit has adopted advanced technology in the design and has good economic benefits. After the design review is confirmed, the superior competent review department can decide to increase the design fee appropriately, which is generally controlled within the design fee. The fee is within 10. If the design quality and technical level do not meet the contract requirements, the design fee shall be deducted according to the contract provisions.

18. The design fee will be allocated in installments according to the design progress. After the design contract comes into effect, the client shall pay 20% of the design fee as a deposit in advance to the design unit; 30% shall be paid after the preliminary design is completed; and 50% shall be paid after the construction drawings are completed. According to the "Construction Engineering Survey and Design Contract Regulations", after the design contract is performed, the deposit will be used as the design fee. After the design fee is paid in full, the design unit shall cooperate with the construction project for the design tasks it undertakes and participate in the commissioning assessment and project completion acceptance, etc., and shall not charge additional technical service fees and travel expenses.

19. This fee standard applies to design fees for domestic investment and construction projects undertaken by design units at or above the prefecture level. When design units at the county level or below undertake design tasks, this fee standard shall be multiplied by 0.85. -0.9 factor billing. Special economic zone engineering design fees (except for national key construction projects and investment projects within the national budget) can be adjusted by the market and determined by the design unit and the entrusting unit through consultation. The design fees for foreign-invested and Sino-foreign joint venture construction projects can refer to relevant foreign design fee standards and be determined through consultation between the designer and the client.

20. For projects not included in this charging standard, the design fees will be determined by the design unit and the client through negotiation with reference to this charging standard.

Content of survey and design work

Survey:

Fast-growing and high-yielding timber forest base: small class zoning and mapping, site type and professional survey, socio-economic survey, roads and others Ancillary engineering survey.

Nursery seed orchard: site selection, adjustment (surveying) mapping, professional survey, and determination of structure location.

Aerial seeding afforestation: Sowing area survey, site type and professional survey, sowing area route and navigation point location survey.

Design:

Fast-growing and high-yield timber forest base: business zoning, determination of afforestation types, tree species planning and design, afforestation technology design, planning and design of auxiliary projects such as road fire protection lines, preparation of design instructions and planning Drawings and design estimates.

Nursery seed garden: general layout design, technical design, road drainage and irrigation engineering and ancillary engineering design, instructions and budget estimates, etc.

Aerial seeding afforestation: afforestation tree species in the sowing area, seeding rate calculation, design, routes, navigation point design instructions and budget estimates, etc.

Explanation of charging standards for civil building design

1. This charging standard includes design charging quotas and rate charging standards for various types of civil construction projects.

2. Civil buildings are divided into six levels according to their complexity. The main characteristics and scope of application of each level are as follows:

Examples of the main features and scope of engineering projects

p>

Specially classified as national key projects or extra-high-end large-scale public buildings focusing on international activities.

Small and medium-sized public buildings with national historical significance or particularly complex technical requirements.

Buildings with more than 30 floors.

Buildings with special requirements for sound and light in tall spaces.

State Guesthouse, National Great Hall, International Conference Center, International Sports Center, International Trade Center, International Large Airport, International Comprehensive Club, Important Historical Memorial Buildings, National Libraries, Museums and Art Galleries, Theaters, Concert hall, level 3 or above civil defense.

1 A high-end large-scale public building.

Small and medium-sized public buildings with regional historical significance or complex technical requirements.

Public buildings with more than 16 floors and less than 29 floors or more than 50 meters high.

High-end hotels, tourist hotels, high-end guest houses, villas, provincial exhibition halls, museums, libraries, scientific experimental research buildings (including colleges and universities), high-end halls, high-end clubs, hospitals with ≥300 beds, Nursing homes, medical technology buildings, large outpatient buildings, large and medium-sized gymnasiums, indoor swimming pools, indoor skating halls, large city railway stations, shipping terminals, terminals, photo studios, post and telecommunications buildings, comprehensive commercial buildings, high-end restaurants, level four Civil defense, five-level civilian defense combined with civilian defense, etc.

Medium-to-high-end, large and medium-sized public buildings.

Small and medium-sized buildings with high technical requirements.

Residential buildings with more than 16 floors and less than 29 floors.

Teaching buildings, archives buildings, auditoriums, cinemas, ministry and provincial office buildings of colleges and universities, hospitals with less than 300 beds (excluding 300 beds), sanatoriums, prefectural and municipal libraries, cultural centers, Children's Palace, clubs, rehearsal halls, lecture halls, wind and rain playgrounds, large and medium-sized city bus terminals, medium-sized city railway stations, post and telecommunications offices, multi-story shopping malls, specialty restaurants, high-end small residences, etc.

3 Intermediate and intermediate public buildings.

Residential buildings with elevators or frame structures with more than 7 floors (including seven floors) and less than 15 floors.

Key middle schools, secondary technical schools, teaching, experimental buildings, audio-visual education buildings, social hotels, restaurants, guest houses, bathrooms, post offices, clinics, department stores, nurseries, kindergartens, comprehensive service buildings, 1. Two-story shopping mall, multi-story canteen, small station, etc.

4 Generally small and medium-sized public buildings.

Residences, dormitories and brick-concrete buildings with no elevators below 7 floors.

General office buildings, primary and secondary school teaching buildings, single-story canteens, single-story garages, fire garages, fire stations, vegetable sales departments, grain stations, grocery stores, reading rooms, barber shops, water-flush public offices ***Toilet etc.

5 A one- and two-story single-function, general small-span structure building. Same characteristics

3. If a separate architectural design plan needs to be proposed, an additional 10% of the project design fee will be charged for the special-grade or first-level engineering architectural design plan; an additional 6% of the project design fee will be charged for the second-level engineering architectural design plan. ; The architectural design plan for Level 3 projects will be charged an additional 3% of the design fee for the project; Projects below Level 4 (including Level 4) will not be charged additional architectural design plan fees.

4. This fee standard includes the corresponding general fire protection system and architectural decoration design fees. If there are special requirements, they will be discussed separately. When carrying out special decoration design for an existing building, 3-5% of the decoration fee will be charged depending on the complexity of the decoration design.

5. This charging standard is based on a single project as the basic unit, and does not include gas, water intake, purification, sewage treatment, roads and bridges, boiler rooms, gas stations, power transformation and distribution stations, water pump rooms, and cooling towers. Including the design of individual buildings and structures such as chimneys and chimneys, the charges should be implemented in accordance with municipal and other industry standards.

6. Responsible for the planning and layout of the community, the fee is 700 yuan per hectare for more than 3 hectares. There is no charge for less than 3 hectares. However, the pipeline, greening, earthwork and other designs of the community will be charged at 1.5 of the estimated budget regardless of the size.

7. For multi-functional buildings, charges will be calculated based on the functions of the main building. Parts that are more complex than the main functions will be charged accordingly. 8. "Large" in the civil construction engineering grade table generally refers to 10,000 square meters. Buildings above; "medium-sized" refers to buildings with an area of ??3,000 to 10,000 square meters; "small" refers to buildings with a area of ??less than 3,000 square meters. The use of this classification is limited to this table.

9. When only doing preliminary design of civil buildings or phased design of construction drawings, the proportion of workload is 40 and 60.

10. The number of documents provided according to this charging standard is 6 copies of preliminary design drawings and 8 copies of construction drawings.

Reference: [1992] Price No. 375