Corporate Development of Yuanbaoshan Power Plant

In order to expand the scale of the enterprise and realize sustainable development, Yuanbaoshan Power set up a five-year development plan in 2005, and planned to start the construction of two 1,000MW ultra-supercritical coal-fired power generating units by 2010. on March 18, 2005, the Preparatory Office for the fourth phase of the project was set up, which was in charge of the preliminary preparatory work for the fourth phase of the project. on September 29, 2005, the preliminary feasibility study stage was completed. On September 29, 2005, the preliminary feasibility study stage was completed, and the preliminary feasibility study report published by Northeast Electric Power Design Institute concluded that Yuanbaoshan Power Generation Co., Ltd. is fully equipped for the expansion of two 1,000MW ultra-supercritical coal-fired generating units. The project feasibility study is currently underway.

Multiple industries that echo and are independent of power generation are flourishing. Dongyuan Power Co., Ltd. is involved in the operation of four brands: "Deman" windows, "Zhuhui" fly ash, "Bingwu" pure water, electric cloth combined with dust collector, as well as Power generation equipment overhaul, construction and installation, machinery manufacturing, automobile repair and transportation, property management, printing and office equipment maintenance, catering and entertainment, trade, health care, coal operation and storage and transportation, etc., the annual output value of about 400 million yuan.