Typhoon building rainstorm emergency plan example (General 6)
In the reality of learning, work, life, it is not guaranteed that you will encounter some unexpected events or accidents, in order to minimize the harm, it is usually necessary to prepare a good emergency plan in advance. Do you know what kind of emergency plan can actually help us? The following is a sample of my carefully organized emergency plan for typhoon prevention construction storm (general 6), welcome to learn and reference, I hope it will help you.
Anti typhoon construction rainstorm emergency plan 1
I. General
1, the preparation of the purpose
In order to do a good job of preventing and disposing of typhoons brought about by a variety of disasters, and to further improve the work of my project to defend against typhoons (tropical storms), the establishment of the work of anti-typhoon anti-typhoon procedural, standardized, institutionalized . Response mechanism to ensure that the anti-typhoon rescue and relief work is carried out in an efficient and orderly manner to minimize casualties and property losses.
2, the preparation of the basis
Based on the "Guangdong Province Typhoon Emergency Response Plan", "Dongguan City Typhoon Emergency Response Plan" and other programs, combined with the actuality of my project, the development of this plan.
3, the scope of application
This plan applies to the project typhoon disaster prevention and emergency response.
4, working principles
(1) people-oriented, prevention-oriented. Typhoon prevention work adhere to the people-oriented, safety first, the lives of employees in the first place; to be safe and secure, always prepared, prevention-oriented, prevention and resistance combination.
(2) unified leadership, hierarchical responsibility. Typhoon prevention work under the unified leadership of the company, the implementation of the project manager is responsible for the system, unified command, hierarchical sub-departmental cooperation and coordination.
(3) Response in accordance with the law, scientific scheduling. In accordance with the "Chinese People's *** and State Water Law", "Chinese People's *** and State Flood Control Law" and other laws and regulations, standardize the behavior of the typhoon prevention, the implementation of full participation, the combination of special groups, highlighting the key points, taking into account the general, the optimization of the allocation of the local interests of the overall interests.
(4) rapid response, departmental linkage. In the event of a typhoon and secondary disasters, all departments of the emergency rescue squad joint action, rapid response, timely and efficient prevention and emergency disposal. All departments should obey the unified command and scheduling of the company's typhoon and flood control headquarters.
5, the focus of the work
(1) organization of employees in a timely manner to avoid winds and dangers;
(2) organization of key areas of material safety transfer;
(3) warehouses, workers' living areas, project office buildings and other facilities of the security and flood prevention and drainage of low-lying areas;
(4) wind, rain, tide forecast prediction and early warning, and timely to employees Release typhoon information.
6, the organization and command system and responsibilities
(1) Flood Control and Drought Control Command
The establishment of the Wind and Flood Control Command (hereinafter referred to as the Project Prevention and Control) is responsible for leading the organization of the project department of the typhoon rescue and disaster relief work.
(2) the composition of the defense finger
The general director of the defense finger by the project manager, deputy director of the project general worker.
The departmental members of the defense finger are composed of the heads of the production department, purchasing department and other departments.
(3) the main duties of the defense finger
The main duties are: to carry out the implementation of laws, regulations, guidelines, policies and higher flood control and drought control headquarters instructions, orders; preparation and improvement of the Taiwan prevention plan; coordination between departments, up and down the work of checking and supervising the relevant departments to do a good job in the preparation of the Taiwan prevention (flood); organizing and carrying out the inspection of the Taiwan prevention (flood), and urge the relevant departments, units to deal with the impact of the timely prevention of Taiwan (flood), the work of the flood control department. Relevant departments and units to deal with the relevant issues affecting the safety of typhoon prevention (flood) in a timely manner; responsible for the release of the region's flood notices, announced the entry and lifting of typhoon warnings; organization of post-disaster disposal, and to do a good job of coordination work; typhoon before the typhoon, is responsible for the notification of the site to do a good job of typhoon prevention, inspection of the site's safety facilities reinforcement, evacuation, and the transfer of operating personnel;
under the leadership of the emergency response team, the organization, Command and coordinate all personnel of the project department for typhoon prevention and rescue and relief work. If necessary, report to the Humen Ordnance Repair Plant, the Ordnance Repair Plant to a higher level of leadership report and at the same time deployed to prevent Taiwan rescue and relief work.
Second, the main responsibilities of the members of the unit of the defense finger
(1) Materials Department: responsible for organizing security team members and employees to participate in the rescue, anti-Taiwan and disaster relief, is responsible for the disaster relief food, food reserves and supply. And participate in the important material and major dangers of the rescue work; at the same time do a good job of participating in the flood and Taiwan rescue coordination of various departments. Do a good job in a timely manner to the affected insured units affected by the loss of claims.
(2) Production Department: responsible for disaster relief against Taiwan and post-disaster restoration of production technology guidance, put forward disaster relief, remedial measures; undertake the daily work of the defense finger; responsible for the project personnel and material safety supervision and management and scheduling work;
(3) Safety Office: responsible for the plant to protect against Taiwan; to ensure that the drainage, drainage and flooding, flooding due to the construction of the house may be caused by the timely resolution of implementation ; do a good job of public **** infrastructure, bulletin boards, billboards, overhead hangings, street trees, yard lights, etc. to prevent the work of Taiwan;
(4) Department of Finance: the organization and coordination of rescue and relief work, responsible for flood control and Taiwan and disaster relief fund-raising, organizing, guiding and carrying out the work of disaster relief donations; in a timely manner is responsible for the receipt and allocation of disaster relief funds and materials.
(5) Equipment Division: Responsible for the rescue supplies, equipment, equipment related to the organization of Taiwan reserves, mobilization and supply. Responsible for anti-Taiwan, flooding electricity supply; timely scheduling to resolve the disaster power, repair damaged power facilities.
(6) Technical Department: during the emergency period of flood and typhoon prevention, assist in organizing the evacuation and transfer of the masses, responsible for the development and modification of emergency response plan for typhoon prevention in construction projects;
(a) Before the typhoon, responsible for notifying the construction site to do a good job to prevent the typhoon, checking the reinforcement of the site's safety facilities, evacuation, and transfer of the operating personnel;
(b) Arranging for the duty of the personnel. Inspect the construction site, immediately organize rescue and relief and aftercare work, maintain close contact with the higher authorities, and report the emergency treatment of the accident site at any time;
(c) After the typhoon, responsible for convening the relevant personnel to summarize the emergency treatment of the accident.
Third, the implementation of the plan
(a) received the news released by the meteorological station, it is expected that there is a possibility of being affected by the typhoon:
1, the project manager of the construction site issued a notice of typhoon prevention, the relevant personnel of the Ministry of the project to pay attention to listening to the meteorological news, pay close attention to the typhoon movements;
2, the project manager is responsible for notifying the The site of the relevant personnel and teams, requiring all personnel to work closely together to do a good job in the preparation of typhoon prevention.
(b) When the typhoon is approaching our city and will affect our region within 48 hours, and the weather station issues a typhoon warning:
1, the project department should reasonably arrange the construction, and stop the operation of the process that must be continuously constructed;
2, the project department should cooperate with the branch to do a good job of safety inspection before the typhoon, the inspection includes whether the construction lift is firm, whether the scaffolding and other facilities are stable, whether the temporary work shed is safe, etc., and take measures to prevent the typhoon. Temporary scaffolding is safe, etc., and take measures to reinforce and eliminate potential safety hazards.
(C) when the typhoon may hit our region within 24 hours, the weather station issued an emergency warning:
1, the project department typhoon prevention work leading group personnel in place, arrange for personnel on duty;
2, the site to stop the construction of construction, construction workers withdrawn to the safety zone;
3, the project manager organizes a tour of the site with the company's leading group Further check the implementation of the various defense measures, the implementation of the site rescue team in place, and in a state of readiness;
4, during the typhoon, the occurrence of construction site casualties in the event of safety accidents, according to the company's "major safety accidents in construction emergency rescue plan" implementation.
5, after the typhoon, the weather station issued a typhoon warning lifted, the project department should check the damage and report to the company, for the site safety facilities should be reinforced in a timely manner, and summarize the work of typhoon prevention.
(D) Typhoon warning classification
According to the meteorological department forecast, the typhoon warning level is divided into four levels: Ⅰ, Ⅱ, Ⅲ, Ⅳ, which represent the special major, major, major and general respectively.
(1) particularly significant (Ⅰ level, red warning)
Typhoon building storm emergency plan 2First, the organization and responsibilities
The hotel set up a flood and typhoon emergency response headquarters, typhoon when the command of the various organizations members must be immediately in the hotel to do a good job in the flood and typhoon response and duty work. The organization is as follows:
Commander-in-chief: hotel executive general manager
Deputy commander-in-chief: the hotel in charge of security work of the chief assistant
Member units: guest rooms, catering, front office, engineering, security, finance
Second, typhoon procedures
(a) Typhoon before the self-inspection Preparation
1, the front office: the collection of the main entrance banner and the main entrance of the lanterns and other decorations and POP notice boards; lobby or elevator entrance placed typhoon information notice boards, and ready to typhoon reminder card to the Department of Rooms with the room; ready to prepare umbrellas and rain gear, every employee in the front office should be aware of the typhoon information, and timely answer the guests inquires, ready to the front desk emergency lighting, the lobby associate should be fixed in the lobby, and do a good job of customer inquiries and the The company's main goal is to ensure the normal business order of the front office by focusing on the customer's inquiries and reporting the situation at the entrance and the lobby.
2, Rooms Department, Food and Beverage Department, Finance Department: check the closure of each room, box, aisle and hallway doors and windows; do a good job on the guest of the typhoon notification Rooms Department should be the typhoon reminder card with the room; prepare emergency lighting;
3, switchboard: responsible for understanding the typhoon situation in a timely manner to report to the leadership of the hotel and the relevant departments responsible for the preparations for the emergency lighting, walkie-talkie, and to check the switchboard Backup power supply is normal operation, and under the guidance of the department manager to do a good job in the power outage emergency services, and do a good job of the guest's inquiry service.
4, each department should be prepared 1 day in advance to report the loss of fabrics, in order to emergency use.
5, by the Engineering Department of the hotel perimeter, platforms, neon lights, billboards, satellite receivers, business departments and tenants of the doors and windows of a comprehensive inspection with wire, rope, stakes and other reinforcement of the unsound suspension should be temporarily removed. Check the underground electric room engine room and other important parts, do a good job of reinforcing the hotel door, and cut off the possibility of short-circuit triggered a fire in the circuit, the pool should be filled with water to ensure that the hotel's normal supply of water, electricity, gas, ready to prepare enough sandbags.
6, the general office is responsible for the typhoon information conveyed to all employees in all departments, the arrangement of all department heads to stay on duty.
7, the security department notified the dormitory security guards to prepare for duty, and with the engineering department to check the hotel periphery, roof and other key parts of the sewer, guttering is smooth, ready to lighting appliances and rain shoes and raincoats, safety helmets, flashlights, emergency lights, and so on.
(b) Review: by the General Office, the Engineering Department, the head of the Security Department in accordance with the above provisions of the preparations for the review of the various departments.
(C) when the wind is strong should start emergency procedures:
1, the security department, the engineering department responsible for the hotel should stay at the hotel at any time to deal with emergencies, to ensure that enough manpower and material resources to do a good job of repair and remedial work.
2, guest rooms, private rooms, cloth, liquor, food warehouse if there is water seepage, the department should immediately transfer the contents of the room to a safe place, the Ministry of Engineering to do a good job of plugging the leakage and drainage work.
3, the front door of the rain may backflow into the lobby, the security department, the engineering department will sandbags piled up at the door to prevent the inflow of PA class is responsible for additional manpower to remove the water.
4, the back door of the rain may backflow into the staff elevator, the security department, the engineering department will sandbags piled up in the back door to prevent inflow, the back door post security guards are responsible for the removal of water, such as rain has been to the elevator backflow, the engineering department should immediately control the elevator in the elevator above the floor of the 1F, prohibited to allow the elevator to run to the -1F - 2F.
5, the wind When the wind is very strong, the front door and the back door should be reinforced with wooden plugs and boards to prevent the glass door from being blown by the wind, and the reinforcement should be appropriate to keep part of the glass door open to reduce the resistance of the wind to the glass door, and the glass of the front door should be watched by the baggage handlers and the foreman of the security department*** with the same watchman. The back door glass is guarded by the security guard at the back door.
6, when the wind is very strong, the gate post security guards baggage should pay attention to falling objects and guide the guest vehicles parked in the underground garage, if necessary, wear a helmet, the front office should be placed on the front desk desk lamps, flower pots, etc. put away, so as not to be blown over.
7, if there is water in the elevator, the engineering department should immediately start the drainage system to remove the water, in order to avoid if the wind is strong, resulting in the passenger elevator can not run, the restaurant screen should be pushed to the elevator entrance to cover.
8, when encountering a power outage, the Engineering Department immediately contacted the property office to generate power to restore lighting. The Security Department maintains the hotel security order during a power outage. When the power outage restaurant cashier by the restaurant management personnel responsible for in place to guard, the main desk cashier by the Security Department front door post and 02 or 01 guard. Lobby assistant,
01, 02 should do a good job of passenger elevator service, inquiries about whether there are guests were shut off the ladder, to do a good job of being shut off the passenger elevator guests to appease the work of the floor workers and managers of the departments should be dispersed to the various floors, restaurants to the guests to do a good job of explaining and appeasing the work of the guests.
9, gutter blockage, by the Ministry of Engineering, the Ministry of Security *** with the people to be sent to unblocking, unblocking personnel should pay attention to their own safety, must wear a helmet, if necessary, should be tied to the safety rope, by two people a front and a back *** with the operation. Attention should be paid to the roof equipment layer of electrical equipment whether there is a leakage phenomenon.
10, the wind is very large, the office should be responsible for notifying the dormitory employees are prohibited from going out, in the store outside of the staff should be arranged to stay in the hotel, the office and the departments responsible for the office should be dissuaded from leaving work employees are not allowed to leave the hotel, the office should be a good arrangement for food and accommodation for the employees who are stranded.
11, the switchboard is responsible for understanding through the TV, timely report to the head of each department of the typhoon situation, such as airports, highways, bridges closed information should be reported to the front office in a timely manner, the front office should be timely to the guests of the hotel notice.
12, the typhoon larger hotel executive general manager, engineering manager, security manager, should stay in the hotel to make emergency preparations, other department managers whether to stay in the hotel should be based on the hotel arrangements, such as leaving the hotel should be reported to the hotel executive for approval.
(d) After the typhoon has caused the loss of the hotel, each department should be summarized within two days to report the loss.
Typhoon building rain emergency plan 3
First, the guiding ideology:
Typhoon, rainstorm work is related to the lives of teachers and students and national property safety is an important work, in order to effectively protect the safety of teachers and students and property safety, to enhance the kindergarten flood prevention and control of the ability to deal with the typhoon, in the spirit of "prevention first, safety first" principle, especially the development of this plan. The development of this plan.
Second, preventive steps:
1, the leading group list and contact phone number
Leader: the head of the school
Members: logistics team leader, director of the preservation of education, trade union chairperson
Kindergarten started the flood control plan, the implementation of the 24-hour leadership, 24 duty system.
Third, emergency measures:
1, to strengthen information communication, to do the top of the situation, the bottom of the report.
In the event of a major flood, all the leaders into place, flood control and Taiwan work leading group began to operate; the leaders in charge of the flood control and Taiwan work leading group to report on the flood; the full deployment of anti-Taiwan flood control work.
2, prevention-oriented:
Clear corridor. Before the typhoon landed, the balcony, corridor debris, flower pots, etc. should be cleaned up to prevent the typhoon landed, was blown down by the wind to hurt people.
Close the doors and windows. When a typhoon or rainstorm comes, the wind and rainfall are large, so you should close the doors and windows to prevent the wind and rain from damaging the doors, windows, furniture and causing casualties.
The janitor of the whole school sewer and the main catchment well to carry out a comprehensive dredging.
Unclogging of gutters and downpipes on school buildings and houses, and pruning and strengthening of large trees throughout the school.
A comprehensive safety check of lightning protection facilities and outdoor wiring on all school buildings.
Comprehensive safety inspection of outdoor antennas, air conditioning outdoor units, and external hangings.
Indoor power supply, sockets, doors and windows of all departments to do a comprehensive inspection.
When circuits and wires are interrupted due to a typhoon, power switches should be turned off and emergency lights, torches or candles should be activated.
Fourth, safeguard measures:
After the plan is activated, the kindergarten to do a good job of early warning and information records. Convene an emergency meeting, in the shortest possible time, by telephone and other forms of kindergarten flood control and Taiwan work deployment, inform the Taiwan flood dynamics, the arrangement of flood control and Taiwan, rescue and relief requirements and tasks.
At any time with the higher departments and units to maintain close contact, strengthen information communication, to do the upper situation, the lower situation reported.
Anti typhoon building rainstorm emergency plan 4
A disaster point situation
(a) xx dangerous rock body unstable slope
xx dangerous rock body unstable slope is located in the town of Liyang, behind the temple of the dragon mountain, the top of the mountain there are a few bumps of dangerous rock, affecting the temple of the dragon mountain personnel and property safety. In the event of prolonged heavy rainfall may occur landslides, in the event of prolonged heavy rainfall timely notification of the evacuation of people in the Longshan Temple.
(B) half of the mountain dangerous rock body unstable slope
half of the mountain dangerous rock body unstable slope is located in the town of Liyang Xiaolongshan south, the half of the mountain is almost vertical, the surface of the surface of a lot of raised rock, very easy to fall, dangerous rock near the Huangshan City Special Police School and residential houses. In case of prolonged heavy rainfall may occur landslides. The first thing you need to do is to get a good look at the color of the skin, the color of the skin, and the color of the skin.
Second, the emergency work leading group
Leader:
Deputy Leader:
Members:
Third, the response and action of the emergency
(a) Emergency personnel
Detecting people:
Placement:
Contact person:
Transfer personnel:
(ii) emergency response team:
(iii) emergency material reserves
The town's main flood control and disaster relief materials: 12 sets of raincoats, 12 steel helmets, folding rechargeable recording shouting microphone 4, shovels 10, sacks 100, a number of sand. The above flood control materials stored in the town apparatus room, by comrade Lin Tianyou unified deployment.
(D) emergency response:
1, the town of flood control and disaster relief leading group held a meeting to urgently inform the jurisdiction of the disaster and relief work, analyze and predict the possible emergence of larger disasters, the deployment of the jurisdiction of disaster relief work. Immediately the jurisdiction of the disaster and disaster relief work reported to the district people's government and the district flood control and drought relief headquarters, requesting support from the district government.
2, the organization of the town staff according to the degree of urgency of the flood season, the use of telephone, cell phone text messaging, shouting microphone and other means of timely notification of flood information to the residents; special emergency situation or power supply, communication interruptions, divided into households to notify the residents of disaster-prone points, especially at night when the relevant disaster may occur, to ensure the reliability of information transfer, so as not to omit a household, do not miss a person.
3, emergency personnel according to their respective job duties and tasks, received a disaster weather forecast, to be on standby at all times, not to go out, received a collection of orders, should be rushed to the designated location within 15 minutes, in accordance with the command of the rescue organization.
4, the release of the disaster. The town command office to summarize the disaster, reported to the district flood control and drought relief headquarters.
Fourth, the post-disaster relief work
1, timely production and life of self-help work conference, quickly organize the restoration of production, life and other work.
2, seriously organize the work of disaster investigation and verification, focusing on the verification of the disaster caused by the collapse of the house, especially the total collapse of households and other special victims of the loss.
3, according to the verification of the disaster, the development of disaster relief programs, step by step implementation.
Fifth, the basic requirements of flood control and rescue work and work discipline
1, the leading group of flood control and disaster relief office in the implementation of flood control during the twenty-four-hour duty system. Strict work discipline, conscientiously make a good duty record, timely reporting down. Command members in the flood control period, if there is something out of the need to leave the local, must be approved by the unit principal, and arrange for their own responsibility within the scope of the flood control work.
2, the person in charge of flood control and disaster prevention work is responsible for, must ensure that the phone is open 24 hours a day, the arrangements for the jurisdiction of the duty duty, supervise the duty record, duty handover and other work, found that the danger should be reported within 30 minutes, shall not be delayed rescue work.
3, where the flood duty and flood rescue and relief work, negligence, irresponsibility, reporting delays or personnel are not in place in a timely manner, we must seriously investigate the responsibility of the relevant personnel; serious consequences, according to the law, to investigate the responsibility of the main responsible person.
The typhoon building rainstorm emergency plan 5
First, the establishment of flood control and typhoon rescue and relief leadership group
Leader:
Deputy Leader:
Members: classroom teachers
Second, the emergency leadership group division of labor
The emergency leadership group division of labor
The first is a group of people who have been in the same situation for a long time. p> The leader of the group responsibility: in the higher authorities 'leadership, implementation of the district flood control and typhoon rescue and relief flood control headquarters instructions, the overall command of the Zihe Center Kindergarten rescue and relief work.
Deputy head of the group responsibility: according to the kindergarten appeared danger, put forward drainage, rescue program. Timely reporting to the central school security office, analysis and summary of the disaster, to provide a scientific basis for decision-making team leader. According to the instructions of the team leader, command the rescue team to carry out rescue. Organize enough emergency supplies to be delivered to the rescue school site. Contact the medical department, mobilize medical personnel, medical equipment, medical teams to participate in the school rescue and relief work. Contact the public security department to maintain school traffic order, organize the evacuation and transfer of young children and garden staff.
1, a comprehensive grasp of the disaster and all kinds of dynamic news, according to the important information reporting system in the first time to send important information about the disaster, to ensure that the information channel is open.
2, responsible for checking the implementation of the class disaster prevention measures, to maintain the normal order of the class teaching and activities.
3, in accordance with the requirements of the higher level, do a good job in the park disaster relief work, stabilize the mood of young children, so that all the work is carried out smoothly.
3, the implementation of the flood season, typhoons during the schools responsible for the various emergency measures to strengthen the flood control and rescue efforts.
1. According to the principle of "who is in charge, who is responsible for", the organization of flood and typhoon working group, the implementation of the necessary rescue measures, the strict implementation of flood and typhoon work.
2, pay attention to listen to, record weather forecasts, timely prevention work, timely closure of doors and windows and related electrical equipment.
3, encountering danger, disaster, should be based on the work plan, the organization to carry out rescue work, and immediately reported to the next level.
4, the implementation of leadership, 24-hour duty, immediately on duty to carry out flood and typhoon prevention work, and the waterlogged sections of the erection of a temporary walkway, should be quickly and independently rescue to ensure the safety of young children.
Typhoon building rainstorm emergency plan 6
First, the principle of work
In accordance with the typhoon before the arrival of the "defense" based on the arrival of the typhoon to "avoid" based on the typhoon to "save" the main typhoon after the typhoon.
According to the typhoon before the arrival of the main "prevention" to "avoid" the arrival of the typhoon, after the typhoon in order to "save" the main principle of good organization to prevent the typhoon frontal attack on emergency response.
The second organization
Weihai Airport to prevent the typhoon front attack of the emergency response work in Weihai Airport Flood Control and Typhoon Rescue Command under the unified leadership.
Third, the duties of each department
When the typhoon attacked the warning notice, in Weihai Airport Flood and Typhoon Emergency Department under the unified leadership of the Department of all departments to take action quickly, in accordance with their respective responsibilities, to do a good job of all the "prevention", "Avoid", "save" the preparation and implementation of the work. The duties of each department are as follows:
1. Airport Office: After receiving the warning notice of typhoon attack, inform the company leaders and airport departments in a timely manner. After asking the company leadership to agree, start the plan, arrange personnel on duty, assume the Weihai Airport Flood and Typhoon Rescue Command Office duties.
2. Site Command Center: After receiving the warning of typhoon attack and start the plan notification, in a timely manner, in conjunction with the Airport Construction Management Office, Mechanical Security Office and security checkpoints, to do a good job of parked aircraft, apron facilities and equipment of the tie-ups, reinforcement, or removal of the work, and timely report the situation to the Weihai Airport Flood and Typhoon Disaster Prevention and Control Command Office.
3. Aviation Management Center: After receiving the warning notice of the typhoon attack, do a good job of pre-arrival flights to prepare for the landing and the presence of flights on the transfer of the liaison matters; the navigation station site of the wind in addition to the risk of drainage and reinforcement, etc.; to do a good job of emergency communications security; in accordance with the requirements of the Bureau of the implementation of the airport air traffic control to prevent the positive impact of the typhoon plan content.
4. Mechanical Security Division: After receiving the warning notice of typhoon attack, in accordance with the requirements of the "Mechanical Security Division of the wind damage prevention emergency plan", tied up parked aircraft, special vehicles should be stored in the warehouse, can not be stored in the warehouse of special vehicles should be far away from tied up aircraft, parked in the leeward side, to set up a good brakes and add the wheelblock. Equipment and facilities on the apron should also take windproof measures to prevent collision cones into storage, traction poles and work ladders should be in storage or tethered to prevent the wind from blowing and damaging other facilities, planning program "Airport Emergency Plan to Prevent Frontal Attacks by Typhoons". Strengthen the staff on duty and keep communications open.
5. Airport Construction Management Office: After receiving the warning notice of typhoon attack, strengthen the protection of the power supply system, make good preparations for power repair, to ensure that the power supply is normal. Equipment and facilities on the apron to take windproof measures. Immediately after the gale, inspect the flight area field paths and lighting facilities to prepare for the opening of the airport.
6. Security checkpoints: After receiving the warning notice of typhoon attack, make good corridor bridge reinforcement tethering to prevent accidents.
7. Cargo Center: After receiving the warning notice of the typhoon attack, the cargo equipment and facilities outside the cargo warehouse to take windproof measures, the cargo equipment and facilities on the apron transferred to the cargo warehouse.
8. Airport Public Security Bureau: After receiving the warning notice of typhoon attack, timely fire vehicles and air defense guards all vehicles into the warehouse or parked in the leeward place, to set up the brakes and add wheel block. All the police in a state of readiness, ready to wait for the Weihai Airport flood control and typhoon rescue headquarters to participate in rescue work.
9. Other departments: according to the "Weihai Airport Flood and Taiwan Emergency Plan" ` duty requirements, standby duty, to maintain smooth communication.
Four, work requirements
1. Responsibility in place, a clear division of labor. Airport departments can be based on the "Weihai Airport Flood and Typhoon Emergency Plan" and "Weihai Airport Emergency Plan to prevent the front of the typhoon attack" to develop departmental implementation rules, clear responsibility and specific person in charge, will be determined by the plan of the various typhoon task decomposition and implementation of the specific responsible person, the formation of horizontal to the end of the work of the network and flexible and efficient liaison and response mechanism.
2. Well-prepared, strong measures. Each department should organize experienced and competent personnel to respond to emergencies according to the typhoon prevention plan. When a strong typhoon strikes the airport head-on or affects the airport, emergency personnel should be assembled at the specified time to be ready for battle, emergency supplies, equipment, transportation tools and other arrangements to the front line for emergency call. Promptly report to the municipal emergency office, contact the socialized reserves of emergency supplies, equipment and tools, etc., to prepare for emergencies.
3. Strengthen alert, timely disposal. Flood and typhoon rescue headquarters office to arrange personnel to grasp and develop the dynamics of the flood situation, encountered ultra-alert, abnormal or dangerous situation timely report, and seize the organization of evacuation, repair, reinforcement, encountered in emergency situations, in the report of the superiors at the same time, should take the initiative to take emergency measures, seize the favorable opportunity to implement the emergency disposal, eliminate hidden dangers.
4. Emergency duty, smooth communication. After receiving the warning notice of the typhoon attack, the flood control and typhoon rescue headquarters office and departments to implement 24-hour duty system, to keep the information open, the head of each department and the department responsible for the work of typhoon prevention cell phone on day and night, the whole tracking rain, water, wind, disaster and secondary disasters, timely consultation, and according to different situations to start the relevant emergency procedures.
;