Flow meter shell special equipment supervision and inspection certificate (pressure piping components manufacturing) process?

Supervision and inspection certificate information process

I. Basic unchanged information

1. quality assurance manual

2. procedure documents

3. operating instructions

4. appointment

5. welder's certificate

6. non-destructive testing personnel certificates

7. Welding process evaluation (sub-material)

Second, need to organize information

8. sales contract with the customer

9. work order production orders

10. procurement of steel pipe Flange contract

11. items to the goods delivery and inspection notification

12. goods acceptance of the inventory list

13. material re-inspection record sheet, material acceptance records

14. Original material quality certificate+(need to be stamped and signed by the supplier)

3. Design documents

15. Design drawings

16. Strength calculation of the shell

17. Records of assembling, appearance, and size checking

18. Process documents of the flowmeter shell

4. Inspection tests

19. Non-destructive testing report (Mr. Xie)

20. Hydrostatic test report (Mr. Shi came to see it personally)

21. Inspection report

22. Flowmeter nameplate design

23. Supervision and Inspection batch name and factory number and parameter

24. Piping component supervision and inspection record sheet

25. Stainless steel material

26. Requirements: PMI is hand-held chemical analysis (third party)