Should I install the security door first, or lay tiles first?

Decoration of the house is usually installed first door before laying tiles. Renovation can generally be carried out in accordance with the following steps:

The first week: for the start of construction procedures, their own measurements, pre-design and budget.

The second week: the main demolition, wooden door manufacturers to measure, the first measurement of the cabinet.

Third week: water and electricity remodeling, bathroom waterproofing.

The fourth week: the main material into the carpentry.

The fifth week: tiling (installation of window sills, floor drains), installation of sleeve hood cabinetry second measurement.

Sixth week: brush wall paint, kitchen and bathroom ceiling.

Seventh week: gas, cabinet installation (while installing the sink, gas stove).

Eighth week: wooden door installation, flooring installation, wallpaper (radiator installation).

The ninth week: switch and socket installation, lighting installation, hardware and sanitary ware installation, window pole installation, cleaning and cleaning.

The tenth week: furniture into the field, home appliance installation, home accessories, moving.

Installation of the door must be planned and measured well in advance, because the customized door will use up a month of time. In accordance with the above steps in the eighth week when the door is installed first, and then the floor to tile, so that you can avoid damage to the tiles and pollution. Floor installation need to pay attention to the following issues:

1, flooring installation before, let the manufacturer door to door survey of the ground whether the need for leveling or partial leveling.

2, before flooring installation, the ground should be clean and dry. On the second day of flooring installation, you can about wallpaper paving. It is recommended that the day of wallpaper paving, the floor first to do protection.

Expanded

Acceptance of the renovation

Do a good job of acceptance after the renovation, mainly look at the flooring, electrical appliances, lamps and lanterns, wallpaper, wall corners, sanitary ware and other aspects.

1, floor inspection, acceptance inspection to ensure that the ground is clean, dry, stable, flat, no floating soil exists, to ensure that the floor surface is smooth, no damage to the paint, no obvious scratches, no obvious noise in the main walking area;

2, electrical inspection, to see if there is a power line connector wire exposed, to see if it is connected to the ground, to see if the air conditioning is installed in the head of the bed, the end of the bed Above or door diagonally across the corner;

3, lamps and lanterns check to see if the insulation is good, especially in the kitchen and bathroom, see if the chandelier hangers are iron expansion bolts, check out the plastic expansion tube to be replaced immediately, because the plastic expansion tube is easy to aging for a long time;

4, wallpaper check, with a squeegee from the top to the bottom, from the inside to the outside, gently scrape the wallpaper, if the air bubble and the glue too much to squeeze out, then the wallpaper is not suitable for use. If too much glue can not be squeezed out, resulting in uneven wallpaper, should let the decorator to replace;

5, corner check, whether the wall has cracks, whether there is a block raised, whether the wall is seepage;

6, sanitary ware check, pay attention to the sanitary ware firm, check the pipeline interface tight, the hole of the drain plug should try to align the sink overflow holes, after the set of drainage plugs should be lower than the bottom of the sink, the drain plugs should be set after the end of the bottom, the drain plugs should be set to the bottom of the tub. Check the bath tub cold, hot water faucet or mixer faucet height is 150mm above the bath tub plane, shower head height above the ground is higher than the highest height in the family.