1. Installation of warehouse boards: Lock hooks and sealant should be used to fix the warehouse boards to ensure that the warehouse body is flat and has no hollow feeling. After all the warehouse boards are installed, adjust the top and bottom. Flatness in between.
2. Installation requirements for air coolers: It is best to install the air cooler at a location with the best air circulation. The air cooler should maintain a certain distance from the storage board, which is generally greater than the thickness of the air cooler. For example, if the thickness of the air cooler is 0.5m, the minimum distance between the air cooler and the storage board must exceed 0.5m. After the air cooler is installed, sealing tape should be used to seal the holes to prevent cold bridges and air leakage.
3. Before installing the refrigeration unit, you should choose what kind of refrigeration unit to install. Generally, small cold storages are equipped with fully enclosed refrigeration units, while medium and large cold storages are equipped with semi-enclosed refrigeration units. After the refrigeration unit is installed, a matching oil separator needs to be installed and an appropriate amount of oil should be added. If the preset temperature of the cold storage is lower than minus 15°C, refrigeration oil should also be added. In addition, a shock-absorbing rubber seat should be installed at the bottom of the compressor, and a certain maintenance space should be left around to facilitate maintenance and inspection. Professional cold storage engineering companies are particular about the overall layout of the unit, and the colors should be uniform, and the installation structure of each unit model should be consistent.
4. Pipe installation: The diameter of the pipe must meet the design and use requirements of the cold storage and maintain a certain safe distance from each equipment. The installation position also needs to be adjusted according to the actual conditions on site.
5. Installation of electrical control system: Each connection point must be marked to facilitate future maintenance and testing; therefore, the wires must be fixed with tied wires; moisture-proof work must be done to prevent short circuits caused by water intrusion into the wires. .
6. Cold storage debugging: When debugging the cold storage, you need to first confirm whether the power supply voltage is normal. In many cases, users call for repairs because the voltage is unstable and cannot start the cold storage normally. Then check the equipment. According to the opening and closing conditions, inject refrigerant into the liquid storage tank, and then run the compressor. Check whether the compressor is working normally and whether the three-box power supply is working smoothly. After reaching the set temperature, check the operation of each part. After everything is normal, the debugging work is completed and the cold storage engineering company submits the debugging order to the user for final confirmation. (Cold Storage Home)