2017 project safety officer position responsibilities and workflow
The safety officer should establish a registration ledger for special types of work and hazardous operations personnel, and do a good job in a serious and timely manner to report the statistics about safety production activities. The following is the 2017 project safety officer job responsibilities and workflow that I have organized for you.
Safety Officer Job Responsibilities
1, conscientiously implement the implementation of construction safety production laws and regulations, adhere to? Safety first, prevention first, comprehensive management? The policy, the implementation of the production safety regulations.
2, participate in the preparation and review of safety, civilized construction management programs, measures, etc., and participate in the preparation of safety, civilized construction-related measurement costs.
3, is responsible for construction site safety production daily supervision and inspection, and make inspection records, the construction site of hidden safety hazards ordered rectification.
4, timely organization to participate in various types of safety activities and related training, sound safety management accounts.
5, to assist the project safety and civilization publicity planning, participate in the selection of provincial and municipal civilization site information collection and finishing.
6, supervise the project department to do a good job in the division, sub-project safety technology delivery work; organization of the team to carry out safety activities.
7, supervision and inspection of the use of labor protective equipment, to stop illegal operation, illegal command behavior, the operators to correct, investigate and deal with violations.
8, responsible for the project operators admission education and three-level education management, supervise the project department to do all kinds of safety education.
9, the establishment of special types of work and hazardous operations personnel registration ledger, conscientiously and timely to do a good job of statistical reporting of safety activities.
10, to complete other work assigned by the leadership.
Safety Officer Workflow
A safety management
1, to assist the project manager to establish the project safety management organization.
2, to assist the project manager to establish the production safety responsibility system.
3, safety education.
(1), three-level education: branch safety section education? Project education? Shift education
Branch education:
Educator: branch deputy manager in charge of safety (must have the appropriate qualifications).
Recipients: company employees (project leaders, managers, workers, etc.).
Project education:
Educator: project manager or full-time safety management personnel of the project department (must have the appropriate qualifications).
Receiver: project staff (managers, workers, etc.).
Shift education:
Educator: part-time safety officer or shift leader of the shift. (Must have the appropriate qualifications)
Recipient: shift operators.
(2) Entry education for new workers.
(3) Safety technical delivery:
①, safety technical delivery must be delivered in parts by work type. Construction conditions change, there should be targeted supplementary content; winter and rainy season construction should be for the seasonal climate characteristics of the safety of technical delivery. Project stoppage for some reason, the resumption of work should be re-conducted technical safety briefings.
②, safety technology must be carried out before the process of construction, and to ensure that the delivery level by level to the construction team all operators. Construction organization design (construction program) submission order: the project technical director - project construction management personnel; division construction program submission order: project construction management personnel? Team leader; Sub-construction program submission order for the project construction management personnel? Team leader? Operators.
③, the safety technology must be targeted, guidance and operability, both sides need to be signed in writing to confirm, and each hold a set of written information.
④, the safety of the technical submission of written information from the construction organization design and special construction program, submission of information should be subject to the supervision of the project full-time safety management personnel. Safety managers should review the accuracy, comprehensiveness and relevance of the safety technical submission and archive.
(4), with the project technical person in charge, the project staff for safe production, safety knowledge, safety skills, safety regulations and legal education, and this regular popularization of education throughout the whole process of management.
(5), the use of new technologies, new processes, new equipment, new materials and transfer of jobs, the operator to carry out the operation of new technologies and safety education for new jobs.
4, is responsible for supervising the project department and labor subcontracting units signed "labor subcontracting safety management agreement", "temporary electricity safety management agreement", and require all laborers involved in the project to purchase personal accident insurance, insurance purchase before entering.
5, the establishment of safety management information.
6. Monthly safety report.
7, participate in the review of construction organization design (construction program) and safety technical measures plan.
8, the organization of safety activities and regular safety inspections.
(1), serious, detailed safety inspection records;
(2), put forward the rectification program, the rectification work includes hidden danger registration, rectification, review, cancel.
9, work accident statistics, analysis and report, participate in the investigation and treatment of work accidents, adhere to the ? The principle of "four don't spare" is generally followed. principle, generally in accordance with the following steps:
(1), quickly rescue the injured and protect the scene;
(2), the establishment of an investigation team to carry out investigations;
(3), on-site investigation;
(4), analyze the cause of the accident, to determine the nature of the accident;
(5), to prevent the recurrence of similar accidents to develop measures;
(6), write an investigation report;
(7), the trial and conclusion of the accident.
Second, the site situation and information
1, before the start of construction to carry out on-site investigation of the site, familiar with the construction site and geological features (geological survey report), should understand the surrounding pedestrian flow and social conditions, there should be a public security police station, medical units, government agencies, the resident status and linkage. Construction of the general layout of the map sent for review should meet the requirements of the local safety supervision department.
2, before the start of preparatory information:
(1) participate in the preparation of the construction organization design. (The relevant safety needs to be in line with the actual situation of the project)
(2) Participate in the preparation of the construction of temporary electricity and water program.
(3) safety and civilization construction program.
(4) participate in the preparation of earth excavation program (foundation excavation more than 2m).
(5) Participate in the preparation of foundation pit support construction program.
(6) Participate in the preparation of collapse prevention and fall prevention program.
(7) Emergency plan for safety production accidents.
(8) Seasonal construction program (winter, rainy season, summer).
(9) Emergency drills for safety accidents.
(10) Hazard identification and risk factor questionnaire.
(11) List of major sources of danger and control plans.
(12) Management of major sources of danger.
(13) Management program for major hazard sources.
(14) Major hazardous sources management ledger.
(15) List of safety laws and regulations and standards.
Third, the construction site and temporary construction safety and civilization
1, according to the site master plan layout of civilized construction:
(1), fences:
(1), the height of the site and temporary construction of fences around the height of the main roads in the urban area should be set up height of not less than 2.5m, the general section of the road set up not less than 1.8m
②, the gate should be set up in accordance with the company's unified requirements, there should be a doorman, and develop a doorman system.
(2), the construction site:
According to the site layout plan for right-of-way hardening construction, construction right-of-way should be through the entire site; the project department and site entrances and exits, offices, dormitories, kitchens, bathrooms, material storage areas, processing areas, warehouses and other floors should be hardened.
(3), site fire prevention:
①, the site layout of the construction task at the same time as the layout of the fire prevention requirements, material processing areas, hazardous materials warehouse, power distribution room and other important parts of the system on the wall. Equipped with a sufficient number of applicable fire extinguishers.
②, general temporary facilities area every 50m2 equipped with a 10 L fire extinguishers, carpentry room, machinery storage room every 25m2 should be equipped with a suitable fire extinguishers, storage of oil, hazardous materials warehouse should be equipped with a sufficient number of types of fire extinguishers. (Dry powder fire extinguishers are suitable for fighting fires in petroleum, petroleum products, paints, organic solvents and electrical equipment; foam fire extinguishers are suitable for ethers, alcohols, esters, ketones, organic acids, heterocyclic and other polar solvents in fire hazardous places; carbon dioxide fire extinguishers are suitable for fighting fires below 600 volts in the places of electrically powered electrical appliances, valuables, equipment, library materials, instrumentation and other places of incipient fire, as well as fires in general flammable liquids; 1211 extinguishers are suitable for fighting fires in the places of incipient fires, as well as fires in general flammable liquids. 1211 fire extinguishers are suitable for extinguishing flammable liquids and combustible liquids, combustible gases).
③, should strictly implement the three-stage fire approval system, in the conditions of the fire certificate, operating license, fire equipment is complete, the guardian throughout the strict performance of their duties.
(4), the site signage:
①, the main entrance to the site should be ? Eight signs and a map? Signage.
②, the main entrance to the site should be a bulletin board, newspaper reading column, blackboard, bulletin board.
③, signs, columns standardized and neat, should be consistent with the company's unified design and planning requirements.
④, the site of the main area of the lot must be set up safety signs, and according to the nature of the area, the lot can be set up tips, instructions, prohibited, warning and other signs, hanging with the site in line with a variety of slogans.
(5), health care first aid:
①, in accordance with the requirements of civilized sites, the site should have a health room, should be equipped with a medicine cabinet.
②, the site should have first aid program and first aid equipment.
③, the site should be trained first aiders.
(6), environmental protection:
①, there should be anti-dust and anti-noise measures.
②, night construction should apply for a night construction license.
③, the construction site is strictly prohibited to burn any garbage waste.
④, the site, the road should be cleaned every day.
2, living area in line with the safety situation:
(1), dormitory:
①, is strictly prohibited to build temporary dormitory in the construction project.
②, construction work area should be clearly divided with office and living area.
③, around the dormitory should maintain a good health environment, fixed, regular cleaning dormitory public **** area. The dormitory area should be set up with the necessary `living facilities.
④, the dormitory should be kept neat and tidy, living supplies placed neatly.
(2), security, comprehensive management
The project department should establish a strict security system, and dormitory management system is set up in the dormitory area together with the conspicuous place, the system responsibility should be decomposed to the person.
Fourth, on-site construction safety should be in line with the requirements of the construction program content:
1, check the program:
①, the foundation of the construction must have a support program or construction organization design.
②, for the geological situation and the surrounding environment, pit support program or construction organization design must be clear targeted measures (such as monitoring programs, excavation programs, etc.), clearly given control parameters.
③, excavation depth of more than 5m trench or pit, or excavation depth is not more than 5m, but the geological situation and the surrounding environment is more complex pit or trench, must be qualified design unit for special support design or special construction program by expert verification.
④, the support design or special construction program must be approved according to the company's internal management regulations.
2, earth excavation:
①, excavator operation radius is strictly prohibited construction personnel, must do a good job on the mechanical driver's written safety and technical briefing.
②, excavator drivers must be licensed.
③, earthwork should be strictly in accordance with the program for construction. Soft soil pits or trenches should be excavated in layers of uniform stability balance. If the layered thickness is thicker, must be in accordance with the support program or construction organization design requirements of the slope height to stay slope.
3, groove, pit wall support:
①, slope excavation trench, pit, slope must be in line with the proportion of support program or construction design requirements, should be based on the geological report on the stability of the slope calculation.
②, through monitoring and observation, found that abnormal changes in the support system (such as sudden seepage of the trench wall, water leakage or cracking of the soil on the edge of the trench, etc.), we must analyze the causes in a timely manner, the system and the implementation of appropriate measures.
4, drainage measures:
The pit, outside the pit must take effective drainage measures. According to the requirements of the support program and support design or construction organization design, the pit should be light well point precipitation or other methods of precipitation. Outside the pit should use open ditch drainage to prevent water from entering the pit, and at the same time to prevent excessive seepage of water outside the pit into the ground to increase lateral pressure.
5, slot, pit side load:
The construction process must be arranged according to the design requirements of the slot side distance of the pit side of the accumulation of water, piles of materials and transportation vehicles driving, mechanical equipment construction, etc., so that the slot side of the ground load caused by the lateral pressure is reduced to a minimum.
6, edge protection:
Depth of more than 2m trench, the edge of the protective railing must be set up, and the use of mesh net closed, the railing should be set up strong and firm. The railing is suitable for use of steel pipe, the surface of the spray yellow and black paint marking.
7, temporary electricity construction:
(1), check the program:
①, temporary electricity construction design must be prepared by the project leader and the company's competent department for review, approval and report to the supervisor for approval.
②, should be targeted, to carry out load calculation, distribution line design, grounding or zero protection measures, safe electricity and electrical fire prevention measures.
(2), the site implementation:
Temporary site electricity must be used TN-S system, set up a special protective zero line, requiring the use of five-core cable distribution system using ? Three levels of distribution and two levels of protection? A machine, a gate, a box, a leakage protection? Each piece of equipment has its own dedicated switch box provisions, thus improving the essential safety of temporary electricity.
⑶, grounding and zero protection system
①, site grounding and repeated grounding must meet the requirements.
②, TN-S system should be used.
③, the special protective zero line set with meet the requirements.
④, the protective zero line and the working zero line shall not be mixed.
(4), distribution boxes, switch boxes
①, should be consistent with the ? Three levels of distribution and two levels of protection? requirements.
②, switch box (final) should be leakage protection, the protector must be effective.
③, leakage protection device parameters should be matched with the site power consumption.
④, the electrical box must be set in the isolation switch.
⑤. A machine, a gate, a leakage, a box? Should be in line with the provisions.
⑥, floor-mounted distribution boxes and switch boxes, set the location should be flat and high above the ground, the neighborhood shall not be stacked debris.
⑦, distribution boxes and switch boxes installed in the electrical equipment should be intact, and the action is flexible, good and reliable, the contacts should not be ablative phenomenon.
⑧, the electrical box should be installed doors, locks, and rain measures.
(5), distribution lines:
①, the wire should ensure that the integrity of the aging, damage should be wrapped.
②, line aisle should be protected.
③, the buried depth of the pole should be 15% of the length of the pole plus 0.3m, but in the soft soil at the appropriate increase in the buried depth or the use of chuck and other reinforcement.
④, the overhead line must be insulated copper or insulated aluminum wire, the overhead line must be set up on a special pole, it is strictly prohibited to set up trees, scaffolding.
⑤, the construction of electricity must use five-core cable, do not use four-core wire plus a wire instead of five-core wire.
⑥, cable buried depth of not less than 0.6m, and in the cable line up and down each evenly paved not less than 50mm thick fine sand, and then covered with bricks and other hard protective layer.
⑦, rubber cable line overhead, should be set along the walls or poles, and fixed with insulated card, fixed spacing should ensure that the rubber cable can withstand the load brought about by self-weight.
V. Safety inspection
1, regular inspection:
(1), weekly inspection should be responsible for the project manager should be organized to participate in the project's safety personnel and related personnel, on-site safety inspection, fill out the "safety hidden danger rectification notice".
(2), the safety officer should be daily safety patrol inspection of the construction site, and regularly fill in the inspection records.
2, professional or special inspection:
(1), professional inspection should be organized by the project professionals, on-site safety protection, electrical safety, machinery safety, fire safety special inspection, fill out the "Notice of Safety Hazards".
(2), flood control safety inspection should be organized by the project flood control leading group, after the inspection to the branch and the higher authorities to report the inspection.
3, seasonal inspection:
(1), each project should be organized by the project manager of the relevant personnel, targeted safety inspection of the construction site once a month.
(2), the project manager to organize the relevant personnel once a week on the key parts of the implementation of monitoring and inspection, by the team safety officer and the post responsible for the daily implementation of monitoring and inspection of the key parts of the team post.
Six, information entry
1, operating personnel management:
This entry, the contract number and contract name, etc. by the other departments to enter, the safety management needs to enter the details of the laborers, such as special types of work, special types of operating certificates to be uploaded together.
2, integrated management:
This entry, only a module of the integrated management of safety, entry of the project developed by the system, temporary programs, plans, site regulations and safety management agreement.
3, safety planning:
(1), preliminary preparations: this entry is divided into accident insurance and safety supervision of two modules, accident insurance, timely collection and organization of the purchase of insurance documents, should be entered in a timely manner the insurance policy, the list of insured persons and the amount of insurance, such as late changes in the project personnel, should be handled in a timely manner for the personnel to change the approval of the application and uploaded in a timely manner; the project before the project began, the project manager should be timely to the required information to be submitted to the project manager. Before the start of the project, the person in charge of the project should submit the required information to the safety supervision organization in a timely manner, with the safety conditions approved after the start of the work to issue the "Safety Supervision Book", the safety officer is responsible for the collection and storage, uploaded in a timely manner, and write down the safety supervision number.
(2), safety accountability: this entry *** sub-nineteen small items for the project to develop part of the management system, safety rewards and penalties provisions and safety management network diagrams, etc., should be developed system by system, with the project leadership team public **** study of various types of systems and management regulations, determined to be uploaded in a timely manner.
(3), the project security responsibility is divided: according to the "Ministry of Construction Safety Inspection Specification", fill in the project each inspection area in charge of the leader, the responsible person, the relevant responsible person.
(4), safety technology measures program: this entry item safety management planning program in the entry project "project safety and civilization planning book", timely collection and collation of various types of programs for uploading and entry; construction site responsibility division of the construction site by the project leadership team to negotiate the construction site regional division of the development of the regional responsible person responsible for the division of the safety officer collection and collation of informing the person responsible for the region and timely uploading and entry.
(5), safety management work plan: the development of monthly, quarterly, annual work plan and upload entry.
(4) Safety target and assessment: After the project starts, the safety target responsibility signed with each port of the project as well as the safety assessment test questions for workers and project management personnel will be collected and organized, and uploaded and entered in a categorized manner.
5, sources of danger and hazardous operations management: this entry, according to the actual project will be prepared by the "Identification and Evaluation of Dangerous Sources" table for uploading entry, such as the site of the hazardous sub-part of the project, timely collection of the project chief worker to prepare and after the approval of the special construction program (or after the expert demonstration), as well as the hazardous sub-part of the project safety operations management for uploading entry.
6, safety inspection and rectification: this entry, mainly by the project manager of the organization of the production safety inspection, the safety officer of the special inspection, unscheduled inspections, etc., the inspection records will be uploaded in accordance with the classification of the entry, after the inspection of the traces left behind the "notice of rectification of hidden safety hazards," the same reply to a single uploaded into the entry.
7, safety management activities: this entry is mainly for the project organization of production safety activities and the company and the higher units initiated by the production safety activities process entry, the need to collect relevant information in the process of the activities and uploaded in a timely manner, after the end of the activities to summarize and uploaded into the entry.
8, safety education and training: this entry, education and training program refers to the start of construction, for the construction process of various types of education to play the role of the effect and purpose of the preparation and review by the project director for uploading entry, education and training records should be carried out in accordance with the training program for education, and do a good job of signing the record, the safety officer to collect and organize uploaded into the entry.
9, subcontracting management: collect and organize all kinds of subcontractor information, qualification level and signed with the subcontractor of the "labor subcontracting safety management agreement", "temporary electricity safety management agreement" for uploading and entering.
10, emergency management: emergency plan, the comprehensive emergency plan for uploading entry, combined with the actual situation on the site, for various types of safety accidents to prepare the project department special plan, after review by the project chief uploaded into the entry; will be organized by the project emergency drill records and photos uploaded into the entry in a timely manner.
11, accident management: this entry, the project such as the occurrence of safety accidents, the cause of the accident, the process, the results of treatment and the list of injured people for detailed entry; project casualty statistical reports, should be reported before the first day of each month, the last month of the project safety, by the branch office in charge of the deputy manager of the review and upload entry.
12, safety cost management: the project should be started according to the total cost of the project on the safety of the special funds invested in the classification of the plan, and the construction process for the safety and civilization of the construction of the costs incurred for the statistics and uploading, (safety costs by the part of the materials section for purchase or lease, such as cable, steel pipe, distribution boxes, etc., should be at any time with the project materials supervisor to communicate with the contact and statistical costs);;. According to the project awards and penalties system generated by the fine sheet and reward information should be uploaded in a timely manner to enter.
13, fire protection and occupational health management: this entry involves the need to collect relevant certificates of conformity, test reports, health certificates and other relevant information with the project materials and equipment department, logistics management personnel, should be collected and organized in a timely manner and uploaded into the entry.
Information entry note: In the entry process, most of the need to enter the original hand-signed form information, information entry platform is set up in the built-in photo, but is not practical, you can use a cell phone to take a picture and then imported into the computer and then uploaded.
;