Standard Edition of Construction Labor Contract (I) Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Based on the principle of voluntariness and equality, Party A and Party B, through consultation, hereby sign this contract for mutual compliance.
I. Term of the Contract
From _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ If the terms of the contract need to be changed, the contract change procedures should be handled in time.
Second, work.
Party A arranges Party B to work in _ _ _ _ _ _ _ _. Party B shall complete the tasks on time, in good quality and in good quantity as agreed in the Labor Contract.
Three. Working conditions and labor protection
Party A shall provide Party B with a safe and hygienic working environment in line with national regulations, and ensure that Party B's personal safety and body are not endangered.
Party A shall provide Party B with necessary labor protection articles according to the actual situation of Party B's post and the labor contract.
Four. working hours
If Party A really needs Party B to work overtime for work reasons, it shall be handled in accordance with relevant regulations.
Verb (abbreviation of verb) labor remuneration
Party B's salary shall be settled according to the following _ _ _ _ _ method according to the progress of the construction period:
(1) Pay the salary on time, with a daily salary of _ _ _ _ _ yuan or a monthly salary of _ _ _ _ _ _ yuan;
(two) according to the construction area, _ _ _ _ _ yuan per square meter;
(3) Others: _ _ _ _ _ _.
If the salary is settled according to the progress of the construction period for more than one month, under normal working conditions, Party A shall pay the living expenses of not less than _ _ _ _ _ _ _ yuan per month, which shall be deducted when the project is actually completed.
Social insurance of intransitive verbs
Both parties must participate in social insurance.
Seven, labor discipline
Party B shall abide by national laws, regulations, construction specifications, safety and other rules and regulations.
If Party B violates labor discipline and relevant rules and regulations, Party A may criticize, educate and punish Party B until the labor contract is terminated.
Eight. The labor contract can be dissolved after the terms of dissolution and non-dissolution are agreed by both parties through consultation.
In any of the following circumstances, Party A may terminate this contract:
(a) during the probation period, it is found that it does not meet the employment conditions;
(2) Serious violation of labor discipline or Party A's rules and regulations;
(3) Serious dereliction of duty and graft, which has caused great damage to the interests of Party A;
(4) being investigated for criminal responsibility or reeducation through labor according to law.
Under any of the following circumstances, Party A may terminate the Labor Contract, but it shall notify Party B in writing days in advance:
(1) Party B suffers from illness or non-work-related injury, and is unable to take up his original job after the medical treatment expires, nor can he take up other appropriate jobs arranged by Party A;
(2) Party B is not qualified for the job, and is still not qualified for the job after training or post adjustment;
(3) The objective conditions on which the labor contract was concluded have changed greatly, which makes the original labor contract impossible to perform, and the parties cannot reach an agreement on changing the labor contract through consultation;
(4) During the legal rectification period when Party A is on the verge of bankruptcy or has serious difficulties in production and operation, it is really necessary to lay off employees.
In any of the following circumstances, Party B may notify Party A to terminate the Labor Contract:
(1) is in the probation period;
(2) Party A forces labor by means of violence or illegal restriction of personal freedom;
(3) Party A fails to pay labor remuneration or provide working conditions as agreed in the labor contract;
(4) If Party B needs to resign due to other circumstances, it shall notify Party A in writing before _ _ _ _.
Under any of the following circumstances, Party A shall not terminate the Labor Contract at will:
(1) Being injured at work and within the prescribed medical treatment period;
(2) Female employees comply with family planning laws and regulations during pregnancy, childbirth and lactation;
(3) Other circumstances stipulated by laws, regulations and rules.
Nine. Liability for breach of labor contract
If either Party A or Party B violates the labor contract, it shall pay a penalty of RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
X. labor disputes
When a labor dispute arises between Party A and Party B due to the performance of this Contract, both parties may settle it through negotiation, or apply to the local labor dispute mediation committee for mediation, and the construction administrative department shall mediate.
If negotiation fails, the parties concerned shall apply to the _ _ _ _ Labor Dispute Arbitration Committee for arbitration. Anyone who refuses to accept the arbitration award may bring a lawsuit to the people's court within 15 days from the date of receiving the arbitration award.
XI。 Other agreements
The annex to this contract is an integral part of this contract. This contract and its annex are made in triplicate and come into effect after being signed and sealed by both parties. Party A and Party B each hold one copy, and Party A publicizes one copy.
Party A (signature): _ _ _ _ _ _
Party B (signature): _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model Construction Labor Contract Standard Edition (II) Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _
According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties reached an agreement on the use of engineering services in this project and signed this contract.
I. Project Department: _ _ _ _ _ _ _ _ _ _ _ _
Two. Project name: _ _ _ _ _ _ _ _ _ _ _ _
Three. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Four, labor construction content:
Verb (short for verb) duration
Employment start date is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Settlement method of intransitive verbs: the following settlement methods are adopted.
The first settlement method: lump sum unit price. According to the "93" budget quota to calculate the construction area, the unit price per square meter is _ _ _ _ yuan. Determine the final settlement price according to the construction area of Party B multiplied by the lump sum unit price.
The second settlement method: hourly wage. The wage standard of Party B is RMB/day. Party A will calculate the final settlement salary of Party B after multiplying the actual attendance days of Party B by the salary standard.
The third settlement method: piece rate. Calculate the fixed man-days of Party B's actual construction content according to the "93" budget quota regulations of Shanghai, and the settlement standard is RMB/man-day. Determine the final settlement price according to the fixed working days multiplied by the settlement standard.
The fourth settlement method: _ _ _ _ _ _ _ _ _ _ _ _
Total Labor Contract Price: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1. No matter which settlement method is adopted above, Party A shall pay the living expenses to Party B first. The specific payment method is: once a month from the month following the signing of this contract, and the standard is RMB/person. After Party B completes all the construction contents of this contract and meets the requirements stipulated in this contract, Party A will pay all the settlement balance to Party B at one time after the settlement amount is confirmed by both parties. If the construction period of Party B spans the Spring Festival, Party A shall settle 80% of the labor wages of the completed project to Party B 20 days before the Spring Festival, and the remaining 20% shall be settled in one lump sum after Party B completes the construction contents of this contract.
2. If Party B undertakes the construction content other than this contract, it must obtain the written consent of Party A in advance and sign with Party A within 7 days afterwards, otherwise Party A will not settle the salary.
3. The increase of Party B's personnel must obtain the written consent of Party A, otherwise Party A will not settle the salary for the increased personnel.
4. After Party B's construction, if the labor cost exceeds the total contract price, the excess shall be borne by Party B..
Seven, quality:
Eight, civilized construction, standardized management
Party B must meet the requirements of first-class civilized construction site at the construction site; Must meet the requirements of chemical industry standards.
Nine. Responsibility of both parties
(I) Party A's responsibilities
1. Prepare the construction organization design and construction scheme, conduct on-site disclosure, construction disclosure and three-level safety education for Party B, and provide construction drawings.
2. Provide temporary construction facilities, water and electricity supply, and provide accommodation for Party B's personnel.
3. Handle temporary residence permits, badges and other relevant certificates for Party B's personnel.
(II) Party B's responsibilities
1. Party B must obtain the approval of Party A before entering the site. Party B must submit or handle relevant certificates (copy of ID card, temporary residence permit, work permit, employment permit, etc.) before entering the site. ) to ensure the authenticity and validity of the documents provided.
2. Before Party B enters the site, it shall determine its responsible person and sign a power of attorney to authorize its responsible person to settle accounts, receive wages and handle related affairs on its behalf.
3. Ensure the authenticity of all information provided to Party A, prohibit fraud and maintain the normal operation and management order of the company.
4. Organize the construction in strict accordance with Party A's construction organization design, disclosure and scheme, and obtain Party A's written consent when making changes, otherwise Party A has the right to refuse to accept and settle the salary.
5. Party B's personnel must wear badges when entering or leaving the site and living quarters, and shall not bring irrelevant personnel in or out of the site and living quarters, and shall not enter the construction site after working hours.
6. Party B shall organize the construction in strict accordance with the monthly node schedule approved by Party A to ensure the project progress. If Party B fails to complete the plan on schedule, Party A may take corresponding measures to ensure the progress, and the expenses incurred therefrom shall be borne by Party B. If Party B fails to complete the plan for two consecutive months, Party A may unilaterally terminate this contract, and the losses incurred therefrom shall be borne by Party B. ..
7. In the process of construction, Party B's personnel must obey the management and command of Party A, enhance self-management awareness, and achieve safe and civilized construction.
8. Before entering the site, Party B must truthfully inform Party A of its health status, including whether there are any diseases that affect the construction of this type of work and the health of others, such as disability and infectious diseases. If a safety accident is caused by Party B's disability, all consequences shall be borne by Party B; After entering the site, if Party A finds that the health condition of Party B's personnel is not suitable for site construction, it must leave the site unconditionally.
9. Party B must abide by Party A's labor and employment management system, and Party A has the right to dismiss if it does not meet Party A's requirements.
10, the construction shall be organized in strict accordance with the construction technology, and the next working procedure shall not be carried out without the acceptance of Party A. ..
1 1. If there is any objection to Party A's requirements, it can be settled through negotiation.
12. Party B violates national laws and Party A's rules and regulations and disrupts production, life and social order. Party B shall bear all responsibilities and leave unconditionally.
X. Engineering quality and acceptance
1. The acceptance is based on mandatory standards and specifications such as "Standards for Quality Evaluation of Construction Projects" formulated by the state and local governments.
2. If national or local mandatory standards or specifications are issued during construction, new standards or specifications will be implemented.
3. If it does not meet the quality standards agreed in this contract, Party B shall rework it until it meets the quality standards agreed in this contract, and bear the cost of rework. The quality standard fees agreed by Party A to Party B have been included in the contract price, and Party B shall not require any additional fees.
4. Party B shall handle the acceptance formalities of concealed works and intermediate works with Party A in time.
5. Once Party A finds that Party B fails to carry out the construction according to the acceptance specifications and quality evaluation standards, Party B must rework; In case of quality accidents caused by Party B, Party B shall bear the cost of rework; This rework will not postpone the construction period.
XI。 Safe construction
1, no major safety accidents.
2. Party B shall abide by the national labor management policies and regulations and Party A's management system.
3. Party B can only use the safety production facilities provided by Party A after passing the inspection. Party B shall not dismantle or damage the safety protection measures taken by Party A without authorization; If it is necessary to dismantle it under special circumstances, Party A's consent must be obtained, otherwise all consequences arising therefrom shall be borne by Party B; If Party B thinks that Party A's safety measures are not perfect, it can raise it with Party A, and Party A shall deal with it in time.
4. All personnel must wear safety protection articles when entering the construction site. Safety measures such as wearing seat belts must be taken for special operations, and smoking is prohibited.
Twelve. Product protection
1. Before the acceptance and delivery of the project, Party B shall be responsible for the finished product protection of the completed project, materials, finished products and equipment provided by Party A in the construction area of Party B. In case of any damage or loss during this period, Party B shall repair and compensate at its own expense.
2. During the construction period, Party B must keep and maintain the building materials, construction tools and equipment, and protect the finished products in public areas.
Thirteen. responsibility for breach of contract
1. In case of any of the following circumstances during the construction period, Party B shall be deemed to have breached the contract. Party A has the right to terminate the contract unilaterally and hold the defaulting party accountable.
(1) failed to enter the site as scheduled after receiving Party A's notice of entry. ..
(2) Major safety accidents or major quality accidents caused by Party B are not rectified in time.
(3) The on-site construction management was chaotic, and it was not rectified in time.
(4) Party B fails to complete Party A's work plan for two consecutive months.
(5) Party B cannot meet the construction requirements of Party A. ..
2. Party B shall not waste materials, otherwise Party A has the right to demand compensation from Party B for the wasted materials; Where materials and equipment are damaged due to improper use by Party B, Party B shall be liable for compensation.
3. If the quality, safety, civilized construction and standardized chemical requirements agreed in this contract are not met, Party B shall be liable for breach of contract, and the liquidated damages shall be calculated according to the settlement amount of Party B. ..
4. If Party B has a major safety accident, Party B shall bear 50-80% of the responsibility as the case may be.
Fourteen Other matters:
1. This contract is made in triplicate, with Party A holding two copies and Party B holding one copy.
2. This contract shall come into effect as of the date of signature and seal by both parties, and shall be terminated when Party B completes all the construction and Party A settles the accounts.
Party A (seal): _ _ _ _ _ _ _ _ _ _ _
Project leader (signature): _ _ _ _ _ _ _ _ _ _ _ _
All members of Party B's team (signature and fingerprint): _ _ _ _ _ _ _ _ _ _ _
Date of contract conclusion: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Standard Model Construction Labor Contract (III) Party A (Employer): _ _ _ _ _ _ _ _ _ _ _
Party B (contractor): _ _ _ _ _ _ _ _ _ _ _
According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, the two parties reached an agreement on matters related to the labor service contract for construction projects, which both parties shall abide by.
I. Project Name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Two. Project address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Three. Project content: _ _ _ _ _ _ _ _ _ _ _ _
This project is a frame-shear structure with a total height of _ _ _ meters and a total of _ _ _ floors.
4. Project contracting mode: In order to contract the carpentry class item by item, the team should complete the production and installation tasks of this project, and clean up the material stacking and sanitation of the construction site. The team made changes in strict accordance with the design drawings and all quantities.
5. Project date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. Complete all quantities.
Six, engineering quality requirements:
The quality of the project passed the acceptance and reached the qualified standard.
Seven. Contract price and payment method:
Calculate the area according to the building code. Rmb per square meter, subject to the actual settlement area of Party A and the owner.
In principle, the payment method of this project adopts the lump-sum contract signed by Party A and the owner to pay each project payment to Party B as the progress payment of this project, which shall be paid according to the progress of the project and the corresponding progress payment. The rest of the project shall be paid within six months after the completion acceptance and delivery (except the warranty payment). According to the actual situation of the general contract between the owner and Party A, if the owner's project progress payment cannot be paid on time for the time being, Party B shall not stop work and bid the price to Party A, and shall carry out the construction according to the normal construction progress.
Eight. 1. Party A shall provide all materials and large machinery required for this project.
2. Party B is responsible for providing labor and tools, necessary machinery and supporting equipment, small consumables and lighting lamps, and its own materials for getting on and off, and the expenses are considered in the contract price.
Nine, inspection and acceptance:
1. Safety in production: Party B shall strengthen safety education, conscientiously implement safety technical specifications, and ensure construction safety.
2. Quality: adhere to the engineering quality standards and strictly follow the construction acceptance specifications of drawings to ensure that the engineering quality meets the qualified requirements.
X. responsibilities of party a:
1, organize relevant personnel to carry out safe, quality and civilized construction for Party B's on-site construction personnel.
Education engineering and comprehensive management, and do a good job in daily supervision and management.
2. Organize and be responsible for the disclosure of construction technology and measures to Party B's construction personnel.
3. Be responsible for solving the living expenses of Party B's construction personnel, which will be deducted from the project payment.
According to the contract. Provide all mechanical equipment needed for the project, building materials needed for the process, necessary construction technical data, written technical quality and safety disclosure documents in time, and pay the project payment to Party B on time. When stopping work, Party A shall pay the living expenses of the workers according to the facts.
Eleven, according to the owner, supervision, party a's disclosure requirements, in strict accordance with the national operating norms and acceptance norms, carefully organize the construction. Party B must assist Party A in setting out, measuring and positioning. Party B actively organizes the operators to ensure the quality and quantity and complete the task on time. Construction personnel must ensure safety in production when working.
Twelve. Liability for breach of contract:
1. In any of the following circumstances, Party A shall be liable for breach of contract:
(1) If Party A fails to verify Party B's engineering quantity as agreed, or fails to pay the payment for labor operation items as agreed, or fails to pay the mantissa of labor operation items as agreed, Party A shall pay a penalty of RMB, compensate the economic losses caused by the breach of contract, and postpone and celebrate the discovered working hours.
(2) If Party B delays the construction period due to its own reasons, it shall pay liquidated damages to Party A.
2. When one party breaches the contract and the other party requests the breaching party to continue to perform the contract, the breaching party shall continue to perform the contract after assuming the above responsibilities.
3. The losses caused to the other party due to the reasons of both parties shall be borne by both parties.
13. Party A has appointed the person in charge of the site for this project. Party B shall designate a comrade as the person in charge of the site to perform the contract.
Fourteen argue
Any dispute between Party A and Party B during the performance of this contract can be settled through negotiation. If negotiation fails, it can be solved by the labor and social security department where the project is located. And the people's court proceedings.
15. This contract shall come into effect as of the date of signing, and shall become invalid on the day when all the project operation contents are completed and accepted, and the project price is settled.
Sixteen, safety accidents, medical expenses of 200.00 yuan each time, the rest shall be borne by Party A. ..
Seventeen. For matters not covered in this contract, both parties may sign a supplementary agreement through consultation. The original of this contract is in duplicate, with each party holding one copy.
Party A (Contract Seal): Party B (Contract Seal): Party A (Contract Seal): Party B (Contract Seal): Party A (Contract Seal): Party B (Contract Seal)
Legal representative: _ _ _ _ _ _ _ _ _ _ Legal representative: _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Standard Model Construction Labor Contract (IV) Party A: _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _
According to the Contract Law of People's Republic of China (PRC), relevant national laws, regulations and company documents, Party A and Party B, following the principles of equality, voluntariness, fairness and good faith, reached an agreement on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Sign this contract.
Article 1 General situation of the project
Project name: _ _ _ _ _ _ _
Project location: _ _ _ _ _ _ _ _ _ _ _
Article 2 Scope of project contracting
___________________________________
Article 3 Construction period
1. Planned commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. Duration of major nodes: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3. Party B shall unconditionally implement Party A's schedule (including the newly adjusted schedule).
Article 4 Engineering quality standards
The project quality within the scope of the contracted project must reach _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 5 Composition and Interpretation Order of Contract Documents
The documents constituting this contract and the priority interpretation order are as follows:
1. This contract;
2. Annexes to this contract;
3. Bidding documents;
4. Project construction drawings and current national or industry standards and specifications;
Note: The above documents should complement each other. If there is any ambiguity or inconsistency in the contract, it shall be interpreted in the above order. Can't explain clearly, on the premise of not affecting the normal construction progress of the project, solved by both parties through consultation.
Article 6 Standards and Specifications
Standards and specifications applicable to this contract: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 7 Responsibilities and Obligations of Party A
1. Responsible for formulating all management objectives in a unified way, organizing the preparation of construction plans and material consumption plans, and controlling, supervising, inspecting and accepting the project quality, construction period, safe production, civilized construction, measurement and testing.
2. Responsible for working contact with the owner, supervision, design and relevant departments, and coordinating the working relationship on site.
3. According to the engineering situation, Party B needs to increase or decrease the construction personnel to meet the needs of construction and production. Those who are poor in construction quality, poor in technology, disobedient to orders and violate the law and discipline will be retired.
4. Provide construction machinery and equipment and turnover materials supplied by Party A in time.
5. Pay Party B labor remuneration according to this contract.
6. Coordinate and solve the temporary living facilities, water use and _ _ _ _ _ _ _ expenses of Party B's construction personnel;
7. Assist Party B to handle the entry and exit certificates of site construction personnel, and the expenses shall be borne by Party B. ..
Article 8 Responsibilities and Obligations of Party B
1. Comply with national policies, laws and regulations; Abide by the relevant rules and regulations of the owner and Party A's enterprise, and do a good job in safety, civilized construction, environment and occupational health and safety, labor protection, etc.
2. Carefully organize the construction in strict accordance with the design drawings, construction acceptance specifications, relevant technical requirements and construction organization design to ensure that the project quality reaches the agreed standards, and be responsible to Party A for the project quality within the scope of the labor service contract; According to the plan requirements of the owner or Party A (including the adjusted plan), reasonably organize and scientifically arrange the operation plan, and invest enough manpower and material resources to ensure the construction period; Take responsibility for quality repair, construction delay and various fines.
3. Management personnel and safety personnel (certified) should be in place according to the requirements and commitments in the tender documents. Skilled workers must take up their posts according to national regulations, and technicians must have professional skills operation certificates, with a certificate-holding rate of 100%. Special types of work must have a special operation certificate, and the certificate-holding rate reaches 100%.
4. Obey the supervision, inspection and management of Party A and the owner; Accept the management of quality, progress, technology, safe production, civilized construction, environmental protection, etc. by Party A and the relevant personnel of the owner: accept Party A to check the storage and use of its equipment and materials and the valid certificates and certificates of its operators at any time;
5. Do a good job in the protection of finished products of buildings, structures, underground pipelines and completed projects around the construction site. If the damage is caused by Party B's responsibility, Party B shall bear all economic losses and various fines caused thereby:
6. Stack materials, machines and tools according to the unified planning of Party A; Properly keep and reasonably use the machines and tools, turnover materials and other facilities provided or leased by Party A to Party B;
7. Sign a labor contract with each migrant worker according to national policies and regulations, and pay the wages of migrant workers according to the terms stipulated in the contract (the wages of migrant workers are recorded monthly), and bear the disputes caused by the inadequacy of this work or the punishment and responsibility consequences of relevant local administrative departments;
8. Provide necessary labor protection and safety protection articles for construction personnel (such as safety helmet, safety belt, work clothes, gloves and other related protective articles);
9. Requirements to enter the site construction personnel have good ideological quality, good health, skilled technology and other conditions; /kloc-minors under the age of 0/8, the elderly over the age of 55 and the sick and disabled are not allowed to enter; It is strictly forbidden to use illegal personnel, and Party B shall bear the responsibilities and consequences caused by using the above unqualified personnel.
10. When Party A's funds are not in place temporarily and the owner cannot pay the project payment on time, Party B shall not affect the normal construction or gather people to make trouble to show his understanding of Party A. ..
Article 9 Environmental protection, safe production and civilized construction
1. Party A focuses on organizing the education of Party B's construction personnel on safety production, civilized construction, environmental protection and relevant company systems; Supervise and monitor the implementation of Party B's related work according to national laws and regulations and relevant company rules and regulations, so as to make its system run effectively.
2. Party B shall abide by the management regulations on safety production in engineering construction and carry out construction in strict accordance with safety construction standards; Strengthen the safety education of field operators; Seriously implement safety measures and take necessary safety protection measures to eliminate hidden dangers of accidents and ensure safe production; Accept the supervision and inspection carried out by safety inspectors according to law at any time. If an accident is caused by ineffective safety measures or illegal operation, all responsibilities, consequences and economic expenses shall be borne by myself.
In case of any safety accident, Party B shall immediately report to relevant departments of Party A in accordance with relevant regulations, and handle the accident in accordance with relevant national laws.
3. Party B shall strictly implement the management regulations of the competent construction department and relevant departments of environmental protection, fire protection and health on the construction site, so as to achieve civilized construction; Ensure that the construction site is clean and orderly, conform to the relevant regulations and requirements of civilized construction, maintain the good corporate image of Party A, and bear the losses and fines caused by violating relevant regulations.
Strengthen site management, take all appropriate measures to protect the internal and external environment of the site and limit noise or other pollution caused by construction operations; Avoid causing damage and obstruction to the property of the public and third parties.
Article 10 Supply and management of materials and equipment
1. The turnover materials provided by Party A to Party B shall be adjusted and extracted according to the needs of the project plan and provided to Party B..
2. Party B shall properly keep and reasonably use the materials and equipment supplied by Party A (including receiving, keeping, loading and unloading, returning to the warehouse, handling relevant formalities, and stacking according to the site designated by Party A); In case of loss or damage due to improper storage and use, Party B shall pay compensation according to the price at the time of collection.
3. Give Party B a fixed amount of materials according to the budget, and Party B shall use the materials reasonably and pay attention to saving. If the use of materials exceeds the budgeted amount, Party B shall bear the cost of the excess; The material saving part shall be divided by Party A and Party B in the proportion of _ _ _ _ _ _.
Article 11 Contract Method, Price and Content
1. Contract method and unit price
2. The contract price includes:
The contract price includes all kinds of risks of Party B during the construction period, wages of construction personnel and deployment fees: small machinery fees; Secondary transportation of various materials on site; Natural climate affects unforeseen working day expenses such as water cut, power cut and waiting for materials; Including the collection, loading and unloading, storage, storage and return of reusable materials; Expenses for labor protection articles (safety helmet, safety belt, gloves, etc.). ); Erection and removal of safety protection facilities (safety net, protective railing, protective shed, etc.). ); Civilized construction costs (including temporary labor for on-site inspections by superior departments); Cooperate with survey and setting out, material test, electrician, mechanical equipment maintenance and installation and disassembly within the scope of contracted projects; Labor cost of measures taken to prevent general natural disasters.