Hazardous waste can be placed in a hazardous materials warehouse, such as a laboratory that has a hazardous materials warehouse. It can also be stored at a disposal storage facility with a hazardous waste license.
One, for the license unit:
1, in the case of the scale of operation and business category allows, can receive hazardous waste from the waste-producing units;
2, for their own treatment process of new hazardous waste, such as incineration process of the fly ash, etc., should be sent in accordance with the requirements and procedures of other qualified units.
2, storage precautions: stored in a cool, dry, well-ventilated warehouse. Keep away from fire and heat source. Storage temperature does not exceed 30 ℃, relative humidity does not exceed 80%. It should be stored separately from reducing agents, acids, flammable (combustible) materials and active metal powders, and should never be mixed. The storage area should be equipped with suitable materials to shelter the leakage.
Expanded Information:
One, the scope of acceptance
1, annual incineration of 10,000 tons More than 10,000 tons of hazardous waste incineration;
2, disposal of hazardous waste containing PCBs, mercury and other threats to the environment and human health;
3, the use of hazardous waste disposal facilities included in the national hazardous waste disposal facility construction planning for the disposal of hazardous waste in a comprehensive centralized disposal facility.
Two, the approval conditions
1, there are more than three environmental engineering or related professional title of intermediate or above, and more than three years of experience in solid waste pollution control of technical personnel;
2, there are in line with the State Council's competent department of transportation related to the transportation of hazardous goods safety requirements for transportation means;
3, there are in line with national or local environmental protection Standards and safety requirements of the packaging tools, transit and temporary storage facilities, equipment, and storage facilities, equipment, and acceptance;
4, in line with the national or provincial, autonomous regions, municipalities directly under the Central Government of the construction of hazardous waste disposal facilities planning, in line with national or local environmental protection standards and safety requirements of the disposal facilities, equipment, and ancillary pollution prevention and control facilities; of which, the centralized disposal facilities for medical waste
5, with the operation of hazardous waste categories of appropriate disposal technology and techniques;
6, to ensure the safety of hazardous waste management rules and regulations, pollution prevention and control measures and emergency rescue measures;
7, landfill disposal of hazardous wastes should be legally obtained Land use right of the landfill site.
Baidu Encyclopedia - Hazardous Waste Business License Management