Emergency plan for construction site

Construction site emergency plan example (selected 6)

In the weekday learning, work and life, sometimes unexpected events will occur, in order to avoid causing major losses and harm, always inevitably need to prepare an emergency plan in advance. So what is the excellent emergency plan? The following is my collection of construction site emergency plan model (selected 6), for reference only, let's take a look at it.

Emergency plan for construction site 1

I. General

1, the purpose of the preparation

Reduce the damage caused by flooding, maximize the avoidance and reduction of casualties and loss of materials, the scientific implementation of the flood control scheduling, rescue and relief, planned and prepared defense against flooding, to ensure the quality of engineering and progress. and progress.

2, the basic principles

Firmly implement the leadership of the branch responsibility system; to prevent the main, combined with prevention and rescue; comprehensive deployment, focus; unified command, unified scheduling; a combination of engineering and non-engineering measures; mobilization of the whole site all the enthusiasm of the personnel, united against the flood.

3, the preparation of the basis

According to the "People's Republic of China **** and the State Flood Control Law" and the State Flood Control Office of the General Office of the preparation of the "outline of the urban flood control plan" and related laws and regulations, combined with the actual situation of the project, the development of this plan.

4, the scope of adaptation

This program applies to xxx city xxx site.

Second, the organization and responsibilities

1, the organization

xxx District xxx flood control command (hereinafter referred to as the command), the members are as follows:

Commander-in-chief: Tao Jianming (branch manager)

Deputy Commander-in-chief: xxxxxx

Members: xxx

The command set up an office, the office is located in Tianshui City, West Shili Jiatong Company's sixteenth project department. Under the unified command of the Command Department, four emergency response teams are set up: communication and liaison team, medical assistance team, logistics and material protection team, and safety and security team.

2, responsibilities

(1) project flood command main responsibilities

① in the company and the project under the leadership of the Ministry of Flood Control Command, the implementation of the national flood control regulations, policies and flood control headquarters decisions, directives, and the branch of the instructions on flood relief, issued to start the plan order, directing the relevant departments to carry out emergency response.

② according to the disaster on the flood emergency plan to put forward the argument, leadership, deployment, coordination of disaster emergency response, deployment and organization of the constituent departments to implement the flood and disaster relief work, the development and revision of the "Project Department flood emergency plan".

③ When there is a major flood disaster at the construction site, the organization will hold an emergency meeting on flood prevention, listen to reports on rain, water and disaster, and arrange for the deployment of flood prevention and relief work.

④ Unified command of the project department flood emergency work, the organization of the project department related personnel in accordance with the duties specified in this plan.

(2) project flood command office main responsibilities

① implementation of national regulations on flood control, guidelines, policies, implementation of the project flood control headquarters decisions and higher flood control headquarters scheduling instructions.

② grasp the flood, disaster conditions, if necessary, issue flood forecasts and warnings, prepare reports on the situation and rescue and relief.

③ Responsible for coordinating, checking and supervising the flood control work of the project department.

④ Organize the development of flood defense program, check and supervise the implementation of various flood prevention, flood control and disaster relief measures. ⑤ Assist in organizing flood prevention and rescue teams, and organize the construction of flood prevention information system. Supervise, check and implement the reserve of relevant flood prevention materials

⑥ Complete other work assigned by the company's flood prevention command.

(3) the duties of the emergency response team

① communication and liaison group: responsible for internal and external communication and liaison, keep in touch at all times. Once the flood accident, immediately contact the relevant departments to rescue, while reporting to higher authorities.

② logistical material support group: in accordance with the requirements of the company's flood control headquarters is responsible for flood control material reserves, management, supply work.

③ medical aid group: responsible for the first time after the disaster rushed to the scene to develop rescue programs, rescue the injured, and coordinate the major hospitals to treat the injured in a timely manner.

④ safety and security group: responsible for maintaining the order of the flood rescue public ****, emergencies, the transfer of personnel to organize the evacuation and transfer of workers.

3, rainy season duty system

The project arranged rainy season duty personnel, strict implementation of 24-hour duty system, to maintain smooth communication, strictly prohibit duty personnel off duty.

4, the rainy season key inspection and monitoring content

① pit dug around the drainage ditch, canal, so that the waterway is smooth, not into the pit.

② southwest corner of the pit and the northwest corner of the lower, within the two wells, dug around the ditch so that the water flows into the wells, with a pump to drain away.

③ Drainage in the site to the south of the dugout, so that the water around the gathering, with a pump to drain away.

5, response measures

In the event of flooding, the command department should promptly organize and direct the relevant units and personnel to do a good job in the flood relief work, the rescue and emergency teams to go to the location of the occurrence of the disaster, and quickly put into rescue. Communication and liaison group to ensure smooth information, logistics and material security group to ensure the supply of materials, medical assistance group to do a good job in the treatment of the injured and hygiene and epidemic prevention work, safety and security group to maintain good security of the project department, crack down on sabotage, theft.

Construction site emergency plan 2

First, the preparation of the purpose

When the flood came emergency rescue personnel can be the first time to arrive at the construction site, the timely control and elimination of flooding in the process of construction, to protect the safety of construction workers, to avoid or maximize the reduction of the construction equipment, materials, and the construction of the established projects in progress The damage is done by the construction equipment, material, and existing projects under construction.

Second, the guiding ideology

Adhere to the "prevention-oriented, combined with the prevention and rescue", the flood control policy, to ensure that the entire construction period of safe flooding. The implementation of unified command, unified scheduling, the implementation of the responsibility of section division, the overall situation, unity and cooperation, line into the project all staff flood control situation.

Three work objectives

Strengthen the flood protection, eliminate or reduce the flood disaster accident, to ensure safe construction during the flood season.

Fourth, the emergency organization and responsibilities

1, the organization

Project Department of flood control emergency rescue leading group

Leader: Wang Yuping

Deputy Leader: Liu Changqing, Li Jibing

Members: the heads of the various departments and the construction section of the chief

2 Responsibilities:

(1) Group leader: responsible for decision-making and overall command of the accident, mobilizing rescue personnel, equipment, materials and other resources in each work area.

(2) deputy leader: assist the leader, responsible for the specific command of the accident scene, organize the relevant personnel to the scene as soon as possible, organize and direct the rescue work.

(3) emergency action group: after receiving the site alarm notification, the first time to the emergency rescue team leader to report the accident overview, and notify the groups responsible for emergency preparedness.

(4) evacuation guide group: responsible for the scene alert, maintenance of order, diversion of the scene of casualties and traffic, guide rescue personnel, materials, vehicles, equipment into the rescue site, to protect the scene.

(5) on-site technical group: the development of rescue programs and demonstration, the organization of on-site rescue personnel to implement rescue measures.

(6) material equipment and vehicle protection group: organization of rescue materials, equipment, vehicles into the rescue, to help rescue personnel to maintain equipment, rescue site organization, coordination, guidance.

(7) rescue group: responsible for the scene of the emergency care of injured people, call 120 emergency telephone to assist the rescue center to send the injured to the hospital in time to save.

(8) external coordination group: communication with the relevant aspects of the accident.

(9) logistics support group: responsible for rescue personnel food and water and rescue supplies protection.

V. emergency supplies preparation, maintenance, maintenance.

(1) the preparation of emergency supplies: existing construction machinery such as excavators, loaders, pumps, generators, and planks, steel pipes, channel steel, square wood, wire, sacks, gravel, yellow sand and other first aid supplies.

(2) A variety of first aid materials should be fully equipped, and strengthen the daily management.

Six, preventive measures

1, the person in charge of the construction section of the project manager under the leadership of the Ministry of Flood Control Leadership Group, according to the specific conditions of the construction site preparation of emergency plans for flood prevention and flood control, equipped with a variety of emergency supplies, equipment, personnel, and found that the flood immediately after the measures taken to organize the personnel according to the plan for implementation.

2, the person in charge of the project department should always pay attention to the local weather, and the establishment of a perfect flood flood warning mechanism, to do early prevention, early prediction, in advance, supervise the material department to do a good job of rescue materials, equipment and personnel deployment organization.

3, after receiving the emergency flood warning notice, the flood control leading group of all personnel should immediately convene a meeting, and the organization of the project manager and engineering team personnel to make preparations for the flood, and urged to do a good job of flood prevention, flood control of the emergency measures, the work area should be strengthened to patrol the inspection, with good rescue equipment and material supplies.

4, the engineering team according to the flood prevention and flood control area to do emergency measures, so that the construction site of the drainage system is smooth, power outages and reinforcement of temporary power lines, to ensure smooth communication.

VII, emergency response

1, once the discovery of flood danger, the duty officer should immediately notify the nearby construction workers and nearby villagers, and in the fastest way possible to report the project department flood prevention and flood control emergency response team leader, the leader of the leading group to receive the danger of immediately report to the higher management, and immediately organize rescue personnel in accordance with the plan to rescue. The rescue personnel immediately organized in accordance with the plan to rescue.

2, the project department flood control emergency leading group in accordance with the division of responsibilities immediately rushed to the rescue site, and orderly organization of the construction site rescue work. The establishment of the site command, the rescue commander-in-chief immediately organized the engineering team leader and remember the personnel to analyze the situation, and immediately take measures to protect the construction right-of-way open, dredge the road side ditch, and whether to evacuate the downstream residents and construction equipment, evacuation of construction personnel, whether the need to dredge the downstream river to make the right decision. If necessary, it should ask the relevant departments of the local government for assistance and guidance, and report to the supervisory office and the leadership of the command in time. At the same time should organize all emergency personnel according to the characteristics of the disaster and accident situation, the implementation of effective emergency measures for a short period of time, and strive to minimize or eliminate the damage, adverse factors.

Eight, reply to the production and emergency rescue summary

1, rescue rescue after the end of the project, the project leader to write a "disaster situation analysis report", and the organization of the relevant personnel to assess the adaptability of the emergency rescue plan, some of the provisions do not adapt to be revised.

2, the organization of the establishment of the unit, the owner and other relevant units will be held to resume production, the reasons for the occurrence of water-logging disasters and accidents to analyze and determine the quality of the resumption of production should be taken, safety, environmental protection and other construction measures.

Construction site emergency plan 3

With the arrival of the rainy season, xxxxxxxx project construction is in the stage of decorative construction, good flood control work is particularly important. According to the company's "safety first, prevention first" policy, take full account of the current situation of the project, my project to develop effective measures to ensure normal production and operation during the flood season, to ensure the safety of collective property and the majority of staff life and property safety, to ensure the safety of the flood season.

First, the flood rescue leadership group

Leader:

Deputy Leader:

Members:

Second, the personnel division:

Strategy

Third, the emergency response team:

Captain:

Vice Captain:

Team members:

Fourth, the management staff on duty (24 hours)

V. Flood control measures

1, the cement storehouse is solid, rainproof, and do a good job to prevent Measures to prevent flooding, often check whether the rain and moisture occurs, so as not to cause losses.

2, do a good job of preparing flood control materials, such as sandbags, raincoats, water pumps, etc. Prepare enough for emergency use.

3, do a good job of supplying materials during the flood season, and to ensure that the material transportation, storage process is not subject to loss, in order to ensure normal production.

4, the basement foundation water collection wells six drainage pumps to do a good job of drainage connectivity, to ensure smooth drainage to cope with the flood season rainstorms. The discharged rainwater is discharged into the city municipal storm water pipeline after secondary precipitation.

5, the office and warehouse are equipped with enough water pumps and raincoats to ensure the smooth passage of the flood season.

6, summer rain should be strengthened on the tower crane and construction hoist management, check the brake performance, strengthen the maintenance, electromechanical personnel and crane drivers take turns on the cable, motor, reinforcing the point of inspection, found that the problem is solved in a timely manner.

7, electromechanical personnel to strengthen the power distribution box leakage protector check to avoid accidents due to leakage.

8, after the rain on the construction site and basement inspection, if found problems, timely solution.

9, the template support system, scaffolding foundations and other comprehensive inspection, such as deformation, reinforcement treatment.

Six, the scene

1, in strict accordance with the division of labor, on duty, without the approval of the company's leadership, no one shall leave the post without authorization. Duty personnel every day on time to listen to the weather forecast, and timely response to the tide flood.

2, the site is equipped with a sufficient number of flood control materials and tools to prevent flooding.

3, the electrician to do a good job of daily inspection, to prevent leakage, disconnection occurs, should be twice a day to check the power equipment, lines and equipment operation, to exclude the occurrence of electric shock hidden danger.

4, should be often on the site guardrail, on the pavement, six signs and two diagrams, advertising and publicity project elevation diagrams and other facilities to prevent the occurrence of injuries.

VII, logistical life

1, flood control during the preparation of a sufficient number of living supplies to ensure that employees live.

2, to ensure that the supply of tea, improve the quality of meals and health, so that employees can eat a safe meal.

3, do a good job in the flood season to prevent mosquitoes and flies, regular disinfection, to eliminate sources of infection, to ensure that the health of workers.

VIII, material preparation plan

Table abbreviated

construction site emergency plan 4

According to the higher level of the document directive spirit and unified deployment, in order to ensure that the city's building construction site safety flood, to eliminate the occurrence of large accidents, to ensure that once the flood, can be timely and orderly, scientific and take corresponding effective measures. Rapidly remove the danger caused by flooding, minimize the loss of people's lives and property, especially the development of building construction site flood emergency plan.

First, the scope of adaptation

The implementation of this program applies to the city's administrative area of construction site flood control.

Second, the organization

The establishment of the River City building construction site flood control emergency leading group. Leading group responsibility: obey the unified command and arrangement of the Huanan City Housing and Urban Renewal Bureau, is responsible for the city's construction site flood emergency rescue and relief command, deployment, implementation and supervision; timely reporting on the rescue and relief of the situation, the proper solution, coordination of rescue and relief work and aftermath of the work.

The leading group set up an office, the office is located in the safety monitoring station, Comrade Xing Peng is also the director of the office. Under the unified command of the leading group, the office is fully responsible for the construction site flood emergency rescue and relief work. Specifically responsible for building construction site disaster report, timely notification of the flood emergency leading group and members of the unit immediately rushed to the scene of the accident, the coordination of the professional disposal group of the rescue work, timely communication of the leading group of the flood emergency rescue instructions on flood control, to ensure that communication and liaison is unimpeded.

The office set up under the emergency rescue group, material protection group, expert technical group, medical rescue group, publicity and reporting group.

(a) emergency rescue group: group leader Ren Xiaojun, members of Zhang Jiuzhan, Han Shihua, Wang Zhenjiang, Xu Shengyuan, Wang Shimin, Xu Yongsheng

Specifically responsible for the technical advice of the expert technical group and the accident site conditions developed by the flood rescue rescue program, in accordance with the program to quickly organize the rescue team to rescue rescue.

(b) material security group: leader Li Zhongyong, members Li Nianru, Li Zhenghui, Chen Tao, Li Bin

Specifically responsible for the implementation of the flood control rescue rescue materials, equipment and vehicles in place, and in accordance with the requirements of the Flood Emergency Response Leadership Group, the unified deployment of flood control rescue forces to ensure that the flood control rescue materials, vehicles and equipment in a timely manner to the scene of the flood control rescue.

(C) expert technical group: head Xing Peng, members of Liu Zhongjie, Zhang Qibao, Guo Jiangtao, Zhu Liang, Zhao Haitao

Specifically responsible for the timely organization of the relevant units and experts, according to the construction site to develop a flood rescue rescue program, and put forward proposals for the flood rescue and rescue and accident investigation work to provide technical support.

(d) medical rescue team: team leader Yue Lei, members of the Liu Aibing

Specifically responsible for organizing the relevant medical units to quickly start the scene of first aid for the injured, and coordination of 120 ambulances will be transferred to the hospital for treatment of injured people.

(e) publicity and reporting group: head Wang Weigang, members of the Liu Baomin, Gao Ligong

Specifically responsible for the URA flood control leading group to report disaster information, publicity and reporting of rescue and relief in the advanced deeds.

Three, the implementation of the emergency plan

Once the occurrence of a major danger, the person in charge of the enterprise in the competent departments to report at the same time, we must immediately organize the unit of personnel to carry out rescue and self-help, and quickly start the flood emergency plan. The leading group unified command of rescue and relief work. The office should quickly identify the flood and disaster situation, for the accident site, timely report to the leading group, and immediately start the construction site flood emergency plan, develop rescue and relief measures. The emergency response team in accordance with the set division of responsibilities in the shortest possible time to issue a notice of rescue and relief, organization and mobilization of rescue teams and equipment and materials, quickly rushed to the scene of the accident, the implementation of rescue and relief. According to the specific circumstances of the accident quickly reported to the URA flood control leading group, contact and coordination of public security, fire, transportation, hospitals and other departments, and actively do a good job of rescue and relief and rehabilitation work

Fourth, safeguard measures

(1) the Office should be held on a regular basis to convene special meetings to analyze and study the flood situation and the problems that exist, and continue to improve the emergency plan Measures. Check and guide the members of the rescue team drills to ensure the relevance and effectiveness of the emergency plan.

(2) The member units of the rescue and relief machinery, materials, etc. must always maintain good performance and condition.

(3) The members of the unit should regularly rescue personnel to carry out professional training and rescue drills to improve the ability to ensure that once flooding occurs, the rapid organization of rescue, to ensure efficient, orderly, timely, and minimize the loss, at the same time, to do the call, to come to the war, the war can be won.

(4) to ensure smooth communication, members of the leading group and the relevant members of the unit responsible for must maintain 24 hours a day open communication links. Any change in the communication telephone number, to inform the office in a timely manner.

(5) the strict implementation of 24-hour duty system, to maintain smooth communication. Duty room in the office.

(6) All relevant units and related personnel must unconditionally listen to the instructions of the leading group of the emergency plan, obey the unified command scheduling. In the process of rescue and relief, AWOL, poor organization of rescue work, delayed, resulting in major losses and casualties, will be seriously investigated and punished in accordance with relevant laws and regulations.

Emergency plan for construction site 5

In order to do a good job of my site's typhoon prevention work, to reduce disaster losses, to protect the safety of people and property, according to the "People's Republic of China *** and the State Safety Production Law" and the District Construction Bureau of the spirit of the relevant documents, combined with the actuality of the company, the development of the Ministry of emergency response to the work of the project plan.

First, the basic principles of emergency response

(a) This plan for my construction site suffered a typhoon attack or impact, the basic procedures and organizational principles of emergency response work.

(2) in the implementation of emergency response work in the implementation of unified command, each responsible for their own, prevention-oriented, rescue first, rapid response, to ensure safety principles.

Second, the organization and competent duties

The project set up a leading group of construction site typhoon prevention work

Leader: project manager Zhu Jiahua

Deputy leader: deputy project manager Dai Jinquan, the technical responsible person Zhou Fengping

Members: the project safety office Zhang Hua, quality and safety officers Cai Baobin, construction worker Zhang Jianhu and other relevant personnel.

Main responsibilities:

(a) responsible for the construction project typhoon emergency response plan development and modification;

(b) before the typhoon, is responsible for notifying the site to do a good job to prevent the typhoon, checking the site safety facilities reinforcement, evacuation, transfer of operating personnel;

(c) arranging for personnel on duty, inspecting the construction site, and immediately organizing rescue Rescue and aftercare work, and maintain close contact with the higher authorities, report the accident scene at any time to deal with the emergency situation;

(d) the typhoon is over, is responsible for convening the relevant personnel to summarize the emergency response to the accident.

Third, the implementation of the plan

(a) received the news released by the meteorological station, it is expected that there is a possibility of being affected by the typhoon:

1, the project manager of the construction site issued a notice of typhoon prevention, the relevant personnel of the Ministry of attention to listening to meteorological news, pay close attention to the typhoon movements;

2, the project manager is responsible for notifying the The site of the relevant personnel and teams, requiring all personnel to work closely together to do a good job in the preparation of typhoon prevention.

(b) When the typhoon is approaching our city and will affect our region within 48 hours, and the weather station issues a typhoon warning:

1, the project department should reasonably arrange the construction, and stop the operation of the process that must be continuously constructed;

2, the project department should cooperate with the branch to do a good job of safety inspection before the typhoon, the inspection includes whether the construction lift is firm, whether the scaffolding and other facilities are stable, whether the temporary work shed is safe, etc., and take measures to prevent the typhoon. Temporary scaffolding is safe, etc., and take measures to reinforce and eliminate potential safety hazards.

(C) when the typhoon may hit our region within 24 hours, the weather station issued an emergency warning:

1, the project department typhoon prevention work leading group personnel in place, arrange for personnel on duty;

2, the site to stop the construction of construction, construction workers withdrawn to the safety zone;

3, the project manager organizes a tour of the site with the leading group of the company Further check the implementation of the various defense measures, the implementation of site rescue teams in place, and in a state of readiness;

4, during the typhoon, the occurrence of construction site casualties in the event of a safety accident, according to the company's "construction project emergency rescue plan for major safety accidents" implementation.

After the typhoon, the weather station issued a typhoon warning lifted, the project department should check the damage and report to the branch and the head office, for the site safety facilities should be reinforced in time, and summarize the work of typhoon prevention.

Emergency plan for construction site 6

Construction site is a multi-trade, three-dimensional cross operation of the construction site, there are fire safety hazards in the construction process. Especially during the peak period of engineering and decorative construction, the open flame operation increases, the flammable materials increase, and it is very easy to occur construction site fire safety. In order to improve the fire safety emergency response capability, all-out, timely, rapid and efficient control of fire safety accidents, minimize the loss of fire safety accidents and accidents caused by the negative impact, to protect the safety of corporate property and personnel, for the actual construction site, the Ministry of the project to develop the construction site emergency response plan for fire safety accidents:

I. Introduction to the project:

Huaian electric business incubation center 1 # 2 # building project, by the Huaian Hengxing comprehensive market development company invested in the construction of Huaian Oriental architectural design limited company design, Jiangsu Nongkeng Construction Engineering Supervision Co. The project consists of 1#2## building and garage, 1 layer underground, 1## building on the ground, 20 layers, 2## building 17 layers, frame shear wall structure. The total construction area of about 120,000 m2.

Second, the guiding ideology and legal basis:

Guiding ideology: fire safety emergency preparedness during the construction period is an important part of the construction safety management work. Site once the fire safety accidents will not only bring economic losses to the enterprise, but also very easy to cause casualties. In order to prevent fire safety accidents at construction sites, it is necessary to strengthen fire safety emergency rescue management. Implement the spirit of "hidden danger is more dangerous than open fire, prevention is better than disaster relief, responsibility is heavier than Mount Tai", adhere to the fire safety policy of "prevention first, prevention and elimination", and organize all the staff to study the knowledge of laws and regulations, the principles of fire safety and fire extinguishing. Basic knowledge of fire safety and rescue knowledge, to enhance the staff's awareness of fire safety.

Legal basis: "Production Safety Law" Article 17 states: "The main person in charge of the production and management unit has the responsibility to organize the development and implementation of the unit's production accident emergency rescue plan." Article 33 states: "Production and management units of major sources of danger should develop emergency rescue plans, and inform employees and relevant personnel in emergency situations should take emergency measures."

Article 48 of the "Regulations on the Safe Production of Construction Works" stipulates that: the construction unit shall formulate its own emergency rescue plan for production safety accidents, establish an emergency rescue organization or emergency rescue personnel, equipped with the necessary emergency response equipment and equipment, and regularly organize drills. Article 49 stipulates that: the construction unit shall, according to the characteristics and scope of construction works, monitor the parts and links of the construction site that are prone to major accidents, and formulate the emergency rescue plan for production safety accidents at the construction site. The implementation of construction general contracting, by the general contractor unified organization to prepare the construction project production safety accident emergency rescue plan, the general contractor and subcontracting units in accordance with the emergency rescue plan, the respective establishment of emergency rescue organization or emergency rescue personnel, rescue equipment, equipment, and regularly organize drills.

"The Chinese People's **** and the State Fire Safety Law" stipulates that "the key units of fire safety and security should develop fire extinguishing and emergency evacuation plans, and regularly organize fire safety drills."

Third, the basic tasks of emergency rescue in fire safety accidents:

The overall goal of emergency rescue in fire safety accidents is to minimize the consequences of the accident, including casualties, property damage and environmental damage, through effective emergency rescue operations. The basic tasks of emergency rescue in fire safety accidents are as follows:

1, immediately organize the rescue of victims, the organization of the evacuation or other measures to protect other people in the hazardous area. Rescue victims is the primary task of emergency rescue, emergency rescue operations, rapid, orderly and effective implementation of on-site first aid and safe transfer of the injured is to reduce the casualty rate, reduce accident losses the key. Due to the sudden occurrence of major accidents, rapid proliferation, wide range of hazards, should promptly educate and organize employees to take various measures to protect themselves, and if necessary, quickly evacuate the hazardous area or the area that may be endangered. In the process of evacuation, should actively organize workers to carry out self-help and mutual rescue work.

2, rapid control of the situation, and fire safety accidents caused by the hazards of detection, monitoring, determination of accidents in the hazardous area, the nature of the hazard and the degree of harm. Timely control of the source of the hazards caused by fire safety accidents is an important task of the emergency rescue work, only timely control of the source of the danger, to prevent the continued expansion of the accident, in order to timely and effective rescue. Fire safety accidents, should be organized as soon as possible, the volunteer fire safety team and rescue personnel with timely control of the accident continues to expand.

3, eliminate the consequences of the hazards, do a good job of site restoration. For the accident and the human body, soil, air and other hazards caused by the reality and possible hazards, quickly take measures such as closure, isolation, decontamination, testing, etc., to prevent the continuation of harm to people and pollution of the environment. Promptly clear the debris and restore basic facilities. Restore the accident scene to a relatively stable basic state.

4, find out the cause of the accident, assess the degree of harm. Accidents should be investigated in a timely manner after the occurrence of the cause of the accident and the nature of the accident, to assess the scope of the accident and the degree of danger, to identify casualties, do a good job of accident investigation.

Fourth, the establishment of the emergency response team, the implementation of functional group responsibilities.

The establishment of the Huai'an Electricity Business Incubation Center 1 # 2 # Building Project Department of fire safety and security leadership group and volunteer fire safety team.

(a), team leader and team members, functional groups:

(b), the leading group responsibilities: site fire safety accidents, responsible for commanding the site rescue work, to the various functional groups to give rescue instructions task, coordination between the rescue work of the various groups, at any time to grasp the latest developments in the various groups and to make the latest decisions, the first time to 110, 119, 120, the company and the local fire safety department, the construction administrative department and the relevant departments to report and ask for help. Usually team members take turns on duty, the duty must be in the site, the cell phone is open 24 hours a day, fire safety emergencies, in the emergency response team leader did not arrive at the site before the duty is temporary acting team leader, fully responsible for the implementation of the rescue.

Functional group responsibilities:

1. Liaison group: its task is to understand the accident situation, is responsible for the accident occurred in the first time to notify the company and the relatives of the parties, etc.

2.

2. rescue group: its task is according to the command group instructions, in a timely manner, responsible for rescue, rescue, and set up the scene to accompany the hospital. When the situation can not be controlled, immediately notify the contact group to call the government authorities for help.

3. Evacuation group: its task in the event of an accident, responsible for the evacuation of people, escape.

4. Rescue group: its task is responsible for the treatment of injured people and sent to the hospital first aid.

5, the defense team: responsible for loss control, material salvage, the accident site to delineate the cordoned off area, to prevent people unrelated to the project to enter the scene, to protect the scene of the accident from being destroyed.

6, the investigation team: to analyze the cause of the accident, after the results and economic losses, etc., the investigation of the situation reported to the company in a timely manner.

7, logistics group: responsible for rescue materials, equipment and appliances supply and logistical support.

8, voluntary fire safety team: fire safety occurs, should be in accordance with the plan drill method, and actively participate in the fight staff list and division of labor should be hung on the wall of the project office.

(C), the emergency team location and telephone relevant units and departments contact information:

;