Preparation of the project application report

Preparation Project Application Report

How can I write a good preparation project application report? The following is a preparation project application report that I have carefully edited for you, welcome to read!

Preparation of project application report (a)

Shengshi Trade City Project

Application report preparation fee schedule

Construction unit: Fengkai County Shengshi Real Estate Co.

Preparation unit: Zhuhai Delian Engineering Consulting Company Limited, Zhaoqing Branch

May 17, 2013

Shengshi Trade City Project

Application Report Preparation Fee Table

I. Information to be provided by the commissioning unit:

1. Brief introduction of the construction unit (including departmental setup, technical strength, financial status, etc.)

2. Business license, tax registration certificate, enterprise code certificate, development qualification certificate, etc.

3. Documents related to the project: government approval, land Use certificate, construction land use planning permit,

Planning and design points

4, planning land blueprints (identifying the detailed project location, surrounding infrastructure and supporting

and the surrounding development), the general layout plan of the planning program (including economic and technical indicators)

5, the project siting advice letter

6, the development and construction conditions (water supply, electricity, sewage disposal, water supply, sewage disposal, sewage disposal, sewage disposal). Water supply, electricity, sewage, drainage, roads and other construction conditions)

7, construction content, scale, functional parameters, household type ratio, preliminary construction program

8, development progress, development principles, product positioning, target customer positioning, sales price positioning,

project planning report, construction program

10, project construction progress plan, Funding arrangements, financing methods, estimated total investment, cost

composition, loan amount, loan period, repayment methods.

11, project budget

12, industry analysis reports, market research reports, project synthesis reports

14, environmental assessment reports, geological exploration reports

15, land acquisition, demolition and resettlement of immigrants

16, other project-related information.

Second, engineering consulting procedures:

1, the consulting unit to prepare the project application report documents

2, the project application report documents sent to the commissioning unit for review

Third, the project application report preparation fees:

1, engineering consulting services based on the total investment in the project, based on the calculation of the price of [1999] 1283

No. p> No. "Notice of the State Planning Commission on the Issuance of Interim Provisions on Consultation Charges for Preliminary Work of Construction Projects"

and Guangdong Price [2000] No. 8 "Notice of the Guangdong Provincial Price Bureau and Guangdong Provincial Planning Commission on the Issuance of Interim Provisions on Consultation Charges for Preliminary Work of Construction Projects", which stipulates the charging

fee standards. (Annex 1)

2, the total investment in the project: 85 million yuan; (project cost: 40,000 square meters?0.15 million

yuan / square meter = 60 million yuan, land costs: 15 million yuan, other costs of construction: 7

million yuan, the reserve cost of 3 million yuan);

3, the calculation of the consulting fees are as follows : (industry adjustment factor to take 0.8, engineering complexity adjustment factor

number to take 1.0)

(1), 30 million yuan = 120,000 yuan

(2), 12 + (28-12)/(10,000-3000)? (8500-3000) = 245,700 yuan

(3), 24.57?0.8?1.0 = 196,600 yuan

According to the actual situation of the project, reflecting the high quality and good price service, consulting fees are charged at ( 15%), that is, 196,600 yuan? ( 15%) = 3.00 million dollars.

Fourth, engineering consulting fee documents: (Attachment 1)

Fifth, the company's profile:

The company is a class A engineering bidding agent, government procurement agency, engineering cost consulting, engineering

engineering consulting, the national ISO9001: 2000 quality management system certified unit, the quality of service

Honest model unit. (Detailed information is attached separately)

Annex 1

Notice of the State Planning Commission on the Issuance of Interim Provisions on Consulting Charges for Preliminary Work of Construction Projects

Price [1999] No. 1283 September 10, 1999

Price Bureau (Committee) and Planning Commission (Planning and Economic Commission) of provinces, autonomous regions and municipalities directly under the central government, China Engineering Consulting Association:

In order to regulate the behavior of pre-construction project work consulting fees, to safeguard the legitimate rights and interests of the client and engineering consulting organizations, and to promote the healthy development of engineering consulting industry, the Commission formulated the "Interim Provisions on Pre-construction Consulting Fees," which are hereby issued to you for implementation, and will provide timely feedback to the Commission on any problems encountered in the implementation of the Interim Provisions.

September 10, 1999

Preparation of the project application report (II)

First, the main purpose of the preparation of the common text of the project application report

To implement the spirit of the investment system reform, further improve the enterprise investment project approval system, to help and guide enterprises to carry out the preparation of the project application report, standardize the project approval authority on the approval of enterprise investment projects

The common text of the project application report is a general requirement for the content and depth of the project application report. Enterprises in the preparation of specific projects in the application report, combined with the actual situation of the project itself, the general text of the content required to make appropriate adjustments; if the proposed project does not involve the relevant content, you can explain the situation is no longer in the case of detailed justification. In order to better adapt to the specific circumstances and requirements of different industries, the National Development and Reform Commission will be in the general text on the basis of the gradual development of industry-specific project application report text. The industry this will fully reflect the special circumstances of different industries, and according to the needs of the work of the general content of the appropriate additions and deletions.

Second, the nature of the project application report and research ideas

In accordance with the requirements of the investment system reform, the government no longer approves the feasibility study report of the enterprise investment projects, the project's market prospects, economic benefits, sources of funding, product and technology programs, and so on, by the enterprise's own decision-making. Although no longer need to report to the government for approval, but in order to prevent and reduce investment mistakes, to ensure the effectiveness of investment, enterprises in the independent decision-making, should still prepare feasibility studies, analysis and justification of the above content, as an important basis for investment decision-making. Therefore, after the reform of the investment system, the main function of the feasibility study report is to meet the needs of the enterprise independent investment decision-making, its content and depth can be determined by the enterprise according to the needs of the decision-making and the project accordingly.

The project application report, is the enterprise investment and construction should be reported to the government to approve the project, in order to obtain the administrative approval of the project approval authority for the proposed project, according to the approval requirements submitted to the project demonstration report. The project application report should focus on the project's externalities, public **** and other matters, including the maintenance of economic security, rational development and utilization of resources, protection of the ecological environment, optimization of the major layout, safeguard the public interest, to prevent monopoly and other content. When preparing the project application report, the proposed project should be comprehensively demonstrated in terms of planning layout, resource utilization, land acquisition and migration, ecological environment, economic and social impacts, etc., according to the requirements of the government's public **** management, so as to provide a basis for the relevant departments to approve the enterprise's investment project. As for the project's market prospects, economic benefits, sources of funding, product technology programs, etc., do not have to be in the project application report for detailed analysis and justification.

Third? Reporting unit and project profile? The preparation of instructions

A comprehensive understanding and grasp of the project reporting unit and the proposed project's basic situation, is the project approval authority to analyze and evaluate the proposed project to decide whether to approve the premise and foundation. If you do not fully understand the situation, it is difficult to make a correct approval decision. Therefore, the basic situation of the project reporting unit and the proposed project, in the preparation of the project application report occupies a very important position.

Through the project reporting unit's main business, years of operation, assets and liabilities, shareholder composition, the main investment projects and existing production capacity, etc., for the project approval authorities to analyze and judge whether the project reporting unit has the qualifications to undertake the proposed project, whether it is consistent with the relevant market access conditions, etc. to provide a basis.

Through the project's construction background, construction site, the main construction content and scale, products and engineering technology programs, the main equipment selection and supporting engineering, investment scale and financing options, etc., for the project approval authorities to analyze the proposed project related to the approval of matters to lay the foundation and prerequisites for evaluation.

Fourth? Development planning, industrial policy and industry access analysis?

Development planning, industrial policy and industry access standards, is to strengthen and improve the macro-control of the important means of approving enterprise investment projects is an important basis. The main purpose of the preparation of this chapter is to demonstrate, from the perspective of development planning, industrial policy and industry access, whether the objectives and functional positioning of the project construction is reasonable, whether it is in line with the requirements of various types of planning related to the project, whether it is in line with the relevant laws and regulations, macro-control policies, industrial policies and other provisions, whether it meets the standards of industry access, optimize the major layout and other

requirements.

In terms of development planning, should be elaborated in the national economy and social development of the overall plan, regional planning, urban master plan, town system planning, industry development planning and other types of planning and the proposed project is closely related to the content of the proposed project, the proposed project is in line with the requirements of the relevant planning, project construction goals and planning content whether to converge and coordination, etc. to analyze and justify.

In terms of industrial policy, the proposed project is related to industrial restructuring, industrial development direction, industrial space layout, industrial technology policy, etc., to analyze the proposed project's engineering and technical programs, product programs, etc. whether to comply with the relevant industrial policies, laws and regulations, such as the implementation of the national technology and equipment policy to improve the ability of independent innovation, etc..

In terms of industry access, the description of the proposed project-related industry access policies, access standards and other content, analysis and evaluation of the project construction unit and the proposed project is consistent with the relevant provisions.

V.? Resource development and comprehensive utilization analysis?

Reasonable development and effective utilization of resources is an important part of the implementation of the scientific concept of development. For the development and utilization of important resources for enterprise investment projects, from the perspective of building a conservation-oriented society, the development of circular economy, etc., the rationality and effectiveness of resource development and utilization of analysis and demonstration.

For resource development projects, to explain the resource reserves and quality of exploration, discussing the development of resources to be developed, natural quality, conditions of existence, development value, etc., analysis and evaluation of the project construction program is in line with the development and utilization of resources. Sustainable development strategy requirements, whether it is in line with the policy of protecting resources and environment, whether it is in line with the overall planning of resource development and comprehensive utilization of the relevant requirements. In the analysis and evaluation of resource development programs, should pay attention to the scale of resource development and efficiency analysis, limit blind development, to avoid the phenomenon of waste in resource extraction; analysis of the proposed mining equipment and technology programs to be used to meet the requirements to improve the efficiency of resource development and utilization; evaluation of the resource development program is consistent with the improvement of the resource environment and the promotion of related industrial development policy requirements.

For construction projects that require the occupation of important resources, the project should be described as the need to occupy the varieties and quantities of resources, the resource supply program; involving multi-metal, multi-purpose chemical elements **** raw minerals, associated minerals, and oil and gas mixed minerals and so on, should be based on the characteristics of the resources proposed a reasonable comprehensive utilization of the program, so as to achieve the best use of the material; through the unit of production capacity of the main resource consumption, resource recycling Through the main resource consumption per unit of production capacity, resource recycling utilization rate and other indicators of domestic and foreign advanced level comparative analysis, evaluation of the proposed project resource utilization efficiency of the advanced and reasonable; analysis and evaluation of the comprehensive utilization of resources program in line with the development of a circular economy, the construction of a conservation-oriented society; analysis of the utilization of resources will be the adverse effects of other resources, such as surface (sub) water, in order to improve the comprehensive efficiency of resource utilization. In the analysis of resource utilization, resource conservation measures should be analyzed and evaluated. This chapter mainly describes the main measures to conserve various types of metal ores, non-metal ores and water resources as raw materials in the project program, and analyzes and evaluates them. Analysis and evaluation of energy saving set up a separate chapter.

For water consumption or serious dependence on (transferred from: wWw.bdFqy.com 千 叶帆 文摘:编制项目申请报告)水资源的建设项目,以及涉及主要金属矿、非金属矿开发利用的建设项目,应应节水措施及相应的金属矿、非金属矿等原材料节约方案进行专题论证,分析拟建项目的资源消耗指标,阐述工程建设方案是否符合资源节约的措施,阐述工程建设方案是否符合资源消耗的指标,阐述工程建设方案是否符合资源消耗的指标,分析拟建项目的资源消耗。 Explain whether the construction program is in line with the comprehensive utilization of resource conservation policies and related special planning requirements, on how to improve resource efficiency, reduce resource consumption countermeasures.

Six. Energy saving program analysis? The preparation of instructions

Energy is an important factor restricting China's economic and social development. The fundamental way out to solve the energy problem is to adhere to the development and conservation, conservation priority policy, vigorously promote energy conservation, improve energy efficiency. In order to alleviate energy constraints, reduce environmental pressure, safeguard economic security, and achieve sustainable development, must be in accordance with the requirements of the scientific concept of development, the enterprise investment involves energy consumption of major projects, especially iron and steel, non-ferrous metals, coal, electric power, petroleum and petrochemicals, chemicals, building materials, and other key energy-consuming industries and energy-consuming enterprises to invest in the construction of the project, should pay attention to the energy-saving point of view of the approval, the enterprise to report on the project The application report should include the relevant content of the analysis of energy-saving programs.

Energy use standards and energy conservation norms, should be described in the project industry and the region on energy saving and consumption reduction of the relevant provisions of the project program should be followed by the relevant national and local reasonable energy use standards, as well as energy-saving design specifications. Evaluate whether the adopted standards and norms fully take into account the special requirements of the industry and the region where the project is located, and whether they are comprehensive and appropriate.

Analysis of energy consumption and energy consumption indicators. Should be described in the project location of the energy supply situation, the project program adopted by the process technology

technology, equipment programs and engineering programs on all types of energy consumption categories and quantities, whether or not in accordance with the norms and standards for design. According to the characteristics of the project, choose to calculate the energy consumption per unit of product output, energy consumption per ten thousand yuan of output value, energy consumption per unit of floor space, energy consumption of major processes and other indicators, and comparative analysis with the international and domestic advanced level, on whether to comply with the national energy consumption access standards for elaboration.

Energy saving measures and energy saving effect analysis. Should be based on the national energy-saving project implementation plan and other relevant policies and regulations, analysis of the project program in the main barriers to energy saving and reduction of energy consumption in the optimization of energy structure, to meet the relevant technical policies, design standards and industrial policies and other aspects of energy saving and reduction of energy consumption of specific measures, and energy-saving effect of the analysis of the demonstration.

VII. Analysis of construction land, land acquisition, demolition and migration?

Land is an extremely valuable and scarce resource, and land conservation is China's basic national policy. The project site selection and land utilization should strictly implement the national laws and regulations on land management, and effectively achieve the law, science, rationality and land saving. The population of land acquisition, relocation and migration due to project construction is a vulnerable social group in project construction. In order to effectively use land resources and safeguard the interests of the public affected by land requisition and relocation, planning programs for project construction land, land requisition and relocation and migrant settling should be formulated and analyzed and evaluated.

The project site selection and land use plan should describe the project construction location, land ownership category of the site, land area, land use status, occupation of arable land, and the way of obtaining land, etc., so as to provide a background basis for analyzing the reasonableness of the project land use and formulating the land requisition, demolition, and relocation and migrant settlement planning plan. When selecting the project site, consideration should also be given to whether the project construction will adversely

affect the relevant aspects, analyze and demonstrate whether the proposed project will override mineral deposits and cultural relics, affect flood control and drainage, affect navigation, and affect the safety of military facilities, etc., and propose solutions.

The analysis of land use reasonableness should analyze and evaluate whether the project construction land is in line with the requirements of land use planning, whether the scale of occupation is reasonable, whether it is in line with the requirements of protecting arable land, whether the arable land occupation supplementation program is feasible, whether it is in line with the principle of land use planning, intensive use of land, less arable land occupation, and less demolition and relocation of immigrants, and whether it is in line with the requirements of the relevant policies and regulations on land management.

If land acquisition and relocation is required for project construction, the relevant investigation and analysis of the impact of land acquisition and relocation should be carried out in accordance with the project construction plan and land use plan, and land acquisition, relocation and migration planning programs should be formulated in accordance with the law. It should briefly describe the main basis for the land acquisition, relocation and resettlement planning program, explain the scope of land acquisition, relocation and resettlement and the basis, principles and standards for determining them; put forward the results of the survey of the project's impact on the population and physical indexes, and analyze the reasonableness of the physical indexes; explain the main contents of the resettlement planning program for the resettlement of migrants' production and resettlement, relocation and resettlement, income restoration and employment and reconstruction, and analyze and evaluate the feasibility of the program; and explain the impacts of land acquisition, relocation and resettlement and compensation for the migrants. Demolition and relocation and compensation costs of migrant settling preparation of the basis and related compensation policies; elaboration of the local government's views on the planning of migrant settling, compensation standards.

VIII. Environmental and ecological impact analysis?

In order to protect the ecological environment and natural cultural heritage, and safeguard the interests of the public ****, for enterprise investment projects that may have an important impact on the environment, should be from the perspective of prevention and control of pollution, protection of the ecological environment, etc., to carry out an analysis and evaluation of environmental and ecological impact, to ensure that the ecological environment and natural cultural heritage in the construction and operation of the project to be effectively protected and to avoid problems due to the implementation of the project construction and geological disasters. The project will ensure that the ecological environment and natural cultural heritage will be effectively protected during the construction and operation of the project, and avoid problems such as geological disasters caused by the project construction.

Environmental and ecological status. It should provide the basis for the environmental and ecological impact analysis of the proposed project by describing the basic conditions of the natural environment of the project site, existing pollutants, ecological conditions, special environmental conditions and environmental capacity status. The impact of the proposed project on the ecological environment. The proposed project should be analyzed in the process of engineering construction and put into operation on the environment may produce damaging factors and the degree of impact on the environment, including exhaust, wastewater, solid waste, noise, dust and other waste emissions, soil erosion, on the terrain, landforms, vegetation and the entire watershed and regional environment and ecosystems of the integrated impact.

Analysis of ecological environmental protection measures. Should be from the perspective of reducing pollution emissions, preventing soil erosion, strengthening pollution control, promoting clean production, maintaining ecological sustainability, in accordance with national policies and regulations on environmental protection, soil and water conservation requirements, the implementation of the project may cause damage to the ecological environment to put forward protection measures, the environmental impact of the governance and soil and water conservation program of the engineering feasibility and governance effect of the analysis and evaluation. The development of governance measures should reflect the nature and characteristics of different pollution sources and emissions and

other environmental impact factors, the technology and equipment used should meet the advanced, applicability, reliability and other requirements; environmental governance programs should be consistent with the development of the circular economy, the project generated by the waste gas, wastewater, solid wastes, etc., to put forward the recycling program for treatment and reuse; the effect of pollution management The pollution control effect should be able to meet the relevant requirements of standard discharge. Construction projects involving soil and water conservation, should also include the content of soil and water conservation program.

For the construction of geological hazards prone area or may induce geological hazards of the project, should be combined with engineering and technical programs and site layout, analysis of project construction induced by the possibility of geological hazards and avoidance measures. Through the analysis of geologic hazards that may be induced by the project implementation, it shall evaluate the public ****safety problems that may be caused by the implementation of the project, and whether it will have a significant adverse impact on the public interests of the place where the project is to be constructed. In accordance with the relevant provisions of the state need to prepare the main content of the construction project geological hazards and seismic safety evaluation documents, a brief description.

For historical and cultural heritage, natural heritage, scenic spots and natural landscapes and other special environments, the possible impacts of project construction should be analyzed, research and demonstration of the impact factors, the degree of impact, and put forward protection measures, and demonstrate the feasibility of protection measures.

IX.? Economic impact analysis? The preparation of instructions

Financial evaluation of enterprise investment projects, mainly for financial profitability and debt settlement ability analysis. The economic impact analysis, the investment project is the cost of social resources and their economic effects of the demonstration, analysis of the project on the development of industry, regional and macroeconomic impact, so as to determine the economic rationality of the proposed project.

For the output does not have a physical form and obviously involved in the public interest intangible product projects, such as water conservancy and hydropower, transportation, municipal construction, health care and other public **** infrastructure projects, as well as tangible product projects with obvious externalities, such as the impact of serious pollution of the industrial product projects, should be carried out to analyze the effectiveness of the economic cost or cost-effective analysis of the community for the implementation of the project and the implementation of the construction of the project. If the economic costs and benefits of the project can be quantified in monetary terms, an economic cost-effectiveness flow chart should be prepared, and economic evaluation indicators such as the economic net present value enpv and the economic internal rate of benefit elrr should be calculated to evaluate the economic reasonableness of the project investment. For projects whose output effects are difficult to be quantified in monetary terms, non-monetary quantifiers shall be used as far as possible for quantification, and the method of cost-effectiveness analysis shall be used for analyzing and evaluating the economic rationality of project construction. Where quantitative analysis is difficult, qualitative analysis should be conducted to describe it. For major investment projects that have an important position in the industry and affect the future development of the industry, an industry impact analysis should be carried out to evaluate the impact of the proposed project on the development of the industry and related industries, including industrial restructuring, technological progress in the industry, the industry's competitive landscape and other major content, in particular, whether it is possible to form a monopoly of the industry to analyze and evaluate.

The project may have a significant impact on the regional economy, the regional economic impact analysis should be carried out, focusing on the analysis of the project on the regional economic development, industrial spatial layout, local financial revenue and expenditure, social income distribution, the structure of the market competition, etc., to analyze the correlation between the investment project and the regional economic development and the integration of the degree to provide a basis for analysis.

For infrastructure, scientific and technological innovation, strategic resource development and other projects with huge investment scale that may have a significant impact on the national economy, macroeconomic impact analysis should be carried out from the perspective of the overall development of the national economy, such as the analysis of the impact on the adjustment and upgrading of the national industrial structure, the layout of major industries, the international competitiveness of important industries, and the coordinated development of the region.

For major projects involving national economic security, the economic security analysis of investment projects should be carried out from the perspective of safeguarding national interests and ensuring that the national industrial development and economic operation are free from infringement, combined with the analysis of resources, technology, capital and market. Contents include: (1) industrial technology security, analysis of the key technologies used in the project is subject to others, whether it has independent intellectual property rights, the risk of technical barriers, etc.; (2) security of supply of resources, elaboration of the important resources needed for the project's source, analysis of the resource by the pattern of supply and demand in the international market and the price changes in the impact of the situation, as well as the existing monopoly pattern, security of the transportation routes, etc.; (3) the safety of the control of capital To analyze the equity control structure of the project, the ability of Chinese capital to control the capital of key industries, and whether there is any risk of monopoly, unfair competition and other risks that may be caused by inappropriate entry of foreign capital; (4) industrial growth and security, combined with the status quo of China's related industrial development, to analyze whether the proposed project is conducive to promoting the growth of related industries in the country, to enhance international competitiveness, and to avoid the risk of industrial growth; (5) security of the market environment, to analyze the security of the market environment. Foreign countries in order to protect the local market, the use of anti-dumping and other trade remedies and protection of intellectual property rights, technical barriers to trade and other means of setting up obstacles to the development of the relevant industries of the proposed project; analyze the impact of the international market on the survival of the relevant industries.

X.? Social impact analysis?

For projects that may have important social impacts due to land acquisition and relocation, as well as poverty alleviation, integrated regional development, culture and education, public **** health and other projects with obvious social development goals, should be from the perspective of safeguarding the interests of the public ****, building a harmonious society, and the implementation of the people-oriented scientific concept of development, social impact analysis and evaluation.

Social impact effect analysis, should be elaborated with the project construction and implementation of social and economic surveys related to the content and the main conclusions, analysis of the project produced by the type of social impact effects, the scope of the main social organizations and groups involved. Focus on elaboration: (1) Definition of the regional scope of social impact. The regional scope of social evaluation should be able to cover all potentially influential social factors, and should not be limited by factors such as administrative divisions; (2) Identification of organizations and groups of people affected by the project in the region of influence, including various types of direct or indirect beneficiary groups, but also groups that may be potentially negatively affected; (3) Analysis of various social impact effects that may be caused by the project, including direct impact effects and indirect impact effects such as increased employment, social security, labor training, health care, community services, etc., and analyze which are the main impact effects and which are secondary impact effects.

Social adaptability analysis should identify the main stakeholders of the project, analyze the needs of stakeholders, study the recognition and acceptance of the target population of the project construction content, evaluate the importance and influence of the stakeholders, and elaborate the measures and programs for the stakeholders to participate in the project's program determination, implementation management and monitoring and evaluation, in order to improve the support of local residents and other stakeholders to the project. The project is expected to increase the support of local residents and other stakeholders for the project, ensure that the proposed project can be accepted by the local social environment and human conditions, and improve the mutual adaptability of the proposed project and the local social environment.

The analysis of social risks and countermeasures should be based on the confirmation of negative social impacts of the project, and put forward measures and programs to coordinate the project with the local social relations, avoid possible conflicts and various potential social risks in the process of project investment, construction or operation and management, and solve the related social problems and mitigate the negative social impacts.

XI, on the use of foreign investment in the preparation of the project application report

Foreign investment in the preparation of the project application report, in accordance with the "Interim Measures for the Approval of Foreign Investment Projects", in addition to follow the general requirements of the general text of the project application report, in the introduction of the project profile should also include the duration of the operation, the target market for the product, the number of workers planned, the number of public **** products or services involved, the price of capital contribution, the need for imported products or services, the need for imported products, the price of the project application report. Service prices, capital contribution, the need to import equipment and the amount of content to meet the needs of the project approval authority for market access, capital project management and other matters for approval.

For foreign mergers and acquisitions of domestic enterprise projects, such as does not involve the expansion of production and investment scale, does not take up new land, energy and resource consumption, does not form a new impact on the ecology and the environment, the project application report can be appropriately simplified, but should focus on the following: the domestic enterprise situation (including the current status of the enterprise, financial condition, asset evaluation and confirmation of the situation, the purpose of mergers and acquisitions and the selection of foreign investors, etc.); foreign business situation (including the status of the enterprise, financial condition, asset evaluation and recognition of the situation) Foreign business situation (including the financial situation of the enterprise in the past three years, investment in mainland China and has effective control of the market share of products or services of enterprises in the same industry, company performance, etc.); mergers and acquisitions arrangements (including staff arrangements, the original enterprise debt disposal); mergers and acquisitions of the enterprise's mode of operation, scope of operation and shareholding structure; financing options; the Chinese party through the merger and acquisition of the income from the use of the arrangements; the laws and regulations require other content. Other contents required by relevant laws and regulations. The preparation of the project application report for borrowing loans from international financial organizations and foreign governments, in accordance with the "Interim Measures for the Management of Investment Projects of Loans from International Financial Organizations and Foreign Governments", in addition to following the general requirements of the general text of the project application report, the project profile should also include the type of foreign borrowing or the country, the size of the loan, the purpose of the loan, repayment program, declaration, etc. in order to meet the requirements of the project approval authorities on matters such as foreign debt management. Authorities on foreign debt management and other matters for approval.

;