Huaneng Dandong Power Plant Huaneng Dalian Power Plant Huaneng Shang'an Power Plant Huaneng Dezhou Power Plant Huaneng Weihai Power Plant Huaneng Jining Power Plant Huaneng Rizhao Power Plant Huaneng Taicang Power Plant Huaneng Huaiyin Power Plant Huaneng Nanjing Power Plant Huaneng Nantong Power Plant Huaneng Shanghai Shidongkou No. 1 Power Plant Huaneng Shanghai Shidongkou No. 2 Power Plant Huaneng Changxing Power Plant Huaneng Fuzhou Power Plant Huaneng Shantou Coal-Fired Power Plant Huaneng Shantou Fueled Electric Power Plant Huaneng Yuhuan Power Plant Huaneng Qinbei Power Plant Huaneng Yushe Power Plant Huaneng Xindian Power Plant Huaneng Chongqing Branch Huaneng Jinggangshan Power Plant Huaneng Pingliang Power Plant Huaneng Yueyang Power Plant Huaneng Yingkou Power Plant Huaneng Hanfeng Power Plant Huaneng Suzhou Thermal Power Plant Huaneng Dandong Power Plant is completed to strengthen the strength of the northeastern power grid, and to promote the economic construction of the Dandong region of Liaoning has a very important role.
Huaneng Dandong Power Plant has 288 regular employees, 239 with college degree or above, accounting for 82.99% of the total number of employees, 171 senior and intermediate professional and technical personnel, accounting for 59.38% of the total number of employees.
Huaneng Dandong Power Plant is financed by Huaneng International Power Company Limited and Liaoning Province, Northeast Electric Power Group Company and Dandong City***, with a planned capacity of 2,600MW and completed in three phases. The first phase of the project was approved by the State Council in March 1997, the construction scale for the installation of two 350MW imported coal-fired units, designed to generate 4.2 billion kilowatt-hours of electricity per year, in 1998 all completed and put into operation.
Huaneng Dandong Power Plant, a project of two 350MW units of equipment and major materials are approved by the state for the introduction of foreign investment projects, 85% of the required foreign capital for export credit, 15% for commercial loans. The main equipment turbine motors were provided by Westinghouse of the United States, and the boilers were provided by Babcock & Co. of the United Kingdom. The conceptual design and external interface municipality is undertaken by the Northeast Electric Power Design Institute.
Huaneng Dandong Power Plant has an annual coal-fired capacity of about 2.2 million tons, which is supplied by the Jungar Coal Mine in Inner Mongolia, transported to Qinhuangdao via the Daqin Line, and then transferred by sea to the special coal terminal for the power plant in the Dadong port area. The boiler make-up water of the power plant is taken from the Tiejia Reservoir which is about 24 kilometers away from the power plant, the circulating cooling water is taken from seawater, and the ash storage yard is used in the beach land of reed ponds, and the first phase of the project is connected to the electric power system with four 220kV outgoing lines.
Huaneng Dandong power plant is the largest investment project ever in Dandong, which will have a pulling effect on the Dandong economy. Dandong region is at the end of the Northeast Power Grid, the lack of thermal power baseload capacity, Huaneng Dandong Power Plant was put into operation, not only become the support point of the Northeast Power Grid, but also play an important role in the safe and stable operation of the regional power grid, to revitalize the economy of Dandong and Liao Liao, accelerate opening up to the outside world is also of great significance.
Mr. Zheng Ke, born in June 1956, a native of Linqu, Shandong Province, has a college education and is a senior engineer. Mr. Zheng has served as the chief of biotechnology section of Shandong Xindian Power Plant, deputy chief engineer of the plant, chief engineer, deputy plant manager, plant manager, and the first deputy plant manager of Huaneng Dezhou Power Plant. in December 2003, he was appointed as the plant manager of Huaneng Dandong Power Plant. Information Category:Proposed Project
Industry:Energy & Chemical,Environmental Protection
Region:Liaoning
Progress Stage:Under Construction
Latest Progress Stage:Construction in Progress
Project Profile:The project is to construct flue gas desulphurization system for two 350MW units in the first phase.
Details:
Project Name: Huaneng Dandong Power Plant Desulfurization Renovation Project
Progress Stage: Commencement of Construction
Construction Cycle: 2008-2009
Major Equipments: FGD equipments, Denitrification equipments, Dedusting equipments, Mist Eliminators, Sludge Dehydration System equipments, Wastewater treatment system equipment, absorption tower, agitator, limestone unloading and conveying system, gypsum silo unloading scraper, bypass baffle gate.
Project introduction: Dandong Power Plant Phase I two 350MW units flue gas desulphurization system (FGD system) with a total investment of 150 million yuan, the use of limestone - gypsum wet flue gas desulphurization process, a furnace and a tower design, the device is located in the south side of the chimney of the plant. The whole project will be completed at the end of May 2009 for use.
Investor Profile: Huaneng Dandong Power Plant is a key project during the "Ninth Five-Year Plan" period of the country and the province, and is also the only new construction project of Huaneng International Power Development (Co.) Company during the "Ninth Five-Year Plan" period. Huaneng Dandong Power Plant is a regional condensing steam large port thermal power plant, the site is about 40 kilometers away from Dandong City, located 4.5 kilometers southwest of Donggang City, adjacent to the Dadong Port.
Construction unit: Huaneng Dandong Power Plant
Postal address: Development Zone, Donggang City, Liaoning Province
Zip code: 118300
Design unit: Northeast Electric Power Design Institute of China Electric Power Consultant Group
Postal address: No. 4368, Renmin Street, Changchun City, Jilin Province
Zip code: 130021 Huaneng Dandong Power Plant Control Room
Huaneng Dandong Power Plant Phase II Project :2009-09-28
Information Category:VIP Project
Industry:Energy & Chemical Industry
Region:Liaoning
Progress Stage:Preliminary Design Stage
Latest Progress Stage:Preliminary Design
Project Summary:Project Construction of two 600,000 kW generating units.
Project Name: Huaneng Dandong Power Plant Phase II Project
Progress Stage: Preliminary Design
Construction Period: January 2010-November 2010
Major Facilities: Boilers, Instruments, Meter, Automation Control System, Pumps, Valves, Desulfurization Equipment, Dedusting Equipment.
Project description: The project is located in Dandong Donggang Development Zone, Liaoning Province, with a new power plant, two 600,000-kilowatt generating units, covering an area of 200,000 square meters with plant buildings.
The total investment of the project is 500 million yuan.