(a) units and residents living garbage;
(b) medical waste (including medical institutions diagnosis, laboratory tests, disposal, surgery and pathological dissection of the toxic bacteria-containing waste tissues and contaminated by blood or secretion of filth, care appliances and infectious disease areas generated by the pollutants, etc.);
(c) non-toxic harmlessness industrial waste (slag, furnace slag, etc.);
(iv) construction waste, engineering residues.
Solid waste management outside the scope of the above in accordance with relevant regulations. Article City Urban Construction Management Bureau is the city's solid waste discharge authority, the City Solid Waste Management Department (hereinafter referred to as the city solid waste management department) is responsible for the specific management of solid waste discharge. Chapter II emissions management Article IV unit emissions of solid waste, must be to the municipal solid waste management department for emissions procedures, with the municipal solid waste management department issued by the unified emissions certificate to the designated site discharge. Emission procedures have not been handled, are not allowed to discharge. Article V emission units should be timely and accurate reporting of the type and quantity of solid waste discharged by the municipal solid waste management department of its emissions were approved.
(a) slag, according to the actual emissions.
(ii) Slag, calculated on the basis of boiler tonnage.
(iii) Construction waste and engineering debris, calculated on the basis of demolition or excavation plan; if there is no demolition or excavation plan, on-site verification of quantities will be implemented.
(d) Unit living garbage, with self-hauling capacity, is calculated according to the number of people in the unit. Unit living garbage, no self-transportation capacity, by the district sanitation department consignment. Article VI unit of solid waste should be removed in a timely manner to avoid accumulation. Transportation vehicles should be done to carry the right amount of closed transport or cover thatch, is strictly prohibited along the way flying scattered and discharged indiscriminately. Article 7 The unit sells industrial waste, slag, engineering residual soil, should go to the municipal solid waste management department to handle the relevant procedures, and shall not be sold or dumped without authorization. Article VIII backfill required for infrastructure projects, the implementation of the plan to discharge, the city to determine the key projects backfill site, the construction unit and the municipal solid waste management department signed a contract by the municipal solid waste management department to organize the backfill.
The need to backfill the site with domestic waste, by the demand side and the district sanitation department for consultation. Article IX of medical waste before discharge, must go to the municipal solid waste management department for formalities, by the medical waste disposal site unified collection, transportation, centralized incineration.
The existing self-contained incineration facilities are perfect and identified by the relevant departments to meet the standards of medical institutions, allowed to dispose of their own.
After the release of this provision, other medical institutions shall not be new self-contained incineration facilities. Article X medical institutions to carefully fill out the toxic and bacterial waste registration card, strict management. Medical waste to set up a person in charge, prepare special containers, categorized containers, not on the ground, not exposed. It is strictly prohibited to mix medical waste into domestic garbage, furnace ash, residual soil discharge. Article XI collection, transportation, treatment of medical waste should be collected containers, transport vehicles closed, incineration harmless. Article XII of the municipal health epidemic prevention institutions of medical waste storage, treatment is responsible for supervision, monitoring and management.
Municipal environmental health research institutions on the treatment of medical waste should be regularly monitored for health, make environmental assessment. Chapter III site management Article XIII stationary emissions treatment sites to be included in the city's overall planning, approved by the municipal planning department, the municipal solid waste management department has a plan to requisition, and is responsible for management. Any unit or individual is not allowed to occupy the site and damage site facilities. Article XIV temporary discharge site, by the district sanitation department in conjunction with the district environmental protection department *** with the selected, by the district sanitation department, the public security department in accordance with their respective functions, respectively.
Temporary emission sites, district sanitation departments shall establish emission files, registration of emission units, emission types, emissions, emission time.
Temporary emission sites after use, the district sanitation department shall be filed with the environmental protection department of the district. Article XV of the temporary emission sites engaged in picking labor, by the local public security departments responsible for public security management, pickers must abide by the law and discipline, and obey the management.
The materials picked up by the pickers, by the municipal solid waste management department in charge, and with the local public security department **** with the recovery. Chapter IV charge management Article XVI units in the solid waste discharge procedures, in addition to the municipal people's government provides otherwise, shall pay the discharge management fee. Article XVII of the discharge management fee charges and the use of methods developed by the municipal finance department. Article 18 The residual soil for the reinforcement of the Hun River dam in the flood season can be exempted from paying the discharge management fee with the consent of the municipal solid waste management department.
Unit self-consumption of slag, slag and engineering residual soil (not out of the unit), exempted from paying discharge management fees.
The residual soil and slag (excluding the remaining residual soil) used as raw materials by the municipal urban construction department for the construction of roads, landscaping and other public **** facilities can be reduced or exempted from the emission management fee with the consent of the municipal solid waste management department.
Application for reduction or waiver of emission management fees, the unit must go to the municipal solid waste management department for the appropriate procedures.