With the establishment of people's legal awareness, the frequency of the use of contracts is on the rise, and the signing of the contract can balance the equal status of the two parties. The following is my compilation of equipment sale sales contract, more equipment sale sales contract click " equipment sale " to see.
Equipment sale sales contract 1
Signed:
Party A (buyer): Party B (seller):
1, A and B according to the "Contract Law", on the basis of equality and mutual benefit, consensus, the buyer agrees to buy from the seller at the same time the seller agreed to grant the buyer the following Equipment (the following equipment and instruments are referred to as equipment):
If there is a detailed list of configuration signed by both parties in this contract, please refer to the attachment.
2. Delivery period of the equipment Party B will deliver the above equipment to Party A within ____ days of the effective date of the contract, after which it will be executed in accordance with the provisions of Article 7.
3. Transportation, Installation and Acceptance of the Equipment
3.1 Party B shall ensure that the Equipment shall be delivered to the designated site of Party A in a safe and undamaged manner, and shall bear the costs of freight and insurance of the Equipment, and the loading and unloading costs shall be borne by ____ Party B.
3.2 Party B shall deliver the Equipment to Party A in a safe and undamaged manner.
3.2 Party A and Party B shall open the boxes of the equipment for checking and acceptance, and if it is found that the quantity is insufficient or there are quality and technical problems, Party B shall take measures to make up for, replace or return the equipment within ______ days according to Party A's requirements and bear all the damages and costs incurred therefrom.
3.3 After the arrival of the equipment, Party B shall complete the installation and commissioning within _______ days after receiving Party A's notice.
3.4 Party A and Party B shall carry out technical acceptance according to the technical standards of the contract (see annex) on the basis of conforming to the relevant national technical standards, and after passing the acceptance, both parties shall sign on Party A's "Acceptance of Acceptance List" to confirm.
4. Payment
Party A in the contract after the entry into force of the _____ first prepayment of the purchase price _____% of the _______ by ____; installation and commissioning acceptance of normal use of the ______ payment of the ______% of the purchase price of the _______ in two months, three months after the payment.
5. Accompanying services
5.1 Party B shall provide the technical documents of the equipment, including the corresponding drawings, operation manuals, maintenance manuals, quality assurance documents, service guide, etc., which shall be shipped to Party A together with the equipment.
5.2 Party B shall also provide the following services free of charge:
On-site installation and commissioning of the equipment
Provision of special tools and auxiliary materials required for the installation and maintenance of the equipment
Party B shall send professional and technical personnel to provide training or guidance to the Party's personnel on the site of the project, and after a period of time, can be based on the Party's request for a separate arrangement of training programs.
6. Quality Assurance and After-sales Service
6.1 Party B shall ensure that the equipment supplied is brand new and unused produced after __________ (month and year) and conforms to the requirements of the relevant national standards, standards of the manufacturing plant and technical standards of the contract. If the quality or specification of the equipment is not in conformity with the contract, or if it is confirmed that the equipment is defective, including potential defects or the use of non-compliant materials, etc., Party B shall be responsible for replacing the defective part or repairing the defective part by adopting new parts, components or equipment conforming to the specifications, quality and performance requirements stipulated in the contract within 7 days after receiving Party A's notice, and the cost shall be borne by Party B. At the same time, Party B should be in accordance with the provisions of this contract, the corresponding extension of the quality assurance period of the repair or replacement parts.
6.2 Party B shall provide a warranty period of _______ months, the duration of which shall be calculated on the date of acceptance by Party A and Party B. The replacement of spare parts and labor hours shall be free of charge during the warranty period. Party B in the warranty period should ensure that the opening rate of 95% or more, if not to meet this requirement, that is, the corresponding extension of the warranty period.
6.3 The response time for repair is _______ hours, and the arrival time is _________ hours (except under irresistible force).
6.4 After the expiration of the warranty period, the labor cost for a single failure is not more than ______ yuan, the number of annual regular preventive maintenance, not less than _______ times.
6.5 Party B is responsible for the lifelong maintenance of the equipment and should continue to provide quality service, reserve enough spare parts for the library, after the expiration of the warranty period, the supply of maintenance spare parts at __________ preferential price, the supply of consumables should be decided by the two sides to set up another agreement.
7. Claims
7.1 If the State Food and Drug Administration inspection confirms that the goods do not comply with the agreement of this contract, the buyer has the right to choose one of the following ways to request the seller to remedy:
7.1.1 Agree to the buyer to return the goods and reimburse the buyer in full, and to bear all the direct losses and costs incurred due to the return of the goods.
7.1.2 Depreciate the value of the goods in accordance with the degree of defectiveness, the extent of damage and the loss suffered by the buyer.
7.1.3 Exchange the defective goods, which must be new and in accordance with the specifications, quality and performance of this contract, and the seller shall be responsible for all the expenses incurred and all the direct losses suffered by the buyer.
7.2 If Party B fails to deliver the goods and provide the services in accordance with the time specified in the contract, Party A shall deduct from the purchase price the compensation for the delay without prejudice to other remedies under the contract, and the compensation for delayed delivery and delayed services shall be charged at the rate of zero and a half percent (0.5%) of the contract price for each week's delayed delivery of the instruments until the delivery of the goods or the provision of the services. However, the limit of the compensation fee for missed delivery shall not exceed five percent (5%) of the contract price. One week will be counted as seven (7) days, and less than seven (7) days will be counted as one (1) week. Once the limit of lost time compensation is reached, Party A has the right to terminate the contract.
7.3 Party B shall indemnify Party A and the user from any action brought by a third party for infringement of patents, trademarks or industrial property rights in connection with the use of the equipment or any part thereof.
8. Disputes. Settlement
If there is a dispute between the two parties in the fulfillment of the contract, first of all, there should be friendly consultation, and if the consultation fails, both parties should file a lawsuit to the court of the place where the contract is signed.
9. Entry into force of the contract
9.1 The contract shall enter into force after both parties sign and seal it.
9.2 This contract is in ____ copies, in Chinese, Party A executes three copies, Party B executes one copy, with the same legal effect.
10. Annexes to the contract
The annexes to the contract are integral parts of the contract and have the same legal effect as the contract.
10.1 Configuration list of the configuration list of the equipment
10.2 Technical standards of the bidding documents of the technical response to the technical description of the equipment
11. Special agreements _______________________________________________________________________
Party A: Party B:
(Stamp) (Stamp)
Party A Legal Representative or Authorized Principal Party B Legal Representative or Authorized Principal
Date: ____________________ Date: ____________________
Equipment Sale and Purchase Sales Contract 2
Party A:
Party B:
According to the relevant provisions of the "Contract Law", after the A and B on the basis of equality and mutual benefit on the procurement of "kitchen equipment, smoke exhaust system" consensus, willing to *** with the observance and fulfillment of the terms of this contract.
First, the name and quantity of goods:
The name of the goods, specifications, models, quantity, quality, unit price of goods see the list of goods.
Second, the project location:
Third, the contract cost: the total contract cost of RMB capital yuan (¥).
Fourth, the payment method:
1, cash payment of ¥.
2, after the signing of this contract, Party A to Party B to pay the project advance payment of RMB capital yuan (¥).
3, Party B installed exhaust fume purification, send fresh air system, Party A to pay the progress of the project to Party B capitalized yuan (¥ yuan).
4, all equipment by Party B engineers and technicians installed and commissioned by Party A, after acceptance, Party A to pay Party B the project sum of capital yuan (¥) and Party A to pay Party B coupons yuan (¥).
5, Party B shall issue a receipt to Party A after receiving the project payment.
V. Project completion time:
1, since the formal signing of this contract, Party B received Party A's contract prepayment after Party A site can be constructed within one working day from the date of installation. (Except for human irresistible factors).
2, the project and equipment warranty period of years, in the warranty period, Party B free of charge for Party A to provide services within the warranty, including replacement of spare parts material costs, the warranty period expires, such as Party A needs, Party B should respond positively, and at a uniform price in the market for the Party to provide repair and maintenance services.
Six, in the construction process, Party B construction personnel must strictly abide by the safety construction norms to ensure safe construction. Party B construction personnel in the construction process of any accident, Party B is responsible for.
VII, liability for breach of contract:
1, from the Party A to Party B to pay the first advance payment for the project, Party B can not be completed on schedule within days, every extension of one day, Party B to bear the contract total amount of one thousandth of the liquidated damages.
2, Party A in the project installation, commissioning and acceptance of the completion of the project, should be agreed to pay the final payment to Party B, such as breach of contract, each extension of one day, Party A shall bear the amount of arrears of 1,000% of the liquidated damages.
VIII, A, B disputes should be resolved through friendly consultation, consultation fails to be submitted to the Arbitration Commission arbitration.
IX, the annex to this contract for the contract is an integral part of the contract, and the contract has the same legal effect, the annex to this contract is: "Kitchen exhaust smoke, send fresh air system offer table".
X. Conditions for the entry into force of the contract:
1. This contract shall enter into force on the date of signature and seal of both parties.
2, the annex to this contract is an integral part of this contract, and the contract has the same effect "The annex attached to this contract is:" Summary Table and Quotation List "
3, this contract is an integral part of this contract, and the contract has the same effect "The annex attached to this contract is:" Summary Table and Quotation List ".
3, this contract in duplicate, A and B each party.
XI, other agreements:
The contract has not been completed, the two sides consult separately, can sign a written supplementary agreement.
Party A (seal): Party B (seal):
Legal Representative or Authorized Person: Legal Representative or Authorized Person:
Year Month Day Year Month Day
Contract for the Sale and Purchase of Equipment Sales3
No.:
Purchasing Unit (Party A):
Supplier (Party B):
Certifying Party:
According to the Government Procurement Law and other laws and regulations and the procurement documents (No.:), Party A and Party B, after negotiation, have agreed on the following terms:
Article 1: Equipment Brand, Specification Model, Quantity, Price, and Others
Amount Unit: Yuan Quantity Unit: Units
Equipment Name Brand
Specifications Model
Equipment Name Brand
Equipment Name Brand
Specification Model
Specification Model
Equipment Name Brand
Specification Model
Specification Model
SpecificationsQuantity
Unit
Unit price (yuan)
Total price (yuan)
Remarks
The total contract price (CNY):
Total contract price (CNY):
Note: The above total contract price includes the freight cost of transportation to the Party and installation and commissioning fees.
Article II: Quality Assurance
The equipment supplied by Party B is in line with national technical specifications and quality standards, the national "three C" certification or the relevant state departments to test the qualified products, have not been used out of the box, and the contract with the provisions of the model and the configuration of the same, and can be connected with the user's existing equipment; equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment, equipment and equipment. After installation and commissioning, the equipment can guarantee the system security of Party A within the scope of equipment function and stable operation, and the equipment supplied meets the procurement requirements of Party A. Software products are original product packages or license agreements provided by the original manufacturer. If it happens that the equipment supplied is not consistent with the contract, Party A has the right to reject or return the product, and all the responsibilities and consequences arising from this shall be borne by Party B.
Article 3: Delivery time and place
1, Party B within one working day after the contract comes into effect, according to its prior agreement with Party A will be supplied with equipment (factory original packaging) transported to the designated location (Hangzhou) unpacking, responsible for the installation and debugging and integration of the equipment, in accordance with the requirements of the Party A to install the other relevant software (software copyright is the responsibility of the Party A), the normal operation of the acceptance of Party A. The Party B will be responsible for the installation of the equipment, the installation of the equipment and the installation of other related software (software copyright is the responsibility of the Party A), normal operation of the Party A acceptance.
2, the equipment supplied for delivery and use, Party B must provide Party A with product instructions, quality assurance certificates, three packages of certificates and other related information and original accessories.
Article IV: Acceptance
1, Party B will be supplied with equipment to the delivery site unpacking, installation and commissioning is completed, Party A on-site acceptance, the two sides *** with the signing of the "Hangzhou Municipal Government Procurement Acceptance of Goods Reply Slip" and "Hangzhou Municipal Government Procurement After-sales Service Quality Feedback Form". The product model provided by Party B is uniformly corresponding and consistent in description.
2. The certifying party will fulfill the supervisory responsibility together with the Procurement Office, Supervision, Audit and other departments as well as the hired technical consultant.
Article V: After-sales service
1, after-sales service in accordance with the relevant provisions of the State, Party B to provide door-to-door on-site service. Purchased equipment from the date of acceptance, the warranty period of months, Party B provides free 7_24 hours of telephone technical support and 5_12 hours of on-site technical services.
2, on-site service response time: Party B in the warranty period after receiving Party A's call, Hangzhou City, within 30 minutes to respond within 2 hours to the scene, within 4 hours to repair the fault, within 4 hours can not be repaired, to take the provision of spare parts, spare parts or spare parts and other measures to ensure that the normal work of Party A to be maintained when the repair parts to be replaced back.
Article 6: Performance Bond
Party B shall pay a performance bond of 2% of the total contract price (total RMB yuan) to the certifying party at the same time of signing the contract,
After the completion of the contract, Party B shall issue a uniform receipt (with supervisory chapter of the financial or tax authorities) and hold the "Reply Slip for Acceptance of Goods Accepted by the Government of Hangzhou" and "Feedback Form for After-sales Service Quality of Hangzhou Government Procurement" to the certifying party. After-sales service quality feedback form" to the authentication certificate party for the performance bond without interest in the original amount of the refund procedures.
Article 7: Payment of Goods
After Party A accepts the delivery of goods, Party B shall report "Reply Slip for Acceptance of Hangzhou Municipal Government Procurement Goods" and "Feedback Form for After-sales Service Quality of Hangzhou Municipal Government Procurement" to the authenticating party for record in three working days, and then settle the payment of the goods with the original documents (invoices), and "Reply Slip for Acceptance of Hangzhou Municipal Government Procurement Goods" to Party A within one working day. Procedures.
Article VIII: Other Agreements
Article IX: Liability for breach of contract
1, Party B late performance of the contract, from the date of overdue, to the Party to pay the total contract price of 0.2 ‰ per day of liquidated damages; Party B overdue 10 days can not be delivered, should pay the Party 2% of the total price of the contract of liquidated damages, and no longer return the performance deposit, and at the same time, the Party has obtained the consent of the authentication party The right to terminate the contract.
2, Party A late payment of goods, from the date of overdue, to Party B daily repayment of the total contract price of 0.2 per cent of the liquidated damages; Party A refuses to pay the payment of the goods without justifiable reasons, should be repaid to Party B 2% of the total contract price of liquidated damages.
Article 10: Settlement of disputes
If there is a dispute in this contract, the supply and demand sides should consult in a timely manner to resolve the dispute, such as consultation fails, according to the "Chinese People's Republic of China *** and the State Government Procurement Law" provisions of the treatment.
Article 11: the entry into force of the contract
1, the contract by the legal representatives of A and B or their delegates signed and sealed by Party B within three working days sent to the authentication party to review the authentication, and to the authentication party to pay the performance bond of 2% to enter into force.
2, the contract fulfillment period, both parties shall not change or cancel the contract at will. If the contract has not been completed, by A, B and the certification party **** with the consultation, to enter into a supplementary agreement, the supplementary agreement and the contract has the same legal effect.
3, the procurement documents (No.:), tender documents and evaluation process of the formation of written information, bidding minutes as part of this contract, have the same effect.
4, this contract in triplicate, Party A, Party B, the authentication party to keep a copy.
Party A (seal): Party B (seal):
Legal representative: Legal representative:
Or appointee (signature): or appointee (signature):
Address: Address:
Zip code: Zip code:
Contact person: Contact person:
Contact phone number: Contact phone number:
Fax: Fax:
Bank of Account: Bank of Account:
Account No.: Account No.
Certifying Party (seal): Government Procurement Center
Legal Representative:
Or Appointee (Signature):
Address: No. 155, Dongxin Road
Contact Person:
Zip Code. >
Tel:
Fax:
Signing time:20 years and months
Signing place:Hangzhou District Road No.
Equipment sale and purchase sales contract 4
Purchaser: (hereinafter referred to as the A party) __________________
> Supplier: (hereinafter referred to as Party B)__________________
Party A purchases Party B for production needs. After consultation between the two sides, in accordance with the "honesty and credit, equality and voluntariness, quality first" principle, *** with the development of the following contract:
a. A party to buy party B, party B should be in accordance with the requirements of the party responsible for the design of all the above equipment, manufacturing, installation, commissioning and operation, and to ensure that all accessories with the main machine and other supporting products And other ancillary products
Second, Party A to buy Party B a full set of machinery and equipment in the total amount of __________ yuan.
Third, the payment time and mode
__________________________.
Fourth, the delivery time, place and mode
Delivery time:_______________________
Delivery place:_______________________
Delivery mode: door-to-door delivery.
V. Acceptance time and standards
(1) Acceptance time: within ______ days from Party B's commissioning and operation;
(2) Acceptance standards:
A. All the equipment must be the prescribed models and specifications. No substandard shoddy products shall be used.
B, the installation of all equipment should be in line with the process of the production equipment itself, reflecting the principle of strong and durable, quality first, quality up to standard.
Six, safety requirements
Party B is fully responsible for the transportation of equipment and installation and commissioning of the whole process of production safety, to ensure safe construction, responsibility. Installation and commissioning period, such as casualties and other accidents, caused by all the losses or economic compensation, by Party B to bear all.
VII, on-site service
Party A is responsible for the installation of all equipment and materials required for the production of the foundation, and to provide Party B, to arrange for Party B on-site personnel to stay and provide the necessary living supplies and transportation vehicles.
Eight, personnel training
After the completion of the installation and commissioning, teach equipment management personnel and make. Use of personnel to master the basic operation of the equipment.
Nine, after-sales
Since the date of acceptance of the equipment by the two sides, Party B should be in accordance with the relevant provisions of the warranty service, warranty service period of one year, the warranty period, Party B must be received by the party requesting maintenance notification to the site of the equipment maintenance, equipment maintenance of the cost of materials used in the perishable parts borne by the party.
X. Liability for breach of contract
1, Party B handed over the product varieties, models, specifications, quality, etc. does not comply with the contract, Party A can not be utilized, Party B shall be responsible for the replacement or repair, and bear the repair, exchange or return to pay the actual costs, such as the Party can not be repaired or replaced, according to the treatment of non-delivery;
2, Party A and B, either party to the force majeure due to the factors can not fulfill the contract. When either party cannot fulfill the contract due to force majeure factors, it should promptly inform the other party of the reasons for performance or non-performance or inability to fully perform, after consultation between the two sides - to agree, and obtain proof of the relevant parties, may be partially or fully exempt from liability.
3, Party A to ensure that the normal construction and installation of Party B, without cause to Party B caused by not being able to normal installation, thereby affecting the progress of Party B installation, Party A shall be responsible.
XI, the two sides to resolve any outstanding issues, changes and modifications to the contract must be agreed by both parties, and change in writing. Supplementary and change the contract and this contract has the same effect.
XII, the two sides of the dispute, should be resolved through consultation, consultation fails, either party should be to the People's Court in the location of Party A to file a lawsuit.
xiii. This contract shall enter into force after both parties have signed and sealed it, and shall terminate itself after the fulfillment of the rights and obligations of both parties.
XIV, this contract in duplicate, each party to sign a copy, with the same legal effect.
Party A (official seal): __________________ Party B (official seal): _____________________
Legal representative (signature): _________ Legal representative (signature): ________________
__________ year _______ month _____ date ____________ year ________ month _______ date
Equipment Sales and Purchase Sales Contract 5
Party A:______________________________
Party B. ______________________________
The buyer and seller voluntarily sign this supply and sales contract in accordance with the following terms and **** with the observance:
Name: _______________
Quantity: ______________ units
Price: CNY _____________ million whole (¥: ____________ yuan)
(1) Price Composition
1, the total aggregate price of this contract:RMB (capital) ___________ million whole (¥: __________ yuan), the prepaid amount of ________ million whole (¥. ____________);
2, in the ________ year ____ month ________ day before the installation and commissioning of the equipment, the buyer to pay the remaining purchase price of ________ million (¥: __________) yuan integer;
3, such as the buyer can not then pay all the goods within the time specified in the contract, exceeding the period, then you need to be paid every day according to the 5% of the total contract amount of liquidated damages to the seller.
(2) quality, technology
1, the equipment must be consistent with the signed model.
2. It conforms to the factory standard of the manufacturer.
(3) Mode of delivery
The seller is responsible for the transportation cost and delivered to the specified location at the time agreed by the buyer.
(4) Inspection and handover
Upon arrival and unpacking of the equipment, the buyer and seller must send representatives to count and inspect the equipment at the site, sign and record.
(5) Installation and training
1. The seller provides the requirements, and the buyer is responsible for the decoration of water, electricity and other required environmental requirements.
2. The seller is responsible for equipment installation, commissioning and operator training in China.
(6) After-sales service: the above equipment free warranty - years, lifelong maintenance. (Note: The buyer needs to use the seller's specified consumables, otherwise, the resulting machine failure is not covered by the warranty).
(7) the way to resolve disputes over the contract
After the contract is signed, the contract shall not be revoked without the consent of both parties, if there are outstanding issues that the two sides can be resolved through negotiation.
(8) This contract in duplicate, each party to sign a copy of the two sides, since the two sides signed and entered into force.
Party A (official seal):________________ Party B (official seal):___________________
Legal representative (signature):_________ Legal representative (signature):_____________
_________ year ______ month ______ __________ __________ ________ ______
Equipment Purchase and Sales Contract Sample Five Related Articles :
★ Equipment Purchase and Sales Contract Sample Simple 3
★ Audio Equipment Sales Contract Latest Sample 5
★ Equipment Sales >
★ 5 Sample Purchase and Sale Contracts for Products