How are safe and civil construction rates calculated? What is included in the construction cost?

Construction safety protection, civilized construction measures cost is composed of "construction and installation project cost item composition" in the measures included in the cost of environmental protection fees, civilized construction costs, safety construction costs, temporary facilities costs, etc.. Nowadays, safety and civilization construction is advocated, so how is this safety and civilization construction rate calculated? What does the construction cost include? Here's a look at it.

1 What is the safety and civilization construction costs?

Safety and civilization construction costs are in accordance with the current national construction safety and the environment of the construction site as well as health standards related to the provisions of the acquisition and renewal of construction protective equipment and facilities need to spend. Construction includes a lot, there are building decoration, electrical installation, and other various professional construction.

2 safety and civilization construction costs included

Environmental protection costs, such as we often see in Beijing, dust nets, site workers project employees daily living garbage disposal.

Civilized construction costs, site entrance to the "five signs and a map" I'm afraid to be familiar with, in addition to first aid medication, heat stroke prevention measures, such as boiling some green bean water, huh, and showers, electric fan equipment costs.

Safety construction costs, such as "three treasures": helmets, safety belts, safety nets, "four mouths": stairway, elevator mouth, channel mouth, reserved holes. The state expressly prohibits the cost of safety and civilization construction measures as a competitive project.

Temporary facilities costs, the site of that piece of movable boarding house, office, civilian dormitory, canteen, toilets, temporary roads and so on.

3 safety construction cost components

Safety helmets, safety ropes and other production worker safety supplies and appliances purchased labor protection costs.

Fire fighting facilities and fire fighting equipment configuration costs.

Safety training, education, publicity costs.

Security and order management costs.

Other fixed amount includes the cost of safety construction.

Three-stage distribution box, two-stage protection device, and external electricity protection measures cost for electricity for construction safety.

The cost of safety protection measures for cranes, tower cranes and construction elevators.

Special testing and inspection costs of lifting machinery on construction sites.

The cost of safety protection facilities in the operation area of on-site construction machinery.

4 civilized construction fee components

Temporary facilities costs. Including temporary offices, dormitories, canteens, construction fences, footpaths, structures and buildings within the construction site.

The cost of temporary on-site medical, rescue and health care items.

Costs for production workers to prevent summer heat and cold.

Other civilized construction costs included in the quota.

5 Rate of safety and civilization construction fee

Environmental protection fee. Environmental protection fee = direct project cost × environmental protection fee rate (%)

Civilized construction fee. Civilized construction fee = direct project cost × civilized construction fee rate (%)

Safety construction fee. Safety construction fee = direct engineering fee × safety construction fee rate (%)

Temporary facilities fee, temporary facilities fee has the following three components:

(1) turnover use of temporary construction;

(2) one-time use of temporary construction;

(3) other temporary facilities.

6 Summary

Safety and civilization construction management is to strengthen the standardization of site management, but also to improve the management level of the company's site individual projects, to enhance the company's own image, to build the company's brand strength, in order to meet the needs of the market, but mainly in line with the construction of standardized safety construction environment for the purpose of the purpose of the construction, but also for the purpose of better improving the quality of work.