What are the tips for renovation, what is the knowledge of renovation you can learn to warm up first, in order to prevent renovation traps, to understand the renovation program. Next, I will discuss tianjin decoration design and decoration construction process through tuba rabbit editorial. Interested friends can pay attention to it, I hope to help you.
Tianjin renovation design and decoration construction process
NO1, Tianjin renovation design
a, construction preparation
1, construction water, electricity, roads and other facilities are still used in the main construction facilities, must be carefully inspected to be able to use it can only be used after the reinforcement of repair.
2. Material transportation: horizontal transportation using manual reversal; vertical transportation using construction elevator.
3, all materials need to be re-tested and input materials before entering the market.
4. Prior to each process, skilled labor should be selected for sample room construction. The sample room must be accepted and confirmed by the owner, supervisor and design institute.
Two, the specific construction process
1, external decorative works
(1) external wall plastering
Foundation treatment → nailing network → pull straight line → sticking ash cake punch → 12mm thick 1:3 cement mortar priming → 6mm thickness 1:2.5 cement mortar leveling → curing.
(2) external brush coating
Clean grass-roots level→composition→scraping putty→brush the first layer→brush the second layer→live, acceptance.
(3) dry-hanging granite
basic level treatment→application of gray→under the expansion pipe→copper wire binding stone→set stone→find level vertical→maintenance→live, acceptance.
2, interior decoration works
(1) interior wall plastering
Doors, windows and plumbing pipe cards have been installed → concrete node blockage site has been chiseled, blocked and cleaned grass-roots level → watering → easy to crack, easy to empty the steel plate mesh → corners of the corner, the top corners have been added or lined with expanding cement mortar → wall surface gross → rough base → test for drumming → used for the ribbing → wiping the bottom of The wall is Gray → Maintenance.
(2) interior wall latex paint
Clean the grass-roots level → scraping putty → first brush coating → second brush coating → third brush coating → clean surface → live, acceptance.
3, floor decoration works
(1) granite floor
foundation cleanup → elastic line → brush cement slurry → test drainage → laying cement mortar bonding layer → paving granite → rubbing the seam → curing → living and acceptance.
(2) floor tile floor
Cleaning the grass-roots level → primer mortar application → elastic line, looking for rules → tile → joints → repair → acceptance and living.
4, bathroom renovation project
(1) floor non-slip floor tiles
Foundation treatment → 40 thick C20 fine stone concrete (cement mortar leveling layer) → polyurethane coating waterproofing → wipe the bottom mortar → elastic line , looking for the rules → paving → connecting → curing → acceptance, handover
(2) glazed tile construction
Clean grass-roots level → flexible Horizontal, vertical control line → pad ruler → paving → acceptance, acceptance, and real time.
5, ceiling project
Elastic line → installation of the main keel → installation of the main keel → installation of the secondary keel → adjustment, repair, brush anti-rust paint → installation of the cover plate → cleaning and protection.
6, windows and doors
(1) plastic steel doors and windows installation
Doors and windows frame gap using polystyrene board or cotton veneer, double-sided rubber seal.
(2) wood door installation
Should be set according to the location and size of the drawings of the door and window openings? The holes should be 30-40mm larger than the doors and windows.
Three, finished product protection
1, when installing plastic steel doors and windows, do not allow the protective film to tear, so as not to cause surface abrasion.
2, when plastering the wall, it is strictly prohibited to use wooden boards lying on the window frame to avoid deformation of the window frame.
3, construction should avoid iron pipe or other tools to contact and smash the window frame, so as not to scratch the surface of the window frame to cause scratches, damage and deformation.
4, paving the floor tile is completed, it is strictly prohibited to step on people within 4-5 days.
5. In the construction process, it is strictly prohibited to use steel pipes and iron pipe products to litter the finished floor tiles, resulting in cracks in the floor tiles and hanging corners and other problems.
6. When painting the wall, it is strictly prohibited to pollute the floor, doors and windows and other finished products.
7. When the wall coating is not completely dry, it is strictly prohibited to clean the floor and cause wall pollution.
8. Graffiti and nails are strictly prohibited on finished building walls. Urinating inside the building is strictly prohibited.
9. It is strictly prohibited to transport all kinds of tools, such as iron pipes and ducts, from the stairwell where handrails and balustrades are installed.
Tianjin decoration design decoration construction process
Through the above understanding of the Tianjin decoration plan and decoration construction process, I hope you can solve the decoration problem as soon as possible, what do you know, the decoration problem has always been No I believe that if you master these, you can easily decorate the house. If you have other decorating problems, please pay attention to the soil rabbit.
Tubapu online free for everyone to provide "each home decoration offer, 1-4 local decoration company, 3 sets of decoration design program", and decoration to avoid pit strategy! Click on this link:/yezhu/zxbj-cszy.php?to8to_from=seo_zhidao_m_jiare&wb, you can get free Oh~