How long does it take to install and commission the equipment of a normal sewage treatment station

1-Civil engineering and equipment interface

2-Water and electricity docking:

3-Working unit debugging

4-Water quality testing

The above is for the general small and medium-sized integration of equipment for the installation of the process of analysis, the overall calculation of the general need to be 3 - 4 days time, if the Do not have to test each link, only need to install and put into use, a day is enough, small micro-device or even half an hour can be done.

But for municipal sewage treatment plants, sewage treatment stations, most of the sewage treatment units are separate, the middle with a variety of civil construction of the pool connection, almost every sewage treatment unit, is an oversized equipment, this single device light unloading to the placement of the vehicle in place on the need for 3 - 8 hours, each link Add up, plus equipment commissioning, the final engineer left the field, often need 15 days or even 1 month to be able to.

For more information: /Item/Show.asp?m=1&d=3077