Equipment Acceptance Application Report
How to write an application report about equipment acceptance? The following is the application report for equipment acceptance organized by application.com, hope it can help you.
Equipment acceptance application report (a)
xx Fire Brigade:
My unit developed xxx project fire facilities and equipment have been designed and reported to the program construction is complete, please be accepted.
xxxx unit
Year month
equipment acceptance application report (two)This project, since the start of construction, in the higher leadership, quality supervision station, construction units, design units, supervision units and the relevant departments of the strong support, through the efforts of all employees involved in the construction and hard work, the project passed the five-party body pre-acceptance work on December 21, 20XX And completed the relevant issues 'quality rectification closure, now the fire project has been completed and acceptance conditions, the following specifics of the project report as follows:
First, the project overview:
1, ************ and Plaza Road intersection, south of Plaza Road, north of Feipeng Lane, west of Xinhe Street, east of the residential area. Is a concentrated residential area, for the fire key control units, the project building for the underground layer, above ground 18 ~ 22 layers, independent podium two layers. The total construction area is 40192m2, underground part 5252.34m2. the total building height are: 64.3m, 70.30m, 80.90m, 9.30m. the first floor height is 4.50m, the second floor height is 4.80m, the third floor height is 4.50m; basement height are: motor vehicle storage 5.60m; equipment room 4.80m non-motorized storage 3.80m. underground room 3.80 m. There are two fire escapes in the basement, a fire pool with a design capacity of 400 m3 and a special pool for sprinkler with a design capacity of 18 m3, a fire exhaust fan room, a self-powered room and other equipments, and two fire staircases are set up on the second floor to the third floor of the shopping mall. The roof has an elevator machine room, positive pressure fan room and fire pool design capacity of 18m3 and other facilities.
2, building category and fire resistance level: a high-rise building and basement, fire resistance level for the first, the north side of the commercial part of the second multi-storey building, fire resistance level for the second.
3. The main structure adopts fully cast-in-place reinforced concrete frame? The frame-supported shear wall structure is connected with the basement, which is equipped with a car garage and a non-motorized garage. The first and second floors are equipped with shopping malls, offices and other public **** places, the third floor is set up as an elevated floor (technical floor), open-air part of the roof garden and other recreational areas; the fourth floor and above for residential.
Second, the use of engineering functions:
1, the fire alarm system of this project adopts the fire center control system, by the automatic alarm system, floor evacuation instruction system, fire hydrant system, sprinkler system, fire exhaust system, positive pressure air supply system, fire broadcasting and fire telephone and other systems. The fire center is located on the first floor of D-1 building, and the fire center is controlled by centralized alarm controller.
2, the project linkage system for centralized control, linkage console is located on the first floor of the fire control center, the linkage function is mainly: fire alarm to stop the exhaust fan, open the smoke exhaust port and positive pressure air supply port, start the smoke exhaust fan and positive pressure air supply fan, after the fire is confirmed to be connected to the alarm device, 10-15 seconds after the connection of emergency broadcasting, organizing the evacuation, and at the same time, start the fire pumps, spray pumps, elevators, and so on. The elevator is forced to descend to the ground floor.
3, the fire control room linkage logic and manual functions: a, manual button action, immediately linked to the fire equipment. b, hydrant button action, immediately start the fire pumps and sprinkler pumps. c, smoke detection, temperature sensors, water flow indicators and other alarms, should be confirmed before linking the fire equipment. d, the fire emergency broadcasting loudspeakers, smoke vents and pause air conditioning units and other functions should be linked to the fire floor and the upper and lower floors. e, the fire control room, the emergency broadcasting loudspeakers, smoke vents and pause air conditioning units, etc., should be linked to the fire floor and the upper and lower floors.
Third, the construction process:
Our company has established a quality responsibility system for all departments and managers at all levels, clearly define their respective quality responsibilities, and establish a perfect engineering self-inspection system, with a clear division of labor and responsibility. Strict control of the entire project construction process, in each sub-construction, a strict technical briefing, and based on the technical briefing requirements and evaluation standards for inspection, acceptance, tracking synchronization, the technical review project, after passing the self-checking, reported to the Quality Supervision Station, the construction unit and the supervisory unit of the parallel acceptance, in line with the design requirements and acceptance specifications, and then proceed to the next process of construction. Site use of a variety of materials are required to have qualified conditions, unqualified, cluttered products out of the door (the main fire materials manufacturers and the number of purchases see Exhibit 1).
In the construction process by my company, the project department's unremitting efforts, the hard work of all employees, I construction have been according to the design requirements and acceptance of the provisions of the norms, as well as the contract agreed to the content of the construction, the completion of the work of all equipment by the commissioning of the normal operation of the alarm system, the test company tested by the qualified,
Fourth, the construction of the remaining problems:
1
2, due to the power supply bureau is responsible for the installation of equipment in the distribution room, has not been fully completed, the power supply used by the current equipment for the site of temporary power, the load can not run at the same time too long.
3, due to construction time is too tight, as well as other objective factors, the function of the system debugging process, there are some minor problems.
Hereby
Salute!
Applicant:
20*** year ** month ** day
Equipment acceptance application report (three)First, the completion of the project:
xx County, xx homes 1, 2 # building project by xx County Housing Construction Company eleven project department in November 15, XX started construction, XX the end of March fully completed, lasted 16 months, according to the design approved by the Program has completed the main works, namely: civil decoration works; water supply and drainage works; electrical equipment installation works.
Second, the acceptance conditions check results:
According to the relevant provisions of the state, the project has been designed to complete the main engineering construction tasks. Reasonable use of investment in the project, the completion of the information has been prepared, the quality of engineering construction has passed the quality inspection of the quality supervision station, and issued a "project quality inspection assessment report", the quality of the project is qualified, has the formal acceptance conditions.
Third, the proposed acceptance time, location and participating units:
According to the completion of the project and the relevant requirements of the provincial and municipal authorities, xx County xx home 1, 2 # building project completion acceptance work is proposed to be prepared on the date of the month of January, acceptance of the location in , the participating units are the project sponsor, design, supervision, construction, quality supervision and other relevant units.
In summary, xx County xx home 1, 2 # building project has the completion of acceptance conditions, I implore the higher authorities to arrange for formal acceptance.
Hereby
Salute!
Applicant:
**Month**, 20**
;